WO2015192659A1 - Intelligent transformer substation warning message reporting method - Google Patents

Intelligent transformer substation warning message reporting method Download PDF

Info

Publication number
WO2015192659A1
WO2015192659A1 PCT/CN2015/071598 CN2015071598W WO2015192659A1 WO 2015192659 A1 WO2015192659 A1 WO 2015192659A1 CN 2015071598 W CN2015071598 W CN 2015071598W WO 2015192659 A1 WO2015192659 A1 WO 2015192659A1
Authority
WO
WIPO (PCT)
Prior art keywords
alarm
interval
direct
data quality
warning
Prior art date
Application number
PCT/CN2015/071598
Other languages
French (fr)
Chinese (zh)
Inventor
崔雪松
芮国俊
李忠明
李瑞洲
严晗
汪成
王涛
赵娜
李纪云
纪陵
朱杰媛
Original Assignee
国家电网公司
南京国电南自软件工程有限公司
江苏省电力公司淮安供电公司
江苏省电力公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 国家电网公司, 南京国电南自软件工程有限公司, 江苏省电力公司淮安供电公司, 江苏省电力公司 filed Critical 国家电网公司
Publication of WO2015192659A1 publication Critical patent/WO2015192659A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Abstract

An intelligent transformer substation warning message reporting method, comprising: adding a data quality bit attribute to an interval object in a substation monitoring system, and marking whether the interval object is in a maintenance state by changing the value of the data quality bit; when a warning signal is generated in an interval, a direct-transfer warning module, before composing a direct-transfer warning text message, finds the interval object generating a warning signal, and determines according to the value of the data quality bit whether the interval object is in a maintenance state; if it is not, then the direct-transfer warning module composes the direct-transfer warning text message and forwards same to a main scheduling station; if it is, then the direct-transfer warning module does not compose the direct-transfer warning text message. A substation end preprocesses the direct-transfer warning text message before reporting same to a scheduling center. By means of such techniques as configuring in a backend monitoring platform a warning message direct transmission maintenance shield, erroneous warning messages generated by an interval in maintenance state are prevented from being reported to the scheduling center, thus reducing interference to duty staff and greatly increasing work efficiency.

Description

一种智能变电站告警信息上送方法Intelligent substation alarm information sending method 技术领域Technical field
本发明涉及变电站领域,具体涉及一种智能变电站告警信息上送方法。The invention relates to the field of substations, in particular to a method for sending alarm information of intelligent substation.
背景技术Background technique
变电站设备告警信息是设备监控工作的主要关注对象,以变电站SCADA系统的单一事件或综合分析结果为信息源,经过规范化处理,生成标准的告警条文;告警信息筛选以监控业务需求为依据,以相关告警分类为标准,应注重信息的完整性与传输的可靠性;告警条文的标准化处理由变电站监控系统完成,经由图形网关机(或远动工作站)直接以文本格式传送到调度主站及设备运维站,分类显示在相应的告警窗并存入告警记录文件,告警直传采用DL476或DL/T634.5104规约,应有效利用规约“信息确认”及“出错重传”机制,防止信息丢失,保证信息的完整性和可靠性。Substation equipment alarm information is the main concern of equipment monitoring. The single event or comprehensive analysis result of the substation SCADA system is used as the information source. After standardization, standard warning clauses are generated. The alarm information screening is based on monitoring business requirements. Alarms are classified as standards, and attention should be paid to the integrity of information and the reliability of transmission. The standardization of alarm provisions is completed by the substation monitoring system and transmitted directly to the dispatching master station and equipment in text format via a graphical gateway machine (or telecontrol station). The station is displayed in the corresponding alarm window and stored in the alarm record file. The direct transmission of the alarm uses the DL476 or DL/T634.5104 protocol. The protocol "information confirmation" and "error retransmission" mechanism should be effectively utilized to prevent information loss. Ensure the integrity and reliability of the information.
智能变电站的告警信息量远大于常规变电站,其中包含有很多的由变电站正在进行检修的间隔产生的伪告警信息,对调度中心值班人员及时、准确发现重要告警产生很强的干扰,影响工作效率。The amount of alarm information of the intelligent substation is much larger than that of the conventional substation, which contains many false alarm information generated by the interval of the substation being repaired, which has a strong interference to the dispatching center on time and accurately and important alarms, which affects the work efficiency.
发明内容Summary of the invention
本发明公开了一种智能变电站告警信息上送方法,可以避免正在进行检修的间隔产生伪告警信息影响调度中心值班人员工作效率的问题。The invention discloses a method for sending an intelligent substation alarm information, which can avoid the problem that the pseudo alarm information generated during the interval of the maintenance is affected affects the working efficiency of the dispatching staff on the dispatching center.
本发明通过以下技术方案实现:The invention is achieved by the following technical solutions:
一种智能变电站告警信息上送方法,在变电站监控系统中为间隔对象增加数据质量位属性,通过改变数据质量位的值来标记间隔对象是否处于检修状态;告警直传模块在间隔有告警信号产生而组织告警直传文本信息前,先查找到产生告警信号的间隔对象,根据其数据质量位的值来判断该间隔对象是否处于检修状态,若判断结果为否,则组织告警直传的文本信息,并转发给调度主站;若判断结果为是,则不组织告警直传的文本信息。A smart substation alarm information sending method, in the substation monitoring system, adding a data quality bit attribute for the interval object, marking the interval object to be in an overhaul state by changing the value of the data quality bit; the alarm direct transmission module generates an alarm signal at intervals Before organizing the alarm to directly transmit the text information, first find the interval object that generates the alarm signal, and judge whether the interval object is in the repair state according to the value of the data quality bit. If the judgment result is no, the text information of the alarm direct transmission is organized. And forwarded to the scheduling master station; if the judgment result is yes, the text information of the direct transmission of the alarm is not organized.
在变电站监控系统中还为间隔对象增加检修标志牌属性以及检修标志牌图元,所述检修标志牌属性、检修标志牌图元与数据质量位属性相互关联,当间 隔对象处于检修状态时,通过修改检修标志牌属性的值使数据质量位标记为检修状态,同时使检修标志牌图元在间隔监控画面上对应的间隔对象一侧显现。In the substation monitoring system, the maintenance sign attribute and the maintenance sign board element are also added for the interval object, and the maintenance sign attribute, the maintenance sign board element and the data quality bit attribute are related to each other. When the object is in the inspection state, the data quality bit is marked as the inspection state by modifying the value of the inspection sign attribute, and the inspection sign element is displayed on the corresponding interval object side on the interval monitoring screen.
本发明与现有技术相比的优点在于:The advantages of the present invention over the prior art are:
变电站端在将告警直传信息上送调度中心告警信息前进行预处理,通过监控后台置检修屏蔽告警直传信息等技术,避免由正在进行检修的间隔所产生的伪告警信息上送调度中心,降低对值班人员的干扰,切实提高工作效率。The substation side pre-processes the alarm direct transmission information before sending it to the dispatching center alarm information, and monitors the background to repair and repair the alarm direct transmission information, so as to avoid sending the false alarm information generated by the interval of the maintenance to the dispatching center. Reduce the interference to the duty personnel and effectively improve work efficiency.
附图说明DRAWINGS
图1为间隔对象挂检修牌示意图。Figure 1 is a schematic diagram of the inspection and repair of the spacer object.
图2为告警直传信息预处理工作流程图。Figure 2 is a flow chart of the pre-processing of alarm direct transmission information.
具体实施方式detailed description
如图1所示的一种智能变电站告警信息上送方法,在变电站监控系统中为间隔对象增加数据质量位属性、检修标志牌属性以及检修标志牌图元,所述检修标志牌属性、检修标志牌图元与数据质量位属性相互关联,当间隔对象处于检修状态时,通过修改检修标志牌属性的值使数据质量位标记为检修状态,同时使检修标志牌图元在间隔监控画面上对应的间隔对象一侧显现;告警直传模块在间隔有告警信号产生而组织告警直传文本信息前,先查找到产生告警信号的间隔对象,根据其数据质量位的值来判断该间隔对象是否处于检修状态,若判断结果为否,则组织告警直传的文本信息,并转发给调度主站;若判断结果为是,则不组织告警直传的文本信息。As shown in FIG. 1 , a smart substation alarm information sending method adds a data quality bit attribute, a maintenance sign attribute, and a maintenance sign board element to the interval object in the substation monitoring system, and the maintenance sign attribute and the maintenance sign are The card primitive and the data quality bit attribute are related to each other. When the interval object is in the repair state, the data quality bit is marked as the repair state by modifying the value of the maintenance sign attribute, and the repair flag element is corresponding to the interval monitoring screen. The one side of the interval object appears; the alarm direct transmission module finds the interval object that generates the alarm signal before the alarm signal is generated and the organization sends the alarm direct transmission text information, and judges whether the interval object is in the service according to the value of the data quality bit. If the judgment result is no, the text information of the direct transmission of the alarm is organized and forwarded to the scheduling main station; if the judgment result is yes, the text information of the direct transmission of the alarm is not organized.
如图2所示,为了实现告警直传功能,需要在调度端部署告警直传信息的采集功能模块,在厂站端部署告警直传服务和告警信息转发功能模块,并在告警直传服务前增加前置规约采集数据的智能预处理服务,在组织告警直传信息前先对前置采集的信号进行智能预处理,过滤掉一些伪告警,有效减少伪告警上送调度的条目数;告警图形网关采用DL476协议的字符串数据块分别与厂站监控系统和调度端进行告警信息传输;厂站监控系统先将变电站SCADA系统智能处理过的告警信息转换为带站名和设备名的标准告警信息,传输给调度端,调度端告警采集程序与厂站监控系统建立TCP连接,接收告警信息,并以消息的方式发送给告警系统。 As shown in Figure 2, in order to implement the alarm direct transmission function, you need to deploy the alarm direct transmission information collection function module on the dispatcher, and deploy the alarm direct transmission service and alarm information forwarding function module on the plant side, and before the alarm direct transmission service. An intelligent pre-processing service that adds data to the pre-distribution data, intelligently pre-processes the pre-acquired signals before filtering the direct transmission information, and filters out some pseudo-alarms, effectively reducing the number of entries sent by the pseudo-alarms; The gateway uses the string data block of the DL476 protocol to transmit alarm information to the plant monitoring system and the dispatching end respectively; the plant monitoring system first converts the intelligently processed alarm information of the substation SCADA system into standard alarm information with the station name and the device name. The transmission is transmitted to the dispatching end, and the dispatching alarm collection program establishes a TCP connection with the plant monitoring system, receives the alarm information, and sends the alarm information to the alarm system.

Claims (2)

  1. 一种智能变电站告警信息上送方法,其特征在于:在变电站监控系统中为间隔对象增加数据质量位属性,通过改变数据质量位的值来标记间隔对象是否处于检修状态;告警直传模块在间隔有告警信号产生而组织告警直传文本信息前,先查找到产生告警信号的间隔对象,根据其数据质量位的值来判断该间隔对象是否处于检修状态,若判断结果为否,则组织告警直传的文本信息,并转发给调度主站;若判断结果为是,则不组织告警直传的文本信息。A smart substation alarm information sending method is characterized in that: in a substation monitoring system, a data quality bit attribute is added for an interval object, and a value of a data quality bit is changed to mark whether the interval object is in an inspection state; the alarm direct transmission module is in the interval Before the alarm signal is generated and the alarm is sent directly to the text message, the interval object that generates the alarm signal is first found, and the interval object is judged according to the value of the data quality bit. If the judgment result is no, the organization alarm is straight. The text information transmitted is forwarded to the dispatching master station; if the judgment result is yes, the text information directly transmitted by the alarm is not organized.
  2. 如权利要求1所述的一种智能变电站告警信息上送方法,其特征在于:在变电站监控系统中还为间隔对象增加检修标志牌属性以及检修标志牌图元,所述检修标志牌属性、检修标志牌图元与数据质量位属性相互关联,当间隔对象处于检修状态时,通过修改检修标志牌属性的值使数据质量位标记为检修状态,同时使检修标志牌图元在间隔监控画面上对应的间隔对象一侧显现。 The intelligent substation alarm information uploading method according to claim 1, wherein in the substation monitoring system, the maintenance sign attribute and the maintenance sign board element are added to the interval object, and the maintenance sign attribute and maintenance are performed. The signboard primitive and the data quality bit attribute are related to each other. When the interval object is in the repair state, the data quality bit is marked as the repair state by modifying the value of the repair sign attribute, and the repair sign element is corresponding to the interval monitoring screen. The spacer object appears on one side.
PCT/CN2015/071598 2014-06-19 2015-01-27 Intelligent transformer substation warning message reporting method WO2015192659A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410275158.X 2014-06-19
CN201410275158.XA CN104065163B (en) 2014-06-19 2014-06-19 Delivery method on a kind of intelligent substation warning information

Publications (1)

Publication Number Publication Date
WO2015192659A1 true WO2015192659A1 (en) 2015-12-23

Family

ID=51552748

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2015/071598 WO2015192659A1 (en) 2014-06-19 2015-01-27 Intelligent transformer substation warning message reporting method

Country Status (2)

Country Link
CN (1) CN104065163B (en)
WO (1) WO2015192659A1 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108574342A (en) * 2018-05-23 2018-09-25 国网江苏省电力有限公司常州供电分公司 The monitoring system of 230M power load control communication base stations
CN109933497A (en) * 2019-03-12 2019-06-25 国网江西省电力有限公司赣州供电分公司 A kind of data center's operation supervisory systems
CN110323835A (en) * 2019-07-24 2019-10-11 广东电网有限责任公司 10kV segmentation backup auto-activating device throwing moves back system and throws annealing method
CN110571930A (en) * 2019-09-09 2019-12-13 广东电网有限责任公司 remote management system and remote management method of substation telecontrol device
CN111565167A (en) * 2020-03-09 2020-08-21 国网浙江省电力有限公司绍兴供电公司 Generalized remote operation information safety device and safety operation and maintenance method for intelligent substation
CN111626046A (en) * 2020-04-13 2020-09-04 国网山东省电力公司 Correlation verification method for positions of telemetering text primitives and equipment primitives of transformer substation
CN112348325A (en) * 2020-10-23 2021-02-09 许继集团有限公司 Regulation and control master station system risk early warning method based on data streaming processing
CN112398227A (en) * 2020-11-16 2021-02-23 国网辽宁省电力有限公司辽阳供电公司 Automatic alarm method for transformer load rate based on D5000 power grid dispatching system
CN112436611A (en) * 2020-12-03 2021-03-02 广东电网有限责任公司电力科学研究院 Method, device and system for monitoring jump data of transformer substation
CN112598023A (en) * 2020-12-02 2021-04-02 国网青海省电力公司海东供电公司 Intelligent identification and automatic mapping method and device for power grid monitoring alarm information
CN112668516A (en) * 2020-12-31 2021-04-16 南京太司德智能电气有限公司 Automatic point-aligning acceptance check method for alarm window of power dispatching system
CN114142619A (en) * 2021-12-28 2022-03-04 广东电网有限责任公司 Overhauling determination method and device for telecontrol device

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104065163B (en) * 2014-06-19 2016-08-17 国家电网公司 Delivery method on a kind of intelligent substation warning information
CN104901421B (en) * 2015-05-14 2017-01-25 国家电网公司 Method and system for monitoring operating conditions of automation substation
CN110460159A (en) * 2019-08-30 2019-11-15 国网辽宁省电力有限公司营口供电公司 A kind of substation intelligent alarm system
CN113093676A (en) * 2021-04-02 2021-07-09 东方电子股份有限公司 Method for processing maintenance equipment alarm signal
CN113300337A (en) * 2021-05-24 2021-08-24 深圳供电局有限公司 Feeder protection warning system on same generating line in transformer substation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5859596A (en) * 1996-08-30 1999-01-12 Csi Technology, Inc. Switchyard equipment monitoring system and communications network therefor
KR100866994B1 (en) * 2008-05-14 2008-11-05 주식회사유성계전 System for monitoring operation condition of substation
CN101833442A (en) * 2009-03-13 2010-09-15 华东电网有限公司 Information visualization fusion method of GOOSE (General Object Oriented Substation Event) and MMS (Manufacturing Message Specification) event scale
CN101989938A (en) * 2009-08-04 2011-03-23 上海市电力公司 Filtration system and method of mis-telecommand scheduling end of transformer substation
CN103514516A (en) * 2013-09-27 2014-01-15 国家电网公司 Method for obtaining power grid device failure information based on calculation of multi-source redundant information
CN103729806A (en) * 2014-01-16 2014-04-16 国家电网公司 Transformer substation alarming graph gateway minimizing system and achieving method thereof
CN104065163A (en) * 2014-06-19 2014-09-24 国家电网公司 Intelligent substation warning message delivering method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102109491B (en) * 2009-12-24 2013-03-27 同方威视技术股份有限公司 Substance identification method of ion mobility spectrum (IMS) detection instrument based on ion diagram sequence
KR101186754B1 (en) * 2010-08-17 2012-09-28 한국전력공사 Event generator test apparatus of RTU in SCADA system
CN102437654B (en) * 2011-12-31 2014-01-15 国电南京自动化股份有限公司 Station control realizing method based on monitoring system
CN103280887B (en) * 2013-05-17 2016-06-08 贵阳锐泰电力科技有限公司 A kind of transformer station and control centre's intelligent alarm and fault diagnosis system
CN103605814B (en) * 2013-12-10 2017-02-15 国家电网公司 Information processing method and information processing system in substation transformation process

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5859596A (en) * 1996-08-30 1999-01-12 Csi Technology, Inc. Switchyard equipment monitoring system and communications network therefor
KR100866994B1 (en) * 2008-05-14 2008-11-05 주식회사유성계전 System for monitoring operation condition of substation
CN101833442A (en) * 2009-03-13 2010-09-15 华东电网有限公司 Information visualization fusion method of GOOSE (General Object Oriented Substation Event) and MMS (Manufacturing Message Specification) event scale
CN101989938A (en) * 2009-08-04 2011-03-23 上海市电力公司 Filtration system and method of mis-telecommand scheduling end of transformer substation
CN103514516A (en) * 2013-09-27 2014-01-15 国家电网公司 Method for obtaining power grid device failure information based on calculation of multi-source redundant information
CN103729806A (en) * 2014-01-16 2014-04-16 国家电网公司 Transformer substation alarming graph gateway minimizing system and achieving method thereof
CN104065163A (en) * 2014-06-19 2014-09-24 国家电网公司 Intelligent substation warning message delivering method

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108574342A (en) * 2018-05-23 2018-09-25 国网江苏省电力有限公司常州供电分公司 The monitoring system of 230M power load control communication base stations
CN108574342B (en) * 2018-05-23 2023-10-27 国网江苏省电力有限公司常州供电分公司 Monitoring system of 230M power load control communication base station
CN109933497A (en) * 2019-03-12 2019-06-25 国网江西省电力有限公司赣州供电分公司 A kind of data center's operation supervisory systems
CN110323835A (en) * 2019-07-24 2019-10-11 广东电网有限责任公司 10kV segmentation backup auto-activating device throwing moves back system and throws annealing method
CN110571930A (en) * 2019-09-09 2019-12-13 广东电网有限责任公司 remote management system and remote management method of substation telecontrol device
CN110571930B (en) * 2019-09-09 2023-04-07 广东电网有限责任公司 Remote management system and remote management method of substation telecontrol device
CN111565167B (en) * 2020-03-09 2022-05-17 国网浙江省电力有限公司绍兴供电公司 Generalized remote operation information safety device and safety operation and maintenance method for intelligent substation
CN111565167A (en) * 2020-03-09 2020-08-21 国网浙江省电力有限公司绍兴供电公司 Generalized remote operation information safety device and safety operation and maintenance method for intelligent substation
CN111626046B (en) * 2020-04-13 2022-06-17 国网山东省电力公司临沂供电公司 Correlation verification method for positions of telemetering text primitives and equipment primitives of transformer substation
CN111626046A (en) * 2020-04-13 2020-09-04 国网山东省电力公司 Correlation verification method for positions of telemetering text primitives and equipment primitives of transformer substation
CN112348325A (en) * 2020-10-23 2021-02-09 许继集团有限公司 Regulation and control master station system risk early warning method based on data streaming processing
CN112398227A (en) * 2020-11-16 2021-02-23 国网辽宁省电力有限公司辽阳供电公司 Automatic alarm method for transformer load rate based on D5000 power grid dispatching system
CN112598023A (en) * 2020-12-02 2021-04-02 国网青海省电力公司海东供电公司 Intelligent identification and automatic mapping method and device for power grid monitoring alarm information
CN112598023B (en) * 2020-12-02 2024-01-26 国网青海省电力公司海东供电公司 Intelligent identification and automatic mapping method and device for power grid monitoring alarm information
CN112436611A (en) * 2020-12-03 2021-03-02 广东电网有限责任公司电力科学研究院 Method, device and system for monitoring jump data of transformer substation
CN112436611B (en) * 2020-12-03 2023-04-04 广东电网有限责任公司电力科学研究院 Method, device and system for monitoring jump data of transformer substation
CN112668516A (en) * 2020-12-31 2021-04-16 南京太司德智能电气有限公司 Automatic point-aligning acceptance check method for alarm window of power dispatching system
CN114142619A (en) * 2021-12-28 2022-03-04 广东电网有限责任公司 Overhauling determination method and device for telecontrol device
CN114142619B (en) * 2021-12-28 2024-04-19 广东电网有限责任公司 Overhauling determining method and device for telemechanical device

Also Published As

Publication number Publication date
CN104065163A (en) 2014-09-24
CN104065163B (en) 2016-08-17

Similar Documents

Publication Publication Date Title
WO2015192659A1 (en) Intelligent transformer substation warning message reporting method
CN105529831B (en) A kind of secondary equipment of intelligent converting station failure Computer Aided Analysis System
CN105564465B (en) A kind of railway electric signal plant maintenance operation control system and method
CN101315651A (en) Real-time examination and repair method and system for train fault
CN104494653B (en) A kind of track traffic synthetic monitoring system
CN107959589A (en) A kind of power emergency repair dispatches system and method
CN105429803B (en) Quadratic Imaginary loop fault localization method based on fault zone Difference formula reasoning
CN103366245B (en) Electric network fault information issuing method based on OSB bus and system
CN103544561A (en) Method for realizing dynamic display of power transmission circuits, method for realizing operational maintenance of power transmission circuits and system for realizing management of power transmission circuits
CN106443345A (en) Fault positioning system and method for overhead power distribution line
CN106504115A (en) Water power production real-time information processing system and method based on mass data
CN104426697A (en) Network fault management system
CN105976084A (en) Transmission line risk management system based on GIS and mobile terminal
CN107991965A (en) Standardization electricity business failure emergency command management method based on intellectual monitoring
CN103632407A (en) Handheld equipment terminal inspection system for transformer substation
CN202978437U (en) Intelligent routing inspection system for transformer substations
CN202510279U (en) Remote monitoring system for wind farm
CN104618151A (en) GIS technology-based ONU equipment fault location method for EPON network
CN106896799B (en) A kind of locomotive inspection and repair management method
CN210295428U (en) Remote monitoring system for screen faults of bus electronic stop board
CN202143082U (en) Automatic alarm device of information operation and maintenance comprehensive monitoring system
CN107528725A (en) A kind of boss station warning information transmission realizing method based on service subscription mode
CN201674602U (en) Video identification system in high-voltage power transmission line online monitoring system
CN107505535B (en) Transformer substation secondary system data information analysis system and analysis method
CN205319796U (en) Power system fault detection system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15809151

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15809151

Country of ref document: EP

Kind code of ref document: A1