US5626193A - Single horizontal wellbore gravity drainage assisted steam flooding process - Google Patents

Single horizontal wellbore gravity drainage assisted steam flooding process Download PDF

Info

Publication number
US5626193A
US5626193A US08/420,038 US42003895A US5626193A US 5626193 A US5626193 A US 5626193A US 42003895 A US42003895 A US 42003895A US 5626193 A US5626193 A US 5626193A
Authority
US
United States
Prior art keywords
steam
well
reservoir
horizontal
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
US08/420,038
Inventor
Ben I. Nzekwu
Peter D. Sametz
Peter J. Pelensky
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Canadian Natural Resources Ltd
Elan Energy Inc
Original Assignee
Elan Energy Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elan Energy Inc filed Critical Elan Energy Inc
Priority to US08/420,038 priority Critical patent/US5626193A/en
Assigned to ELAN ENERGY INC. reassignment ELAN ENERGY INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: NZEKWU, BEN IFEANYI, PELENSKY, PETER JOSEPH, SAMETZ, PETER DAVID
Priority to CA002162741A priority patent/CA2162741C/en
Priority to PCT/CA1996/000222 priority patent/WO1996032566A1/en
Priority to AU52651/96A priority patent/AU5265196A/en
Application granted granted Critical
Publication of US5626193A publication Critical patent/US5626193A/en
Assigned to CANADIAN NATIONAL RESOURCES LIMITED reassignment CANADIAN NATIONAL RESOURCES LIMITED MERGER (SEE DOCUMENT FOR DETAILS). Assignors: RANGER OIL LIMITED
Assigned to RANGER OIL LIMITED reassignment RANGER OIL LIMITED MERGER (SEE DOCUMENT FOR DETAILS). Assignors: ELAN ENERGY, INC.
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2406Steam assisted gravity drainage [SAGD]

Definitions

  • This invention relates to a process for the recovery of viscous hydrocarbons from subterranean oil reservoirs by injecting steam and withdrawing oil and condensed steam from a single horizontal producing well.
  • Case (d) refers to processes based on U.S. Pat. No. 4,344,485 issued Aug. 17, 1982 to Butler which teaches a Steam Assisted Gravity Drainage technique where pairs of horizontal wells, one vertically above the other, are connected by a vertical fracture. A steam chamber rises above the upper well, and, oil warmed by conduction drains along the outside chamber to the lower production well.
  • two problems can be identified: firstly, the additional expense required to drill a second horizontal steam injection well above the horizontal producer makes the process uneconomical; secondly, in thin reservoirs there is insufficient vertical space in which to drill another horizontal well within an acceptable vertical distance from the horizontal producer.
  • U.S. Pat. No. 5,167,280 issued Dec. 1, 1992 to Sanchez and Hazlett discloses a solvent stimulation process for tar sands reservoirs whereby a viscosity reducing agent is circulated through an inner tubing string into a perforated horizontal well.
  • the recovery of oil is achieved by diffusion of the solvent/solute mixture into the reservoir, and removal of the oil along the horizontal well as the solvent circulation continues.
  • solvent processes are commercially impractical because they require long soak times during which the solvent and oil must remain in contact to have any mixing.
  • the wellbore pressure must be lower than the reservoir pressure in order to promote solvent diffusion. Under these conditions, the proportion of injected solvent which preferentially flows out of the reservoir will be substantially greater than that which rises into the reservoir, thus decreasing the effectiveness of the process.
  • U.S. Pat. No. 4,116,275 issued Sep. 26, 1978 to Butler et al. discloses a cyclic steam stimulation method of recovering hydrocarbon from tar sands formations via a horizontal wellbore completed with slotted or perforated casing means and with dual concentric tubing strings forming two annular spaces. Steam is injected into the reservoir through the second annular space between the liner or perforated casing and the outer tubing, while gas is introduced as insulating medium in the first annular space. Heated oil and steam condensate are produced to the surface through the inner tubing string.
  • U.S. Pat. No. 5,215,149 issued Jun. 1, 1993 to Lu discloses a process where heavy oil is recovered from reservoirs with limited native injectivity and a high water-saturated bottom water zone.
  • the horizontal wellbore is perforated only on its top side at selected intervals. It contains an uninsulated tubing string inserted to the farthest end.
  • a thermal packer is placed around the tubing to form two separated, spaced-apart perforated intervals along the horizontal well. Thereafter, steam is injected into the reservoir via the perforated interval near the heel of the horizontal well, while oil and steam condensate are removed via the inner tubing string at the distal and of the horizontal wellbore.
  • Three problems can be identified in the application of this process to an unconsolidated heavy oil reservoir.
  • this invention provides a method for recovering heavy oil from reservoirs in thin formations, which formations are provided with a drilled and cased well having the vertical section of the well cemented.
  • the well has a vertical portion and a horizontal portion wherein there is a foraminous liner along the horizontal portion.
  • the horizontal portion has a proximal end and a distal end.
  • the method provides an insulated steam injection tubing within the vertical and horizontal portions of the well, extending to near the distal end of the horizontal portion.
  • a production tubing is provided within the vertical portion of the well terminating adjacent the lower end of the vertical portion of the well.
  • Steam vapour and hot water condensate are injected into the steam injection tubing whereby a portion of the injected steam flows through the liner back towards the vertical portion of the well.
  • the injected steam vapour rises and is driven by pressure and buoyancy vertically into the reservoir and heats the oil and the heated oil and steam condensate drain downward and towards the proximal end of the horizontal portion through the foraminous liner into said annulus and are transported to the surface through said production tubing.
  • FIG. 1 is a cross-sectional perspective view through a heavy oil reservoir and the horizontal wellbore which penetrates the hydrocarbon-bearing zone.
  • FIG. 2 is a schematic cross-sectional view of the horizontal wellbore of FIG. 1 illustrating the various stages in the development and movement of the steam chamber along the horizontal wellbore during the recovery process according to the invention.
  • FIG. 3 is a schematic cross-sectional view of the distal end of the wellbore of FIG. 1 illustrating the use of a thermal packer with an embodiment of the invention.
  • FIG. 1 the drawing illustrates a subterranean unconsolidated formation or reservoir 10, which contains initially mobile or partially mobile but viscous heavy oil deposit.
  • a wellbore having a substantially vertical section 12 and a substantially horizontal section 14 penetrates the formation. The techniques for drilling a horizontally deviated wellbore are well established and will not be discussed further.
  • a continuous casing element 16 extending through the vertical section is cemented to the surrounding earth with preferably thermally stable cement. Though the described process can be applied to non-thermally equipped wells especially for lower pressure operations, a thermally-stable cement avoids potential heat damage to the vertical section of the well.
  • the horizontal section 14 is completed with a slotted liner 18 having perforations extending essentially along the entire length of the wellbore. Initially oil is recovered from the reservoir under primary production, solution-gas drive mechanisms. While initial production is not a condition for the application of this invention, it improves the injectivity of steam in the follow-up process.
  • the well is recompleted to contain two tubing strings 20 and 22 of diameter much smaller than the diameter of casing.
  • One of these strings, the production tubing string 20, is disposed in the well and terminates at a downhole production pump 24 set near the beginning or heel 26 of the horizontal section of the wellbore.
  • the second string (the insulated steam injection tubing string 22) is also disposed in the horizontal wellbore and extends from the surface to within 20 to 50 meters of the distal end or toe 28 of the horizontal wellbore 14.
  • a buffer zone 30 is created in a region of maximum pressure forces. This allows accumulation of sand that might inadvertently drop into the buffer zone 30 of the horizontal section 14 during higher injection pressures due to the unconsolidated nature of the sand.
  • An annulus 34 is defined between the steam tubing and the slotted liner 18.
  • Step I Wellbore conditioning and cleaning phase
  • This stage is intended to conductively heat up the horizontal wellbore through hot fluid circulation and thus increase the heated radius within the reservoir to about 1 or 2 meters.
  • the duration of this phase should be up to 45 to 60 days depending on length of the well and volume of steam that can be delivered through the injection tubing.
  • a hot wellbore area ensures that the viscosity of the oil flowing in the region is sufficiently reduced compared to the viscosity of unheated oil. This results in the sand-carrying capacity of the oil being drastically reduced as the oil and hot condensate drain through this region into the wellbore.
  • Hot fluid circulation also cleans up the wellbore after primary production and conditions the surrounding reservoir for the steam chamber development phase. A final near wellbore temperature of about 150° C. is considered adequate. For oil sands and bitumen reservoirs where the oil is initially immobile, this circulation step could take up to 90 days to adequately heat up the wellbore region along the horizontal well.
  • the withdrawal of oil and hot condensate should be controlled such that an annular liquid column 32 is established within the vertical section 12 to provide a bottomhole pressure close to the desired operating pressure.
  • the method of the invention can be operated under a wide range of reservoir pressures, and would be particularly suitable to low pressure and pressure-depleted reservoirs. For these applications, a smaller liquid head is required in the vertical section and this determines the operating pressure and hence the effective steam temperature regime.
  • Step II Steam chamber initiation phase
  • high quality steam (greater than 50%) is injected at moderate rates but especially at pressure below the fracture pressure of the reservoir.
  • a thermocouple 36 placed at the toe of the well can be used to monitor wellbore temperature at the steam exit and provide an estimate of this injection pressure. For unconsolidated formations, excessive pressure changes can fracture the reservoir or cause severe sand movement within the near well region, and should be avoided.
  • the duration of the chamber initiation phase is about 30 days.
  • Step III Chamber propagation
  • the last stage in the process is the expansion and propagation of the chamber across the drainage area of the horizontal well.
  • the bottomhole production pump is operated to ensure maximum-liquid withdrawal, but at a rate that maintains the desired annular fluid level within the vertical section 12 of the well, without hindrance to the continued propagation of the steam chamber.
  • a constant or nearly constant annular fluid level is a measure of the pressure exerted at the production end and causes the reservoir into a gravity dominated distribution of pressures within the reservoir.
  • heated oil and steam condensate drains downward to the perforated horizontal wellbore.
  • the steam chamber 38 grows vertically towards the top of the reservoir under the influence of bouancy.
  • the longitudinal growth of the chamber along the horizontal well i.e. from the toe towards the heel is promoted by the steam drive effect due to two forces, namely the pressure increase caused by the injection of steam at the toe of the well and small pressure drop that exists along the horizontal well as a result of friction in the annular space between the insulated injection tubing and the slotted liner.
  • the lateral propagation of the chamber from the wellbore occurs as a result of heat conduction from the chamber along with convective flow due to higher steam injection pressures.
  • FIG. 2 illustrates the stages of the development and propagation of the steam chamber in the gravity-drainage assisted single horizontal wellbore steamflood process.
  • the effect of the insulation on the steam injection tubing string 22 is to moderate the heat transfer so that a fairly high quality steam can reach the distal end 28 of the wellbore. Because of the low pressure drop in the annulus 34, the steam flows into the annulus 34 and is distributed along the length of the horizontal well towards the production outlet pump 24.
  • a steam chamber 38 develops preferentially at the distal end 28 of the horizontal wellbore.
  • the greater steam influx into this region and more rapid draining of oil and condensate allows the chamber to grow faster, advancing vertically towards the top 40 of the reservoir 10 and also laterally into the interwell region.
  • Step II in the prescribed invention is designed to accelerate the initiation of this chamber in reservoirs where initial depletion is low. As more steam is injected, the constant drainage of reservoir fluids along the horizontal well aids the longitudinal growth of the steam chamber 38 towards the heel 26 of the horizontal well.
  • the heat loss to the overburden 42 which is initially low increases as the steam chamber reaches the top 40 of the formation 10 along which it spreads with continued steam injection.
  • non-condensible gases released from the oil due to the reaction with steam often accumulate at the top of the reservoir and can serve to cushion off the heat loss to the overburden 42. This can be supplemented with the injection of a non-condensible gas such as nitrogen with the steam.
  • the penetration of the steam into the reservoir can be increased by using a thermal packer 44 installed at the distal end of the steam injection tube 22, as shown in FIG. 3.
  • the thermal packer blocks the annulus and allows the steam to be injected at greater pressure into the reservoir.
  • the packer is placed within a blank section of liner material near the exit end of the tubing.
  • the packer which is usually no more than one meter long divides this annulus section with one pressure on the proximal end and another pressure at the distal end. Without a packer the pressures are nearly equal.
  • With a packer the direct communication between the exit end of the injection tubing and the annulus is partially blocked so that pressure on the distal end is higher. This increased pressure will force more steam and condensate directly into the reservoir.
  • the injected fluid stream does not return directly to the annulus but must first flow through the reservoir.
  • the heated oil and steam condensate eventually flow back to the annulus at the proximal end of the packer.
  • the packer is run in the horizontal well unset or in the open position at the distal end of the steam tubing. The setting is accomplished remotely after placement or can be thermally activated as the high temperature steam is injected.
  • the bottom of the formation contains various thickness of bottom water zones.
  • oil production from the horizontal well will usually be accompanied by large water production as the oil-water contact between the oil layer at the top and the bottom water zone is pulled into the well.
  • the constant pressure operation described in this invention is particularly suited to such reservoir. In the absence of any appreciable pressure drawdown, the oil-water contact remains virtually undisturbed and the oil can be produced without massive water influx.
  • the horizontal wells are frequently located much higher in the formation to avoid the influx of the water.
  • the initial formation of a steam chamber is not a high priority.
  • the required enhancement in oil production can be obtained by heat addition mostly by conductive heating to the near-well region.
  • the process will then be operated at a constant pressure close to the pressure in the aquifer.
  • artificial lift When reservoir pressure is not sufficient to sustain flow of oil to the surface at adequate rates, the natural flow must be aided by artificial lift.
  • the preferred mode of artificial lift system described in this invention is a downhole productions pump 24 to lift the heated oil and condensate to the surface.
  • this artificial lift can also be accomplished using a gas (hence a gas lift).
  • the gas is injected from the surface into the lower part of the production tubing to aerate the fluid, reduce the pressure gradient and cause the fluid to flow to the surface, and also reduce the back pressure at the formation.
  • the method and design of a gas lift system is well known to those familiar with the art.
  • the gas is injected into the annular space in the vertical section of the well where gas inlet valves provided in the vertical tubing allow entry of gas into the production tubing where it mixes with the produced fluids, decreases the flowing pressure gradient and thus lowers the bottomhole flowing pressure.

Abstract

Disclosed is a gravity-drainage assisted steam flooding process for the recovery of all from thin viscous heavy oil reservoirs using a single horizontal wellbore. Steam is injected through a fully or partially insulated tubing to exit at or near the toe of a long horizontal well penetrating a viscous oil reservoir. Initially, low (10-30%) quality steam is circulated along the well to condition the wellbore and increase the heated radius to about 1 or 2 meters. Oil and reservoir fluids immediately adjacent to the wellbore are produced through the annular space between the insulated tubing string and a slotted liner that surrounds it. After the period of low quality steam circulation, the production outlet is shut in or constrained and steam injection is continued to initiate an active steam chamber zone along a portion of the wellbore. Subsequently, fluid withdrawal is resumed at the production outlet, while the annular liquid level in the vertical section is controlled to maintain a nearly constant pressure at the production outlet. The injection of a higher (50-70% or more) quality steam is continued at a rate similar to or higher than the initial rate to cause the expansion and propagation of the active steam heated volume vertically towards the top of the formation, longitudinally along the horizontal well from the toe towards its heel, and laterally away from the well towards the inter-well boundary with the next row of horizontal well. As steam flows into the reservoir under both gravitational counter current flow and pressure drive, the oil, steam condensate and reservoir fluids heated both conductively and convectively drain towards the slotted liner annulus of the horizontal wellbore and is then pumped to the surface.

Description

FIELD OF THE INVENTION
This invention relates to a process for the recovery of viscous hydrocarbons from subterranean oil reservoirs by injecting steam and withdrawing oil and condensed steam from a single horizontal producing well.
BACKGROUND OF THE INVENTION
The deposits of Canadian heavy oil found in the Lloydminster reservoirs exist in thin zones, often only 5 to 20 meters thick, but of considerable lateral extent and sometimes underlain by bottom water. Unlike the bitumen deposits in the Athabasca and Cold Lake reservoirs which are essentially immobile, oil from these unconsolidated deposits flows under normal solution-gas drive primary recovery mechanisms. With the recent introduction of horizontal well drilling, conventional exploitation of these deposits by vertical wells has now been replaced by horizontal wells, sometimes as much as 1000 meters long. The primary recovery scheme now takes advantage of the large contact area possible between the reservoir and the long horizontal wellbore, in addition to the reduced inflow pressure gradients. Oil production (withdrawal) at rates much higher than with the vertical wells in now easily achievable.
One consequence of the rapid and large withdrawal rates from these reservoirs is the equally rapid reduction of reservoir pressure. Additionally, a significant amount of sand is sometimes produced with the oil due to the unconsolidated nature of the formation, and this results in highly expensive well cleanout procedures. As a result, total recoverable oil from these pools is generally no higher than 15% of the original in-place hydrocarbons. Since this primary production phase leaves the reservoir highly pressure depleted yet saturated with at least 80% of the original oil, some form of supplemental or enhanced recovery process is needed to produce additional oil from the reservoir. Among the various possible processes for recovery of this oil, steam injection is generally regarded as the most economical and efficient. Steam can be used to heat the oil, reducing its viscosity and thereby improving its ability to flow to the production well. In some instances steam is also used to drive the mobilized heated oil towards the production means.
Some of the current practices for transporting the steam heat into the reservoir to heat the oil include the use of:
(a) vertical steam injection wells drilled to the same depth as the horizontal producing well, but located at some lateral distance from the horizontal producing well;
(b) vertical steam injectors drilled into the same formation but located immediately above the horizontal producing well;
(c) horizontal steam injectors drilled parallel to the horizontal producing well but located at the same or slightly higher reservoir depth and at considerable lateral distance from the horizontal producing well;
(d) horizontal steam injectors drilled into the same formation but located vertically above the horizontal producing wells.
All these steam injection schemes and well configurations have unique characteristics that make them inadequate for enhanced recovery from the thin mobile heavy oil reservoirs.
In case (a), injected steam must sweep through the inter-well distance between the vertical injector well and the horizontal producing well and, in the process, transfer heat to mobilize the oil which is then produced through the horizontal well. However, it has been found that the high pressures required to inject and disperse the steam towards the horizontal wells also create stress changes in the reservoir. These stresses cause increased movement of sand which inhibits oil production at the well. Additionally, the development of preferred high flow paths between the vertical injector and the horizontal producing well creates a short circuit for steam flow and causes excessive steam production and severe operational problems. As a result of gravity override, the vertical shape of the preferred path limits the area available for heat transfer from steam and hot condensate to make the recovery process economic.
In case (b), thin heavy oil reservoirs do not provide sufficient vertical space to allow placement of a vertical injector above the horizontal production well, especially if there is a bottom water zone below. Also, with injection directly above the producer, the potential for sand displacement into the producing well is increased. Furthermore, more than one vertical steam injector will generally be required to cover the span of the horizontal well adding to the increased cost for this scheme.
Case (c) is illustrated by Canadian Patent 1,260,826 (also U.S. Pat. No. 4,700,779 issued Oct. 20, 1987) issued on Sep. 26, 1989 to Huang et al which discloses a method of recovering hydrocarbons using parallel horizontal wells as steam injection and production wells. Steam is injected into two parallel horizontal wells to stimulate the formation and then the second horizontal well is converted to a production well. However, such steam injection method may not be advantageous if no control is applied to the manner of steam outflow into the reservoir. Steam injected into a horizontal well may not be distributed uniformly into the reservoir because steam flow in the reservoir is usually controlled by heterogeneity along the well. U.S. Pat. No. 5,141,054 issued Aug. 25, 1992 to Alameddine et al. teaches a method of steam injection down a specially perforated tubing to cause uniform steam injection by choked flow and uniform heating along the wellbore.
Case (d) refers to processes based on U.S. Pat. No. 4,344,485 issued Aug. 17, 1982 to Butler which teaches a Steam Assisted Gravity Drainage technique where pairs of horizontal wells, one vertically above the other, are connected by a vertical fracture. A steam chamber rises above the upper well, and, oil warmed by conduction drains along the outside chamber to the lower production well. However, for the thin heavy viscous oil reservoirs, two problems can be identified: firstly, the additional expense required to drill a second horizontal steam injection well above the horizontal producer makes the process uneconomical; secondly, in thin reservoirs there is insufficient vertical space in which to drill another horizontal well within an acceptable vertical distance from the horizontal producer.
Recently, a number of patents have pursued the concept of single horizontal wellbore oil recovery methods. U.S. Pat. No. 5,167,280 issued Dec. 1, 1992 to Sanchez and Hazlett discloses a solvent stimulation process for tar sands reservoirs whereby a viscosity reducing agent is circulated through an inner tubing string into a perforated horizontal well. The recovery of oil is achieved by diffusion of the solvent/solute mixture into the reservoir, and removal of the oil along the horizontal well as the solvent circulation continues. However, despite the recommended use of horizontal wells, solvent processes are commercially impractical because they require long soak times during which the solvent and oil must remain in contact to have any mixing. Also, the wellbore pressure must be lower than the reservoir pressure in order to promote solvent diffusion. Under these conditions, the proportion of injected solvent which preferentially flows out of the reservoir will be substantially greater than that which rises into the reservoir, thus decreasing the effectiveness of the process.
U.S. Pat. No. 4,116,275 issued Sep. 26, 1978 to Butler et al. discloses a cyclic steam stimulation method of recovering hydrocarbon from tar sands formations via a horizontal wellbore completed with slotted or perforated casing means and with dual concentric tubing strings forming two annular spaces. Steam is injected into the reservoir through the second annular space between the liner or perforated casing and the outer tubing, while gas is introduced as insulating medium in the first annular space. Heated oil and steam condensate are produced to the surface through the inner tubing string.
U.S. Pat. No. 5,148,869 issued Sep. 22, 1992 to Sanchez discloses a single wellbore method and apparatus for in-situ extraction of viscous oil by gravity action using steam plus solvent vapour. One serious limitation of this invention in a practical application is that the method hinges on the use of a specially designed horizontal wellbore containing two compartments. Steam flows into the formation through a condult perforated only along the upper portion of the horizontal wellbore, while oil and condensate flowing downwardly from the reservoir collect in a pool around the wellbore and is pulled into an inner compartment perforated essentially only along the base of the wellbore. Using this apparatus with steam injection into the upper perforated conduit, it would be nearly impossible to transport steam effectively to the toe of the horizontal well or distribute the steam uniformly along the well without a short circuit to the production conduit below.
U.S. Pat. No. 5,215,149 issued Jun. 1, 1993 to Lu discloses a process where heavy oil is recovered from reservoirs with limited native injectivity and a high water-saturated bottom water zone. The horizontal wellbore is perforated only on its top side at selected intervals. It contains an uninsulated tubing string inserted to the farthest end. A thermal packer is placed around the tubing to form two separated, spaced-apart perforated intervals along the horizontal well. Thereafter, steam is injected into the reservoir via the perforated interval near the heel of the horizontal well, while oil and steam condensate are removed via the inner tubing string at the distal and of the horizontal wellbore. Three problems can be identified in the application of this process to an unconsolidated heavy oil reservoir. First, a large amount of sand will be transported into the inner production tubing as the steam sweeps through one set of perforation interval then through the reservoir and is produced through the other set of perforated intervals. Secondly, once a communication path is established between the injection interval and production interval, steam will find an easy way to short circuit the reservoir resulting in poor displacement efficiency. Additionally, the scheme will promote very high heat losses as the produced fluids flowing through the tubing are heated by the steam as it enters the heel of the horizontal well.
As indicated, the referenced patents individually have severe limitations which make the processes described impractical and/or uneconomic for field implementation, particularly in an unconsolidated heavy oil reservoir. What is needed is an economic method to thermally stimulate the viscous oil in these reservoirs using the same horizontal wellbores as have already been used for primary production.
SUMMARY OF THE INVENTION
Accordingly, this invention provides a method for recovering heavy oil from reservoirs in thin formations, which formations are provided with a drilled and cased well having the vertical section of the well cemented. The well has a vertical portion and a horizontal portion wherein there is a foraminous liner along the horizontal portion. The horizontal portion has a proximal end and a distal end. The method provides an insulated steam injection tubing within the vertical and horizontal portions of the well, extending to near the distal end of the horizontal portion. A production tubing is provided within the vertical portion of the well terminating adjacent the lower end of the vertical portion of the well. Steam vapour and hot water condensate are injected into the steam injection tubing whereby a portion of the injected steam flows through the liner back towards the vertical portion of the well. The injected steam vapour rises and is driven by pressure and buoyancy vertically into the reservoir and heats the oil and the heated oil and steam condensate drain downward and towards the proximal end of the horizontal portion through the foraminous liner into said annulus and are transported to the surface through said production tubing.
It is therefore a primary aspect of one embodiment of this invention to provide an economically viable method to recover viscous oil in an unconsolidated heavy oil reservoir using the same horizontal wells as have already been used for primary production.
It is another aspect of an embodiment of this invention to promote the enhanced or supplemental recovery of oil from unconsolidated heavy oil reservoirs with a gravity assisted process using a single horizontal wellbore.
It is another aspect of an embodiment of this invention to promote counter-current flow of injected steam rising and driven by pressure and buoyancy in the formation and heated oil and steam condensate draining downwardly to the horizontal producer.
It is another aspect of an embodiment of this invention to accelerate the gravity drainage recovery process by taking advantage of the pressure drop in the annular space formed by an insulated tubing string and a slotted liner or perforated casing to initiate a partial steam drive process, to drive the steam chamber from the toe of the well towards the heel.
It is another aspect of an embodiment of this invention to provide a continuous thermally enhanced oil production process from a single horizontal wellbore at the end of the primary production operation.
It is another aspect of an embodiment of this invention to provide a commercially viable oil production method which substantially reduces sand production during oil inflow into a single horizontal wellbore.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a cross-sectional perspective view through a heavy oil reservoir and the horizontal wellbore which penetrates the hydrocarbon-bearing zone.
FIG. 2 is a schematic cross-sectional view of the horizontal wellbore of FIG. 1 illustrating the various stages in the development and movement of the steam chamber along the horizontal wellbore during the recovery process according to the invention.
FIG. 3 is a schematic cross-sectional view of the distal end of the wellbore of FIG. 1 illustrating the use of a thermal packer with an embodiment of the invention.
DESCRIPTION OF THE PREFERRED EMBODIMENTS
Referring to FIG. 1, the drawing illustrates a subterranean unconsolidated formation or reservoir 10, which contains initially mobile or partially mobile but viscous heavy oil deposit. A wellbore having a substantially vertical section 12 and a substantially horizontal section 14 penetrates the formation. The techniques for drilling a horizontally deviated wellbore are well established and will not be discussed further. A continuous casing element 16 extending through the vertical section is cemented to the surrounding earth with preferably thermally stable cement. Though the described process can be applied to non-thermally equipped wells especially for lower pressure operations, a thermally-stable cement avoids potential heat damage to the vertical section of the well. The horizontal section 14 is completed with a slotted liner 18 having perforations extending essentially along the entire length of the wellbore. Initially oil is recovered from the reservoir under primary production, solution-gas drive mechanisms. While initial production is not a condition for the application of this invention, it improves the injectivity of steam in the follow-up process.
At the end of the primary recovery period, after approximately 5 to 10% of the initially in-place hydrocarbon is recovered, the well is recompleted to contain two tubing strings 20 and 22 of diameter much smaller than the diameter of casing. One of these strings, the production tubing string 20, is disposed in the well and terminates at a downhole production pump 24 set near the beginning or heel 26 of the horizontal section of the wellbore. The second string (the insulated steam injection tubing string 22) is also disposed in the horizontal wellbore and extends from the surface to within 20 to 50 meters of the distal end or toe 28 of the horizontal wellbore 14. By placing the injection tubing 20 to 50 meters short of the distal end of the wellbore, a buffer zone 30 is created in a region of maximum pressure forces. This allows accumulation of sand that might inadvertently drop into the buffer zone 30 of the horizontal section 14 during higher injection pressures due to the unconsolidated nature of the sand. An annulus 34 is defined between the steam tubing and the slotted liner 18.
Three major stages of the method which is the subject of this patent are summarized as follows:
Step I: Wellbore conditioning and cleaning phase
This stage is intended to conductively heat up the horizontal wellbore through hot fluid circulation and thus increase the heated radius within the reservoir to about 1 or 2 meters. The duration of this phase should be up to 45 to 60 days depending on length of the well and volume of steam that can be delivered through the injection tubing. A hot wellbore area ensures that the viscosity of the oil flowing in the region is sufficiently reduced compared to the viscosity of unheated oil. This results in the sand-carrying capacity of the oil being drastically reduced as the oil and hot condensate drain through this region into the wellbore. Hot fluid circulation also cleans up the wellbore after primary production and conditions the surrounding reservoir for the steam chamber development phase. A final near wellbore temperature of about 150° C. is considered adequate. For oil sands and bitumen reservoirs where the oil is initially immobile, this circulation step could take up to 90 days to adequately heat up the wellbore region along the horizontal well.
For lower pressure reservoirs, as the circulation phase matures, the withdrawal of oil and hot condensate should be controlled such that an annular liquid column 32 is established within the vertical section 12 to provide a bottomhole pressure close to the desired operating pressure. Using this method of downhole pressure control, the method of the invention can be operated under a wide range of reservoir pressures, and would be particularly suitable to low pressure and pressure-depleted reservoirs. For these applications, a smaller liquid head is required in the vertical section and this determines the operating pressure and hence the effective steam temperature regime.
For higher pressure reservoirs, it is not necessary to establish a liquid head equivalent to the pressure in the reservoir. Because of the strong communication with the annulus, the annular liquid level established controls both the annulus pressure and the steam pressure and temperature at the distal end of the injection tubing. Since the surrounding reservoir is at a pressure higher than the annulus pressure, the additional pressure drop aids the movement of heated oil and condensate towards the slotted liner.
Step II: Steam chamber initiation phase
Because of the limited voldage within the reservoir in the region of the distal end of the horizontal well at the start of the operation (maximum about 10%), initial steam rise into the reservoir along a long horizontal well is by buoancy (gravitational flow, i.e. due to the density difference between steam vapour and the resident reservoir fluids). While gravitational flow is persistent as heated oil and steam condensate continuously drain into the wellbore, it is generally a slow process. To accelerate the oil recovery process, this invention develops a steam chamber over part (approximately 10 to 20%) of the horizontal well. To achieve this, a greater amount of the injected steam has to be forced into the reservoir. With the strong communication between the steam tubing 22, the annulus 34 and the production tubing 20, a significant steam chamber cannot be formed without restricting steam production. This is particularly important for short horizontal wellbores. The production of steam can be restricted by two means:
(a) by producing oil and steam condensate at reduced rates to build an annular liquid level in the vertical section 12; or
(b) by shutting in the production for the duration of this stage.
In the preferred embodiment of the invention, high quality steam (greater than 50%) is injected at moderate rates but especially at pressure below the fracture pressure of the reservoir. A thermocouple 36 placed at the toe of the well can be used to monitor wellbore temperature at the steam exit and provide an estimate of this injection pressure. For unconsolidated formations, excessive pressure changes can fracture the reservoir or cause severe sand movement within the near well region, and should be avoided. The duration of the chamber initiation phase is about 30 days.
Step III: Chamber propagation
Having developed a steam chamber 38 along and especially at the toe of the horizontal well (FIG. 2a), the last stage in the process is the expansion and propagation of the chamber across the drainage area of the horizontal well. At this point the bottomhole production pump is operated to ensure maximum-liquid withdrawal, but at a rate that maintains the desired annular fluid level within the vertical section 12 of the well, without hindrance to the continued propagation of the steam chamber. A constant or nearly constant annular fluid level is a measure of the pressure exerted at the production end and causes the reservoir into a gravity dominated distribution of pressures within the reservoir. As steam rises, heated oil and steam condensate drains downward to the perforated horizontal wellbore. The steam chamber 38 grows vertically towards the top of the reservoir under the influence of bouancy. The longitudinal growth of the chamber along the horizontal well, i.e. from the toe towards the heel is promoted by the steam drive effect due to two forces, namely the pressure increase caused by the injection of steam at the toe of the well and small pressure drop that exists along the horizontal well as a result of friction in the annular space between the insulated injection tubing and the slotted liner. The lateral propagation of the chamber from the wellbore occurs as a result of heat conduction from the chamber along with convective flow due to higher steam injection pressures.
FIG. 2 illustrates the stages of the development and propagation of the steam chamber in the gravity-drainage assisted single horizontal wellbore steamflood process. As steam flows through the steam injection tubing string 22, it conductively heats the fluid in the annulus 34 which then conductively heats the fluids and surrounding reservoir 10. The effect of the insulation on the steam injection tubing string 22 is to moderate the heat transfer so that a fairly high quality steam can reach the distal end 28 of the wellbore. Because of the low pressure drop in the annulus 34, the steam flows into the annulus 34 and is distributed along the length of the horizontal well towards the production outlet pump 24. The constant pressure production due to the height of the liquid column 32 in the vertical section 12 constrains the reservoir to operate under a gravity dominated mode resulting in the buoyant rise of steam out through the slotted liner 18 and the counter-current flow of heated oil and steam condensate draining downwardly into the annulus 34. This process takes place along the entire horizontal section resulting in considerable oil production.
Because the pressure and temperature at the distal end 28 of the wellbore is greater than the pressure and temperature in the reservoir, a steam chamber 38 develops preferentially at the distal end 28 of the horizontal wellbore. The greater steam influx into this region and more rapid draining of oil and condensate allows the chamber to grow faster, advancing vertically towards the top 40 of the reservoir 10 and also laterally into the interwell region. Step II in the prescribed invention is designed to accelerate the initiation of this chamber in reservoirs where initial depletion is low. As more steam is injected, the constant drainage of reservoir fluids along the horizontal well aids the longitudinal growth of the steam chamber 38 towards the heel 26 of the horizontal well. The heat loss to the overburden 42 which is initially low increases as the steam chamber reaches the top 40 of the formation 10 along which it spreads with continued steam injection. In some reservoirs, non-condensible gases released from the oil due to the reaction with steam often accumulate at the top of the reservoir and can serve to cushion off the heat loss to the overburden 42. This can be supplemented with the injection of a non-condensible gas such as nitrogen with the steam.
The penetration of the steam into the reservoir can be increased by using a thermal packer 44 installed at the distal end of the steam injection tube 22, as shown in FIG. 3. The thermal packer blocks the annulus and allows the steam to be injected at greater pressure into the reservoir.
The packer is placed within a blank section of liner material near the exit end of the tubing. The packer which is usually no more than one meter long divides this annulus section with one pressure on the proximal end and another pressure at the distal end. Without a packer the pressures are nearly equal. With a packer, the direct communication between the exit end of the injection tubing and the annulus is partially blocked so that pressure on the distal end is higher. This increased pressure will force more steam and condensate directly into the reservoir. The injected fluid stream does not return directly to the annulus but must first flow through the reservoir. The heated oil and steam condensate eventually flow back to the annulus at the proximal end of the packer. In this application, the packer is run in the horizontal well unset or in the open position at the distal end of the steam tubing. The setting is accomplished remotely after placement or can be thermally activated as the high temperature steam is injected.
In some heavy oil reservoirs, the bottom of the formation contains various thickness of bottom water zones. Ordinarily, oil production from the horizontal well will usually be accompanied by large water production as the oil-water contact between the oil layer at the top and the bottom water zone is pulled into the well. The constant pressure operation described in this invention is particularly suited to such reservoir. In the absence of any appreciable pressure drawdown, the oil-water contact remains virtually undisturbed and the oil can be produced without massive water influx.
In a number of horizontal well applications in heavy oil reservoirs with moderately thick or active bottom water zones or aquifers, the horizontal wells are frequently located much higher in the formation to avoid the influx of the water. In applying the present invention to such a well arrangement, the initial formation of a steam chamber is not a high priority. The required enhancement in oil production can be obtained by heat addition mostly by conductive heating to the near-well region. In such an application, it is necessary to insulate only a section of the injection tubing along the horizontal section to increase the conductive heating along the wellbore. To maintain a constant oil-water contact, the process will then be operated at a constant pressure close to the pressure in the aquifer.
When reservoir pressure is not sufficient to sustain flow of oil to the surface at adequate rates, the natural flow must be aided by artificial lift. The preferred mode of artificial lift system described in this invention is a downhole productions pump 24 to lift the heated oil and condensate to the surface. However, this artificial lift can also be accomplished using a gas (hence a gas lift).
In the case of a gas lift, the gas is injected from the surface into the lower part of the production tubing to aerate the fluid, reduce the pressure gradient and cause the fluid to flow to the surface, and also reduce the back pressure at the formation. The method and design of a gas lift system is well known to those familiar with the art. In this application, the gas is injected into the annular space in the vertical section of the well where gas inlet valves provided in the vertical tubing allow entry of gas into the production tubing where it mixes with the produced fluids, decreases the flowing pressure gradient and thus lowers the bottomhole flowing pressure.
Various modifications and alterations of this invention will become apparent to those skilled in the art without departing from the scope and spirit of this invention. It should be understood that this invention is not to be unduly limited to that set forth herein for illustrative purposes. The process can be applied without significant changes to a variety of reservoir types and thicknesses including fractured, consolidated and partially consolidated heavy oil reservoirs, oil sands and bitumen reservoirs, with or without bottom water. The invention can also be applied to these reservoirs as grassroot processes without the need for an initial primary production. This is particularly relevant to reservoirs with an active bottom water zone.

Claims (20)

What we claim is:
1. A method for recovering heavy oil from reservoirs in thin formations, which formations are provided with a drilled, cased and cemented well having a vertical portion and a horizontal portion wherein there is a foraminous liner along the horizontal portion, the horizontal portion having a proximal end and a distal end extending into a wellbore, said method comprising:
(a) providing a steam injection tubing within the vertical and horizontal portions of the well, said tubing extending to near the distal end of said horizontal portion and being provided with insulation along said vertical portion and along said horizontal portion and extending towards said distal end substantially to said distal end to provide a minimal temperature gradient along said tubing;
(b) providing a production tubing within the vertical portion of the well terminating adjacent the lower end of the vertical portion of the well;
(c) injecting steam vapour and hot water condensate into the steam injection tubing to effect flow of a first portion of said steam vapour and hot water condensate along the liner back towards the vertical portion of the well and to effect transfer of a second portion of said steam vapour into said formation, the second portion of the injected steam vapour rising vertically into the reservoir and heating the oil to effect drainage of steam condensate and oil downward and towards said proximal end of the horizontal portion and drainage of steam condensate and oil through said foraminous liner to be transported to said surface through said production tubing.
2. The method of claim 1 wherein said steam vapour and hot water condensate are injected in two stages:
a. an initial stage wherein the steam quality is low; and
b. a subsequent stage wherein the steam quality is high.
3. The method of claim 2 wherein the steam quality in said initial stage is between approximately 10 and 30% and the steam quality in said subsequent stage is above about 50%.
4. The method of claim 3 wherein the initial stage results in the removal of reservoir fluids and the heating of the region of the reservoir within a radius of approximately 1 to 2 meters of the horizontal portion.
5. The method of claim 4 wherein during the subsequent stage, production from the well is decreased so as to increase the well pressure and thereby increase the amount of steam injected into the reservoir.
6. The method of claim 5 wherein the injected steam vapour creates an active steam chamber zone at the distal end of the well which propagates vertically, laterally and along the horizontal portion towards the proximal end of the horizontal well.
7. The method of claim 6 wherein the pressure in the well is controlled by the height of liquid in the vertical portion of the well.
8. The method of claim 7 wherein the heated hydrocarbon, steam condensate and reservoir fluids drain through the foraminous liner under the influence of gravity thereby minimizing sand production.
9. The method of claim 7 wherein the pressure in the annulus is less than the pressure in the reservoir thereby creating a pressure drive within the reservoir.
10. The method of claim 8 wherein said fluids are removed by a downhole pump attached to said vertical portion.
11. The method of claim 10 wherein said fluids are removed by gas lift.
12. The method of claim 10 wherein a thermal packer is placed near the distal end of the steam injection tubing to increase the pressure of the steam so as to increase the penetration of the steam into the reservoir.
13. The method according to claim 10 wherein said cemented well is provided with thermal concrete.
14. The method according to claim 13 wherein prior to injecting steam vapour and hot water condensate into the steam injection tubing, between about 5 and 10% of the in-well hydrocarbons are removed.
15. The method of claim 2 wherein during the subsequent stage, production from the well is decreased so as to increase the well pressure and thereby increase the amount of steam injected into the reservoir.
16. The method of claim 3 wherein during the subsequent stage, production from the well is decreased so as to increase the well pressure and thereby increase the amount of steam injected into the reservoir.
17. The method of claim 1 wherein the injected steam vapour creates an active steam chamber zone at the distal end of the well which propagates vertically, laterally and along the horizontal portion towards the proximal end of the horizontal well.
18. The method of claim 9 wherein said fluids are removed by a downhole pump attached to said vertical portion.
19. The method of claim 10 wherein said fluids are removed by steam lift.
20. A method for recovering heavy oil from reservoirs in thin formations, which formations are provided with a drilled, cased and cemented well having an insulated vertical portion and an insulated horizontal portion with insulation substantially to said distal end wherein there is a foraminous liner along the horizontal portion, said method comprising:
(a) removing the hydrocarbons from the region of the reservoir adjacent the horizontal portion of the well;
(b) creating a steam chamber in the reservoir at the distal end of the horizontal portion remote from the vertical portion by transporting steam through said insulated vertical portion and through said insulated horizontal portion to said distal end;
(c) propagating said steam chamber vertically from and horizontally along the horizontal portion from the distal end of the horizontal portion towards a proximal end of the horizontal portion;
(d) producing to the surface, oil, reservoir fluids and steam condensate which have drained from the reservoir through the foraminous liner.
US08/420,038 1995-04-11 1995-04-11 Single horizontal wellbore gravity drainage assisted steam flooding process Expired - Fee Related US5626193A (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US08/420,038 US5626193A (en) 1995-04-11 1995-04-11 Single horizontal wellbore gravity drainage assisted steam flooding process
CA002162741A CA2162741C (en) 1995-04-11 1995-11-14 Single horizontal wellbore gravity drainage assisted steam flood process and apparatus
PCT/CA1996/000222 WO1996032566A1 (en) 1995-04-11 1996-04-10 Single horizontal wellbore gravity drainage assisted steam flooding process and apparatus
AU52651/96A AU5265196A (en) 1995-04-11 1996-04-10 Single horizontal wellbore gravity drainage assisted steam f looding process and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US08/420,038 US5626193A (en) 1995-04-11 1995-04-11 Single horizontal wellbore gravity drainage assisted steam flooding process

Publications (1)

Publication Number Publication Date
US5626193A true US5626193A (en) 1997-05-06

Family

ID=23664823

Family Applications (1)

Application Number Title Priority Date Filing Date
US08/420,038 Expired - Fee Related US5626193A (en) 1995-04-11 1995-04-11 Single horizontal wellbore gravity drainage assisted steam flooding process

Country Status (4)

Country Link
US (1) US5626193A (en)
AU (1) AU5265196A (en)
CA (1) CA2162741C (en)
WO (1) WO1996032566A1 (en)

Cited By (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5826655A (en) * 1996-04-25 1998-10-27 Texaco Inc Method for enhanced recovery of viscous oil deposits
US5931230A (en) * 1996-02-20 1999-08-03 Mobil Oil Corporation Visicous oil recovery using steam in horizontal well
WO1999067503A1 (en) * 1998-06-23 1999-12-29 Alberta Energy Company Ltd. Convective heating startup for heavy oil recovery
US6073696A (en) * 1997-11-02 2000-06-13 Vastar Resources, Inc. Method and assembly for treating and producing a welbore using dual tubing strings
US20020170717A1 (en) * 1999-12-10 2002-11-21 Laurie Venning Method of achieving a preferential flow distribution in a horizontal well bore
US6662872B2 (en) 2000-11-10 2003-12-16 Exxonmobil Upstream Research Company Combined steam and vapor extraction process (SAVEX) for in situ bitumen and heavy oil production
US6708759B2 (en) 2001-04-04 2004-03-23 Exxonmobil Upstream Research Company Liquid addition to steam for enhancing recovery of cyclic steam stimulation or LASER-CSS
US6769486B2 (en) 2001-05-31 2004-08-03 Exxonmobil Upstream Research Company Cyclic solvent process for in-situ bitumen and heavy oil production
US20050211434A1 (en) * 2004-03-24 2005-09-29 Gates Ian D Process for in situ recovery of bitumen and heavy oil
US6988549B1 (en) 2003-11-14 2006-01-24 John A Babcock SAGD-plus
US20060175053A1 (en) * 2005-02-07 2006-08-10 Majus Process to improve extraction of crude oil and installation implementing such process
WO2007017353A1 (en) * 2005-08-09 2007-02-15 Shell Internationale Research Maatschappij B.V. System for cyclic injection and production from a well
US20080169095A1 (en) * 2007-01-16 2008-07-17 Arnoud Struyk Downhole steam injection splitter
US20080284426A1 (en) * 2007-05-18 2008-11-20 Baker Hughes Incorporated Water mapping using surface nmr
US20090200024A1 (en) * 2008-02-13 2009-08-13 Conrad Ayasse Modified process for hydrocarbon recovery using in situ combustion
WO2009100518A1 (en) * 2008-02-13 2009-08-20 Archon Technologies Ltd. A modified process for hydrocarbon recovery using in situ combustion
US20090229826A1 (en) * 2004-12-02 2009-09-17 East Jr Loyd E Hydrocarbon Sweep into Horizontal Transverse Fractured Wells
US20090250215A1 (en) * 2008-04-02 2009-10-08 Petroleo Brasileiro S.A. - Petrobras Method for induced production of petroleum by means of horizontal fractures
CN101089362B (en) * 2007-07-13 2010-04-07 中国石油天然气股份有限公司 Improved steam oil production method
US7770643B2 (en) 2006-10-10 2010-08-10 Halliburton Energy Services, Inc. Hydrocarbon recovery using fluids
US7809538B2 (en) 2006-01-13 2010-10-05 Halliburton Energy Services, Inc. Real time monitoring and control of thermal recovery operations for heavy oil reservoirs
US7832482B2 (en) 2006-10-10 2010-11-16 Halliburton Energy Services, Inc. Producing resources using steam injection
US20110048703A1 (en) * 2009-08-27 2011-03-03 Soheil Farshchian Heating apparatus
US20110094937A1 (en) * 2009-10-27 2011-04-28 Kellogg Brown & Root Llc Residuum Oil Supercritical Extraction Process
US20110229071A1 (en) * 2009-04-22 2011-09-22 Lxdata Inc. Pressure sensor arrangement using an optical fiber and methodologies for performing an analysis of a subterranean formation
US20110272152A1 (en) * 2010-05-05 2011-11-10 Robert Kaminsky Operating Wells In Groups In Solvent-Dominated Recovery Processes
RU2461700C1 (en) * 2011-11-17 2012-09-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Well operation method
RU2468193C1 (en) * 2011-06-08 2012-11-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Development method of high-viscosity oil deposit in multiple-formation layer-by-layer nonhomogeneous header
WO2013181750A1 (en) * 2012-06-08 2013-12-12 Nexen Energy Ulc Thermal pulsing procedure for remediation of cold spots in steam assisted gravity drainage
US20140000888A1 (en) * 2012-06-29 2014-01-02 Nexen Inc. Uplifted single well steam assisted gravity drainage system and process
US9163491B2 (en) 2011-10-21 2015-10-20 Nexen Energy Ulc Steam assisted gravity drainage processes with the addition of oxygen
US9328592B2 (en) 2011-07-13 2016-05-03 Nexen Energy Ulc Steam anti-coning/cresting technology ( SACT) remediation process
US20160312592A1 (en) * 2015-04-27 2016-10-27 Conocophillips Company Sw-sagd with between heel and toe injection
WO2016183001A1 (en) * 2015-05-08 2016-11-17 Louisiana State University Single-well gas-assisted gravity draining process for oil recovery
US9638000B2 (en) 2014-07-10 2017-05-02 Inflow Systems Inc. Method and apparatus for controlling the flow of fluids into wellbore tubulars
US9644463B2 (en) 2015-08-17 2017-05-09 Lloyd Murray Dallas Method of completing and producing long lateral wellbores
US9803456B2 (en) 2011-07-13 2017-10-31 Nexen Energy Ulc SAGDOX geometry for impaired bitumen reservoirs
US9828841B2 (en) 2011-07-13 2017-11-28 Nexen Energy Ulc Sagdox geometry
US20180073321A1 (en) * 2016-09-14 2018-03-15 Thru Tubing Solutions, Inc. Multi-zone well treatment
US9957787B2 (en) 2015-10-20 2018-05-01 Lloyd Murray Dallas Method of enhanced oil recovery from lateral wellbores
US20190063198A1 (en) * 2017-08-28 2019-02-28 Flow Resource Corporation Ltd. System, method, and apparatus for hydraulic fluid pressure sweep of a hydrocarbon formation within a single wellbore
WO2019066811A1 (en) * 2017-09-27 2019-04-04 Halliburton Energy Services, Inc. Passive wellbore monitoring with tracers
CN110118078A (en) * 2019-05-23 2019-08-13 西南石油大学 The single horizontal well gravity drainage quarrying apparatus and method occurred using underground steam
US10487636B2 (en) 2017-07-27 2019-11-26 Exxonmobil Upstream Research Company Enhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes
US10920545B2 (en) * 2016-06-09 2021-02-16 Conocophillips Company Flow control devices in SW-SAGD
US10995596B2 (en) 2015-12-01 2021-05-04 Conocophillips Company Single well cross steam and gravity drainage (SW-XSAGD)
US11002123B2 (en) 2017-08-31 2021-05-11 Exxonmobil Upstream Research Company Thermal recovery methods for recovering viscous hydrocarbons from a subterranean formation
US11142681B2 (en) 2017-06-29 2021-10-12 Exxonmobil Upstream Research Company Chasing solvent for enhanced recovery processes
US20210396106A1 (en) * 2020-06-18 2021-12-23 Cenovus Energy Inc. Non-condensable gas management during production of in-situ hydrocarbons
US11261725B2 (en) 2017-10-24 2022-03-01 Exxonmobil Upstream Research Company Systems and methods for estimating and controlling liquid level using periodic shut-ins
US11428086B2 (en) 2015-04-27 2022-08-30 Conocophillips Company SW-SAGD with between heel and toe injection

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6039121A (en) * 1997-02-20 2000-03-21 Rangewest Technologies Ltd. Enhanced lift method and apparatus for the production of hydrocarbons
US7938183B2 (en) 2008-02-28 2011-05-10 Baker Hughes Incorporated Method for enhancing heavy hydrocarbon recovery
FR3066777B1 (en) * 2017-05-29 2020-11-27 Majus Ltd REHEATING PLANT FOR THE PRODUCTION ZONE OF A WELL DEPOSIT FOR THE EXTRACTION OF HYDROCARBONS
CN113847003A (en) * 2020-06-28 2021-12-28 中国石油天然气股份有限公司 Method for uniformly using horizontal section of thickened oil horizontal well
CN112832702B (en) * 2021-02-04 2022-04-08 西南石油大学 Foam drainage gas production-sand washing integrated device and process thereof
CN112796745B (en) * 2021-02-18 2022-10-11 中海油田服务股份有限公司 Method and device for determining production dynamic data of steam flooding oil reservoir

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4067391A (en) * 1976-06-18 1978-01-10 Dewell Robert R In-situ extraction of asphaltic sands by counter-current hydrocarbon vapors
US4116275A (en) * 1977-03-14 1978-09-26 Exxon Production Research Company Recovery of hydrocarbons by in situ thermal extraction
US4217956A (en) * 1978-09-14 1980-08-19 Texaco Canada Inc. Method of in-situ recovery of viscous oils or bitumen utilizing a thermal recovery fluid and carbon dioxide
US4344485A (en) * 1979-07-10 1982-08-17 Exxon Production Research Company Method for continuously producing viscous hydrocarbons by gravity drainage while injecting heated fluids
US4460044A (en) * 1982-08-31 1984-07-17 Chevron Research Company Advancing heated annulus steam drive
US4465137A (en) * 1982-06-25 1984-08-14 Texaco Inc. Varying temperature oil recovery method
US4565245A (en) * 1983-05-09 1986-01-21 Texaco Inc. Completion for tar sand substrate
US4640359A (en) * 1985-11-12 1987-02-03 Texaco Canada Resources Ltd. Bitumen production through a horizontal well
US4700779A (en) * 1985-11-04 1987-10-20 Texaco Inc. Parallel horizontal wells
US4892146A (en) * 1988-12-19 1990-01-09 Texaco, Inc. Alkaline polymer hot water oil recovery process
US5141054A (en) * 1991-03-13 1992-08-25 Mobil Oil Corporation Limited entry steam heating method for uniform heat distribution
US5148869A (en) * 1991-01-31 1992-09-22 Mobil Oil Corporation Single horizontal wellbore process/apparatus for the in-situ extraction of viscous oil by gravity action using steam plus solvent vapor
US5167280A (en) * 1990-06-24 1992-12-01 Mobil Oil Corporation Single horizontal well process for solvent/solute stimulation
US5207271A (en) * 1991-10-30 1993-05-04 Mobil Oil Corporation Foam/steam injection into a horizontal wellbore for multiple fracture creation
US5215149A (en) * 1991-12-16 1993-06-01 Mobil Oil Corporation Single horizontal well conduction assisted steam drive process for removing viscous hydrocarbonaceous fluids
US5215146A (en) * 1991-08-29 1993-06-01 Mobil Oil Corporation Method for reducing startup time during a steam assisted gravity drainage process in parallel horizontal wells
US5289881A (en) * 1991-04-01 1994-03-01 Schuh Frank J Horizontal well completion
US5291956A (en) * 1992-04-15 1994-03-08 Union Oil Company Of California Coiled tubing drilling apparatus and method
US5297627A (en) * 1989-10-11 1994-03-29 Mobil Oil Corporation Method for reduced water coning in a horizontal well during heavy oil production

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4067391A (en) * 1976-06-18 1978-01-10 Dewell Robert R In-situ extraction of asphaltic sands by counter-current hydrocarbon vapors
US4116275A (en) * 1977-03-14 1978-09-26 Exxon Production Research Company Recovery of hydrocarbons by in situ thermal extraction
US4217956A (en) * 1978-09-14 1980-08-19 Texaco Canada Inc. Method of in-situ recovery of viscous oils or bitumen utilizing a thermal recovery fluid and carbon dioxide
US4344485A (en) * 1979-07-10 1982-08-17 Exxon Production Research Company Method for continuously producing viscous hydrocarbons by gravity drainage while injecting heated fluids
US4465137A (en) * 1982-06-25 1984-08-14 Texaco Inc. Varying temperature oil recovery method
US4460044A (en) * 1982-08-31 1984-07-17 Chevron Research Company Advancing heated annulus steam drive
US4565245A (en) * 1983-05-09 1986-01-21 Texaco Inc. Completion for tar sand substrate
US4700779A (en) * 1985-11-04 1987-10-20 Texaco Inc. Parallel horizontal wells
CA1260826A (en) * 1985-11-04 1989-09-26 Texaco Development Corporation Parallel horizontal wells
US4640359A (en) * 1985-11-12 1987-02-03 Texaco Canada Resources Ltd. Bitumen production through a horizontal well
US4892146A (en) * 1988-12-19 1990-01-09 Texaco, Inc. Alkaline polymer hot water oil recovery process
US5297627A (en) * 1989-10-11 1994-03-29 Mobil Oil Corporation Method for reduced water coning in a horizontal well during heavy oil production
US5167280A (en) * 1990-06-24 1992-12-01 Mobil Oil Corporation Single horizontal well process for solvent/solute stimulation
US5148869A (en) * 1991-01-31 1992-09-22 Mobil Oil Corporation Single horizontal wellbore process/apparatus for the in-situ extraction of viscous oil by gravity action using steam plus solvent vapor
US5141054A (en) * 1991-03-13 1992-08-25 Mobil Oil Corporation Limited entry steam heating method for uniform heat distribution
US5289881A (en) * 1991-04-01 1994-03-01 Schuh Frank J Horizontal well completion
US5215146A (en) * 1991-08-29 1993-06-01 Mobil Oil Corporation Method for reducing startup time during a steam assisted gravity drainage process in parallel horizontal wells
US5207271A (en) * 1991-10-30 1993-05-04 Mobil Oil Corporation Foam/steam injection into a horizontal wellbore for multiple fracture creation
US5215149A (en) * 1991-12-16 1993-06-01 Mobil Oil Corporation Single horizontal well conduction assisted steam drive process for removing viscous hydrocarbonaceous fluids
US5291956A (en) * 1992-04-15 1994-03-08 Union Oil Company Of California Coiled tubing drilling apparatus and method

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
Best et al., "Steam Circulation in Horizontal Wellbores", SPE/DOE Seventh Symposium on Enhanced Oil Recovery, Tulsa, OK, Apr. 22-25, 1990.
Best et al., Steam Circulation in Horizontal Wellbores , SPE/DOE Seventh Symposium on Enhanced Oil Recovery, Tulsa, OK, Apr. 22 25, 1990. *
D.E. Carpenter, "Horizontal Wells in a Steamdrive in the Midway Sunset Field", Proceedings from the 24th Annual Offshore Technology Conference, Houston, Texas, vol. 4, pp. 385-395 (May 1992).
D.E. Carpenter, Horizontal Wells in a Steamdrive in the Midway Sunset Field , Proceedings from the 24th Annual Offshore Technology Conference, Houston, Texas, vol. 4, pp. 385 395 (May 1992). *
Huygen et al., "Steaming Through Horizontal Wells and Fractures - Sealed Model Tests", European Symposium of Enhanced Oil Recovery, Paris, Nov. 1982.
Huygen et al., Steaming Through Horizontal Wells and Fractures Sealed Model Tests , European Symposium of Enhanced Oil Recovery, Paris, Nov. 1982. *

Cited By (77)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5931230A (en) * 1996-02-20 1999-08-03 Mobil Oil Corporation Visicous oil recovery using steam in horizontal well
US5826655A (en) * 1996-04-25 1998-10-27 Texaco Inc Method for enhanced recovery of viscous oil deposits
US6073696A (en) * 1997-11-02 2000-06-13 Vastar Resources, Inc. Method and assembly for treating and producing a welbore using dual tubing strings
WO1999067503A1 (en) * 1998-06-23 1999-12-29 Alberta Energy Company Ltd. Convective heating startup for heavy oil recovery
US20020170717A1 (en) * 1999-12-10 2002-11-21 Laurie Venning Method of achieving a preferential flow distribution in a horizontal well bore
US6533038B2 (en) * 1999-12-10 2003-03-18 Laurie Venning Method of achieving a preferential flow distribution in a horizontal well bore
US6662872B2 (en) 2000-11-10 2003-12-16 Exxonmobil Upstream Research Company Combined steam and vapor extraction process (SAVEX) for in situ bitumen and heavy oil production
US6708759B2 (en) 2001-04-04 2004-03-23 Exxonmobil Upstream Research Company Liquid addition to steam for enhancing recovery of cyclic steam stimulation or LASER-CSS
US6769486B2 (en) 2001-05-31 2004-08-03 Exxonmobil Upstream Research Company Cyclic solvent process for in-situ bitumen and heavy oil production
US6988549B1 (en) 2003-11-14 2006-01-24 John A Babcock SAGD-plus
US7464756B2 (en) 2004-03-24 2008-12-16 Exxon Mobil Upstream Research Company Process for in situ recovery of bitumen and heavy oil
US20050211434A1 (en) * 2004-03-24 2005-09-29 Gates Ian D Process for in situ recovery of bitumen and heavy oil
US20090229826A1 (en) * 2004-12-02 2009-09-17 East Jr Loyd E Hydrocarbon Sweep into Horizontal Transverse Fractured Wells
FR2881788A1 (en) * 2005-02-07 2006-08-11 Pcx Sa PROCESS FOR IMPROVING THE EXTRACTION OF RAW OIL AND INSTALLATION USING SAID METHOD
US20060175053A1 (en) * 2005-02-07 2006-08-10 Majus Process to improve extraction of crude oil and installation implementing such process
US7621333B2 (en) 2005-02-07 2009-11-24 Majus Process to improve extraction of crude oil and installation implementing such process
WO2007017353A1 (en) * 2005-08-09 2007-02-15 Shell Internationale Research Maatschappij B.V. System for cyclic injection and production from a well
US7861770B2 (en) 2005-08-09 2011-01-04 Shell Oil Company System for cyclic injection and production from a well
US20080302522A1 (en) * 2005-08-09 2008-12-11 Felix Antonio Ascanio Milano System For Cyclic Injection and Production From a Well
US7809538B2 (en) 2006-01-13 2010-10-05 Halliburton Energy Services, Inc. Real time monitoring and control of thermal recovery operations for heavy oil reservoirs
US7832482B2 (en) 2006-10-10 2010-11-16 Halliburton Energy Services, Inc. Producing resources using steam injection
US7770643B2 (en) 2006-10-10 2010-08-10 Halliburton Energy Services, Inc. Hydrocarbon recovery using fluids
US20080169095A1 (en) * 2007-01-16 2008-07-17 Arnoud Struyk Downhole steam injection splitter
US7631694B2 (en) 2007-01-16 2009-12-15 Arnoud Struyk Downhole steam injection splitter
US7579833B2 (en) * 2007-05-18 2009-08-25 Baker Hughes Incorporated Water mapping using surface NMR
US20080284426A1 (en) * 2007-05-18 2008-11-20 Baker Hughes Incorporated Water mapping using surface nmr
CN101089362B (en) * 2007-07-13 2010-04-07 中国石油天然气股份有限公司 Improved steam oil production method
RU2444619C1 (en) * 2008-02-13 2012-03-10 Арчон Текнолоджиз Лтд. Extraction method of liquefied or gassed hydrocarbon from underground hydrocarbon header (versions)
GB2469426A (en) * 2008-02-13 2010-10-13 Archon Technologies Ltd A modified process for hydrocarbon recovery using in situ combustion
US7841404B2 (en) 2008-02-13 2010-11-30 Archon Technologies Ltd. Modified process for hydrocarbon recovery using in situ combustion
WO2009100518A1 (en) * 2008-02-13 2009-08-20 Archon Technologies Ltd. A modified process for hydrocarbon recovery using in situ combustion
CN102137986B (en) * 2008-02-13 2014-05-07 亚康科技股份有限公司 A modified process for hydrocarbon recovery using in situ combustion
CN102137986A (en) * 2008-02-13 2011-07-27 亚康科技股份有限公司 A modified process for hydrocarbon recovery using in situ combustion
GB2469426B (en) * 2008-02-13 2012-01-11 Archon Technologies Ltd A modified process for hydrocarbon recovery using in situ combustion
US20090200024A1 (en) * 2008-02-13 2009-08-13 Conrad Ayasse Modified process for hydrocarbon recovery using in situ combustion
US20090250215A1 (en) * 2008-04-02 2009-10-08 Petroleo Brasileiro S.A. - Petrobras Method for induced production of petroleum by means of horizontal fractures
US9347312B2 (en) 2009-04-22 2016-05-24 Weatherford Canada Partnership Pressure sensor arrangement using an optical fiber and methodologies for performing an analysis of a subterranean formation
US20110229071A1 (en) * 2009-04-22 2011-09-22 Lxdata Inc. Pressure sensor arrangement using an optical fiber and methodologies for performing an analysis of a subterranean formation
US10246989B2 (en) 2009-04-22 2019-04-02 Weatherford Technology Holdings, Llc Pressure sensor arrangement using an optical fiber and methodologies for performing an analysis of a subterranean formation
US10837274B2 (en) 2009-04-22 2020-11-17 Weatherford Canada Ltd. Pressure sensor arrangement using an optical fiber and methodologies for performing an analysis of a subterranean formation
US20110048703A1 (en) * 2009-08-27 2011-03-03 Soheil Farshchian Heating apparatus
US9732600B2 (en) * 2009-08-27 2017-08-15 Exponential Technologies, Inc. Heating apparatus
US20110094937A1 (en) * 2009-10-27 2011-04-28 Kellogg Brown & Root Llc Residuum Oil Supercritical Extraction Process
US20110272152A1 (en) * 2010-05-05 2011-11-10 Robert Kaminsky Operating Wells In Groups In Solvent-Dominated Recovery Processes
RU2468193C1 (en) * 2011-06-08 2012-11-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Development method of high-viscosity oil deposit in multiple-formation layer-by-layer nonhomogeneous header
US9328592B2 (en) 2011-07-13 2016-05-03 Nexen Energy Ulc Steam anti-coning/cresting technology ( SACT) remediation process
US9803456B2 (en) 2011-07-13 2017-10-31 Nexen Energy Ulc SAGDOX geometry for impaired bitumen reservoirs
US9828841B2 (en) 2011-07-13 2017-11-28 Nexen Energy Ulc Sagdox geometry
US9163491B2 (en) 2011-10-21 2015-10-20 Nexen Energy Ulc Steam assisted gravity drainage processes with the addition of oxygen
US9644468B2 (en) 2011-10-21 2017-05-09 Nexen Energy Ulc Steam assisted gravity drainage processes with the addition of oxygen
RU2461700C1 (en) * 2011-11-17 2012-09-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Well operation method
WO2013181750A1 (en) * 2012-06-08 2013-12-12 Nexen Energy Ulc Thermal pulsing procedure for remediation of cold spots in steam assisted gravity drainage
US20140000888A1 (en) * 2012-06-29 2014-01-02 Nexen Inc. Uplifted single well steam assisted gravity drainage system and process
US9638000B2 (en) 2014-07-10 2017-05-02 Inflow Systems Inc. Method and apparatus for controlling the flow of fluids into wellbore tubulars
US20160312592A1 (en) * 2015-04-27 2016-10-27 Conocophillips Company Sw-sagd with between heel and toe injection
US11428086B2 (en) 2015-04-27 2022-08-30 Conocophillips Company SW-SAGD with between heel and toe injection
US11002121B2 (en) 2015-05-08 2021-05-11 Board Of Supervisors Of Louis An A Sta Te University And Agricultural And Mechanical College Single-well gas-assisted gravity draining process for oil recovery
CN107624141A (en) * 2015-05-08 2018-01-23 路易斯安娜州立大学监测委员会,农业和机械学院 Individual well gas Assisted Gravity Drainage technique for oil recovery
WO2016183001A1 (en) * 2015-05-08 2016-11-17 Louisiana State University Single-well gas-assisted gravity draining process for oil recovery
US10704370B2 (en) 2015-05-08 2020-07-07 Board Of Supervisors Of Louisiana State University And Agricultural And Mechanical College Single-well gas-assisted gravity drainage process for oil recovery
US10077643B2 (en) 2015-08-17 2018-09-18 Lloyd Murray Dallas Method of completing and producing long lateral wellbores
US9644463B2 (en) 2015-08-17 2017-05-09 Lloyd Murray Dallas Method of completing and producing long lateral wellbores
US9957787B2 (en) 2015-10-20 2018-05-01 Lloyd Murray Dallas Method of enhanced oil recovery from lateral wellbores
US10995596B2 (en) 2015-12-01 2021-05-04 Conocophillips Company Single well cross steam and gravity drainage (SW-XSAGD)
US10920545B2 (en) * 2016-06-09 2021-02-16 Conocophillips Company Flow control devices in SW-SAGD
US11162321B2 (en) * 2016-09-14 2021-11-02 Thru Tubing Solutions, Inc. Multi-zone well treatment
US20180073321A1 (en) * 2016-09-14 2018-03-15 Thru Tubing Solutions, Inc. Multi-zone well treatment
US11142681B2 (en) 2017-06-29 2021-10-12 Exxonmobil Upstream Research Company Chasing solvent for enhanced recovery processes
US10487636B2 (en) 2017-07-27 2019-11-26 Exxonmobil Upstream Research Company Enhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes
US20190063198A1 (en) * 2017-08-28 2019-02-28 Flow Resource Corporation Ltd. System, method, and apparatus for hydraulic fluid pressure sweep of a hydrocarbon formation within a single wellbore
US11002123B2 (en) 2017-08-31 2021-05-11 Exxonmobil Upstream Research Company Thermal recovery methods for recovering viscous hydrocarbons from a subterranean formation
US10760411B2 (en) 2017-09-27 2020-09-01 Halliburton Energy Services, Inc. Passive wellbore monitoring with tracers
WO2019066811A1 (en) * 2017-09-27 2019-04-04 Halliburton Energy Services, Inc. Passive wellbore monitoring with tracers
US11261725B2 (en) 2017-10-24 2022-03-01 Exxonmobil Upstream Research Company Systems and methods for estimating and controlling liquid level using periodic shut-ins
CN110118078A (en) * 2019-05-23 2019-08-13 西南石油大学 The single horizontal well gravity drainage quarrying apparatus and method occurred using underground steam
US20210396106A1 (en) * 2020-06-18 2021-12-23 Cenovus Energy Inc. Non-condensable gas management during production of in-situ hydrocarbons
US11713656B2 (en) * 2020-06-18 2023-08-01 Cenovus Energy Inc. Non-condensable gas management during production of in-situ hydrocarbons

Also Published As

Publication number Publication date
CA2162741A1 (en) 1996-10-12
WO1996032566A1 (en) 1996-10-17
CA2162741C (en) 2005-12-20
AU5265196A (en) 1996-10-30

Similar Documents

Publication Publication Date Title
US5626193A (en) Single horizontal wellbore gravity drainage assisted steam flooding process
US4116275A (en) Recovery of hydrocarbons by in situ thermal extraction
US5148869A (en) Single horizontal wellbore process/apparatus for the in-situ extraction of viscous oil by gravity action using steam plus solvent vapor
US5215146A (en) Method for reducing startup time during a steam assisted gravity drainage process in parallel horizontal wells
US5289881A (en) Horizontal well completion
US4085803A (en) Method for oil recovery using a horizontal well with indirect heating
CA1271703A (en) Bitumen production through a horizontal well
US10392912B2 (en) Pressure assisted oil recovery
US5215149A (en) Single horizontal well conduction assisted steam drive process for removing viscous hydrocarbonaceous fluids
US4390067A (en) Method of treating reservoirs containing very viscous crude oil or bitumen
US7422063B2 (en) Hydrocarbon recovery from subterranean formations
US4993490A (en) Overburn process for recovery of heavy bitumens
US4344485A (en) Method for continuously producing viscous hydrocarbons by gravity drainage while injecting heated fluids
US4856587A (en) Recovery of oil from oil-bearing formation by continually flowing pressurized heated gas through channel alongside matrix
US6039121A (en) Enhanced lift method and apparatus for the production of hydrocarbons
US5131471A (en) Single well injection and production system
US5931230A (en) Visicous oil recovery using steam in horizontal well
US3986557A (en) Production of bitumen from tar sands
US5607018A (en) Viscid oil well completion
US5141054A (en) Limited entry steam heating method for uniform heat distribution
US20060175061A1 (en) Method for Recovering Hydrocarbons from Subterranean Formations
CA1304287C (en) Steaming process, involving a pair of horizontal wells, for use in heavy oil reservoir
WO2014189555A1 (en) Fishbone sagd
CA2567399C (en) Method and apparatus for stimulating heavy oil production
US7090014B2 (en) Process for sequentially applying SAGD to adjacent sections of a petroleum reservoir

Legal Events

Date Code Title Description
AS Assignment

Owner name: ELAN ENERGY INC., CANADA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:NZEKWU, BEN IFEANYI;SAMETZ, PETER DAVID;PELENSKY, PETER JOSEPH;REEL/FRAME:007547/0007

Effective date: 19950525

FEPP Fee payment procedure

Free format text: PAT HOLDER CLAIMS SMALL ENTITY STATUS - SMALL BUSINESS (ORIGINAL EVENT CODE: SM02); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

FPAY Fee payment

Year of fee payment: 4

AS Assignment

Owner name: CANADIAN NATIONAL RESOURCES LIMITED, CANADA

Free format text: MERGER;ASSIGNOR:RANGER OIL LIMITED;REEL/FRAME:011356/0556

Effective date: 20001001

AS Assignment

Owner name: RANGER OIL LIMITED, CANADA

Free format text: MERGER;ASSIGNOR:ELAN ENERGY, INC.;REEL/FRAME:012025/0463

Effective date: 19880101

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20050506