WO2013130264A1 - Improved efficiency heating, ventilating, and air-conditioning through extended run-time control - Google Patents

Improved efficiency heating, ventilating, and air-conditioning through extended run-time control Download PDF

Info

Publication number
WO2013130264A1
WO2013130264A1 PCT/US2013/025823 US2013025823W WO2013130264A1 WO 2013130264 A1 WO2013130264 A1 WO 2013130264A1 US 2013025823 W US2013025823 W US 2013025823W WO 2013130264 A1 WO2013130264 A1 WO 2013130264A1
Authority
WO
WIPO (PCT)
Prior art keywords
compressor
time
run
call
cool
Prior art date
Application number
PCT/US2013/025823
Other languages
French (fr)
Inventor
Joseph E. CHILDS
Roger W. Rognli
Robert J. Cox
Brock Simonson
Original Assignee
Cooper Technologies Company
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cooper Technologies Company filed Critical Cooper Technologies Company
Priority to CA2864849A priority Critical patent/CA2864849C/en
Publication of WO2013130264A1 publication Critical patent/WO2013130264A1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/01Timing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/024Compressor control by controlling the electric parameters, e.g. current or voltage
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/025Compressor control by controlling speed
    • F25B2600/0251Compressor control by controlling speed with on-off operation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/25Control of valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • F25B49/022Compressor control arrangements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present invention relates generally to improving energy efficiency of heating, ventilating, and air-conditioning systems. More particularly, the present invention relates to systems, devices and methods for improving efficiencies of over-sized heating, ventilating, and air-conditioning systems by controlling and extending cyclical run times of the systems.
  • Electric utilities need to match generation to load, or supply to demand. Traditionally, this is done on the supply side using Automation Generation Control (AGC).
  • AGC Automation Generation Control
  • loads are added to an electricity grid and demand rises, utilities increase output of existing generators to solve increases in demand.
  • utilities typically invest in additional generators and plants to match rising demand. As load levels fall, generator output to a certain extent may be reduced or taken off line to match falling demand.
  • the cost to add power plants and generation equipment that serve only to fill peak demand becomes extremely costly.
  • Demand-response technology used to manage thermostatically-controlled loads such as AC compressors typically consists of a demand-response thermostat or a load-control switch (LCS) device.
  • a demand-response thermostat generally controls operation of a load by manipulating space temperature.
  • An LCS device can be wired into the power supply line of the AC compressor or other electrical load, and thereby interrupt power to the load when the load is to be controlled.
  • demand-response schemes described above shed demand during peak times, especially for systems utilizing AC units, that demand is often time-delayed and merely pushed to another time along the utility demand timeline.
  • demand-response schemes are suitable for reducing peak loads, but do not always affect an actual decrease in energy usage.
  • a key problem lies in the energy consumed by AC units typically used in thermostatically-controlled HVAC systems. A majority of the energy consumed by such a system is spent powering the AC compressor. In a recent Environmental Protection Agency report, it was reported that air conditioning accounts for 13% of total home energy expenses on average, and over 20% in hot, humid regions. This statistic is made more significant by the fact that AC units are typically used between three to five months per year, so their effect on the peak demand during summer periods is very significant.
  • An oversized AC unit exacerbates the problem of high-energy consumption by HVAC systems.
  • the accurate sizing of HVAC equipment, and specifically, the AC unit is often quite challenging.
  • Many factors contribute to the proper sizing of an AC unit including the angle at which the sun contacts the home, the type of windows installed in the home, the interior window shading of the windows, the insulation installed in the home, the air circulation patterns, the efficiency of the duct system, and the size of the living space, among others.
  • those factors change over time as the home and landscaping ages. Because those involved with home construction or AC unit selection, like homeowners and homebuilders, do not want to undersize an AC unit and have to replace the unit later, AC units tend to be oversized. Additionally, oversized units typically provide cooling more quickly, thus avoiding any chance of not meeting the cooling demand of the occupants.
  • the oversizing of AC units contributes to the problem of energy overusage, among other issues.
  • One problem is the short run times of oversized units where the units run for shorter periods of time than are engineered for optimum operation.
  • the efficiency of air conditioners is low when first starting, and increases gradually, reaching peak efficiency in about 10 minutes for most residential AC units, (e.g. long enough for the unit to be running at optimum efficiency).
  • Even a properly sized unit will have short run times on days where cooling demand is low.
  • HVAC energy-efficiency characteristics
  • variable speed AC unit compressors and fans that may be used to increase system turndown.
  • such technology remains relatively expensive for new HVAC units.
  • retrofitting existing, working HVAC units to replace "single speed" technology with variable speed technology does not provide a convenient nor cost-effective solution for improving energy efficiency.
  • the present invention comprises a run time device for extending the time that a heating, ventilating, and air-conditioning (HVAC) system runs so as to increase energy efficiency of the HVAC system.
  • the extended run time device comprises: a sensing circuit adapted to receive a call-for-cool control signal from a temperature control device and output a control signal; a compressor time-extending switching device having a first terminal, a second terminal, and a third terminal, the first terminal adapted to electrically connect to a control circuit, such as a cooling contactor, that controls electrical power to a compressor of an HVAC system, the second terminal adapted to receive the call-for-cool control signal, and the third terminal adapted to receive a proxy call-for-cool control signal, the compressor time- extending switching device configured to selectively connect the first terminal to the second terminal, thereby causing the control circuit to receive the call-for-cool control signal, or to connect the first terminal to the third terminal, thereby causing the control circuit to receive the proxy call-for-cool signal; and a processor
  • the present invention comprises a method of improving energy efficiency of a heating, ventilating, and air-conditioning (HVAC) system that includes a temperature control device in communication with a compressor, and a circulation fan.
  • the method comprises: monitoring a call-for-cool control signal of a temperature control device, the call-for-cool control signal causing power to be applied to a compressor of an HVAC system for a requested compressor run-time period; determining the duration of the requested compressor run-time period of the temperature control device; comparing the duration of the requested run time period of the temperature control device to a predetermined minimum run-time period; and causing power to the compressor to be maintained for an extended compressor run-time period when the duration of the requested compressor run time period is less than the predetermined minimum run time period, the extended compressor run time period commencing after an expiration of the requested compressor run time period such that the compressor is powered for a total run time period that is greater than the requested compressor run-time period, thereby increasing an energy efficiency of the HVAC system.
  • HVAC heating, ventilating, and air-
  • the present invention comprises an extended run time device for extending the time that a compressor-based heating, ventilating, and air-conditioning (HVAC) system runs so as to increase energy efficiency of the HVAC system.
  • the extended run time device comprises: means for monitoring a call-for-cool control signal of a temperature control device, the call-for-cool control signal causing power to be applied to a compressor of the HVAC system for a requested run-time period; means for determining the duration of the requested run-time period of the temperature control device; means for comparing the duration of the requested run time period of the temperature control device to a predetermined minimum run-time period; and means for causing power to the compressor to be maintained for an extended run-time period when the duration of the requested run time period is less than the predetermined minimum run time period, the extended run time period commencing after an expiration of the requested run time period such that the compressor is powered for a total run time period that is greater than the requested run-time period, thereby increasing an energy efficiency of the HVAC system.
  • the present invention comprises an improved-efficiency heating, ventilating and air-conditioning (HVAC) system.
  • HVAC heating, ventilating and air-conditioning
  • the system comprises: a temperature control device monitoring and controlling a space temperature of a premise and transmitting a call-for-cool control signal; an outdoor unit receiving the call-for-cool control signal transmitted from the temperature control device, the outdoor unit including a compressor and an electrical contactor for switching power on and off to the compressor; and an extended run-time device in electrical communication with the thermostat and the outdoor unit, the extended run-time device receiving the call-for-cool control signal and causing the electrical contactor of the outdoor unit to maintain power to the compressor for an extended run-time period after the temperature control device ceases to transmit the call-for-cool control signal.
  • HVAC heating, ventilating and air-conditioning
  • FIG. 1 is a diagram of a premise receiving electricity through an electrical distribution network and having a heating, ventilating, and air conditioning (HVAC) system with an extended run-time (ERT) device, according to an embodiment of the present invention
  • HVAC heating, ventilating, and air conditioning
  • ERT extended run-time
  • FIG. 2 is an HVAC efficiency versus run time chart for an exemplary HVAC system
  • FIG. 3 is a block diagram of the HVAC system with the ERT device of FIG. 1, in a pre- extension mode, according to an embodiment of the present invention
  • FIG. 4 is the block diagram of the HVAC system and ERT device of FIG. 3, in an extension mode
  • FIG. 5 is a flow chart of a method of extending an HVAC system run time for improving system energy efficiency, according to an embodiment of the present invention. While the invention is amenable to various modifications and alternative forms, specifics thereof have been shown by way of example in the drawings and will be described in detail. It should be understood, however, that the intention is not to limit the invention to the particular embodiments described. On the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.
  • improved-efficiency heating, ventilating, and air-conditioning (HVAC) system 100 is depicted.
  • Improved-efficiency FJVAC system 100 is located at premise 102 which receives electricity from electrical utility provider 104.
  • Premise 102 though depicted as a residential building or home, may also be a commercial building, industrial building, or any such building or structure having an interior space requiring heating or cooling.
  • HVAC heating, ventilating, and air conditioning
  • improved-efficiency HVAC system 100 may comprise heating and cooling capability, just cooling capability, or just heating capability.
  • cooling configuration and operation it will be understood that the same configuration and operation may exist and operate as a heating configuration and operation.
  • Electrical utility provider 104 includes electricity generation equipment 106 connected to electricity transmission and distribution system 108. Electricity is generated by electricity generation equipment 106 at electrical utility provider 104 and transferred to premise 102 via electricity transmission and distribution system 108. Actual electricity consumption at premise 102 may be measured by electricity meter 110.
  • Electricity meter 110 may be a standard non- communicative device, or may be a "smart meter” tied into an Advanced Meter Infrastructure (AMI) or an electricity “smart grid", capable of communicating with electricity utility provider 104 over a long-haul communication network (not depicted), and in some cases capable of communicating with local devices a short-haul communication network (not depicted) at or near premise 102.
  • AMI Advanced Meter Infrastructure
  • electricity “smart grid” capable of communicating with electricity utility provider 104 over a long-haul communication network (not depicted), and in some cases capable of communicating with local devices a short-haul communication network (not depicted) at or near premise 102.
  • Improved-efficiency HVAC system 100 includes temperature control device 112, extended-run-time (ERT) device 114 of the present invention, forced air unit (FAU) 116 with circulation fan 118, and outdoor unit 120 with compressor 122.
  • Temperature control device 112 is in electrical communication with ERT device 114 and FAU 116; ERT device is in electrical communication with FAU 116 and outdoor unit 120.
  • Temperature control device 112 may be any of a number of known thermostats or temperature control devices used to regulate a temperature of a space within premise 102. As such, temperature control device 112 may be programmable, non-programmable, digital, mechanical, communicative, and so on. Temperature control device 112 may operate on 24 VAC, or another voltage as needed.
  • FAU 116 includes circulation fan 118, and may also include electrical control circuitry having several electrical terminals, as discussed further below.
  • FAU 116 may be any of several known types of forced air units used to condition and circulate air.
  • FAU 116 may also include heating and cooling elements, filters, dampers, and other related HVAC equipment not depicted.
  • FAU 116 and circulation fan 116 may be connected to ductwork for distributing conditioned air to all or portions of premise 102.
  • Circulation fan 118 in an embodiment may be a single-speed electric fan located within FAU 116, and turned on and off to move air through premise 102.
  • circulation fan 124 may be a variable-speed or adjustable-speed fan controlled to vary the rotation speed of the fan, and hence the air volume output of the fan.
  • Outdoor unit 120 in an embodiment is a condensing unit of an air-conditioning system or FFVAC system 100.
  • Outdoor unit 120 includes compressor 122, and as understood by those skilled in the art, generally includes a heat exchanger with condensing coils, a fan, valving, electrical components including a compressor contactor, and so on.
  • compressor 122 generally includes compressor 122, and as understood by those skilled in the art, generally includes a heat exchanger with condensing coils, a fan, valving, electrical components including a compressor contactor, and so on.
  • outdoor unit 120 may comprise a condensing unit of an air-conditioning system designed for cooling
  • outdoor unit 120 may also be a unit of a heat-pump or other such system, providing heating, rather than cooling.
  • ERT device 114 intercepts communications from temperature control device 112 to FAU 116 and outdoor unit 120 to extend run time of compressor 122 and circulation fan 118.
  • ERT device 114 is depicted as a stand-alone device in FIG. 1, it will be understood that ERT device 114 may alternatively be integrated into a temperature control device 112, load-control switch (LCS), outdoor unit 120, or FAU 116.
  • ERT device 114 is combined with temperature control device such as a thermostat, such that the present invention comprises a thermostat including ERT device 114.
  • ERT device 114 comprises a portion of a fan control board of FAU 116.
  • ERT device 114 is integrated into an LCS.
  • air is heated or cooled by improved-efficiency FJVAC system 100, and forced through a network of air ducts by circulation fan 118.
  • a thermostat calls for heating or cooling based on feedback from a temperature sensor within the conditioned space of premise 102.
  • the temperature control device 112 signals or requests compressor 122 to turn on, and for circulation fan 118 to circulate cooled air through the ductwork to various points about premise 102.
  • temperature control device 112 ceases signaling compressor 122, and eventually fan 118, to run.
  • temperature control device 112 again calls for cool, and the process repeats.
  • run time the time that the compressor is powered and actually runs
  • off time the time that the compressor is not powered, and therefore not running
  • HVAC system is depicted.
  • the vertical axis of the chart represents a range of system energy efficiency ratings (EER) ranging from “Min” for minimum efficiency to "Max” for maximum efficiency.
  • the horizontal axis of the chart represents system run time in minutes. In this depicted example chart, energy efficiency ranges from 0 to 7 EER, while time ranges from 0 to 10 minutes.
  • Point A Three points, Point A, Point B, and Point C are also depicted on the EER vs. Run Time chart of FIG. 2.
  • the system efficiency rating is 3 EER
  • Point B after running 5 minutes, the system efficiency has improved to 6 EER
  • Point C after running 9 minutes, which may be considered an optimal amount of time, or Topt, system efficiency is maximized at 7 EER.
  • EER v. Run Time chart is only an example of performance of a particular, theoretical HVAC system, the chart illustrates the general concept that when a compressor-based HVAC system begins to operate, system efficiency may be rather low, then, after some time has passed, energy efficiency increases non-linearly to its maximum after a period of time.
  • ERT device 114 provides a solution for improving the efficiency of such an oversized HVAC system by increasing minimum system run time Tmin to approach Topt.
  • FIG. 3 a block diagram of improved-efficiency HVAC system 100 and ERT device 114 is depicted.
  • ERT device 114 includes power supply 130, processor 132, memory 134, compressor time-extending switching device 136, circulation fan time-extending switching device 138 and call-for-cool sensing circuit 140.
  • Power supply 130 receives power from an external power source, such as from FAU
  • power supply 130 receives a 24V AC power via the POWER and COMMON terminals of FAU 116. In other embodiments, power supply 130 may receive a 120 VAC or other such power as is locally available.
  • Processor 132 may comprise a central processing unit, microprocessor, microcontroller, microcomputer, or other such known computer processor. Processor 132 is in communication with memory 134, compressor time-extending switching device 136, fan time-extending switching device 138 and call-for-cool sensing circuit 140.
  • processor 132 is in communication with compressor time-extending switching device 136 by way of compressor time-extending relay control line 151; with fan time- extending relay 138 by way of fan time-extending relay control line 152; and with call-for-cool sensing circuit 140 by way of call-for-cool control line 154.
  • Memory 134 which may be a separate memory device or memory device integrated into processor 132, may comprise various types of volatile memory, including RAM, DRAM, SRAM, and so on, as well as non-volatile memory, including ROM, PROM, EPROM, EEPROM, flash, and so on. Memory 134 may store programs, software, and instructions relating to the operation of ERT device 114.
  • Compressor time-extending switching device 136 comprises an electrically operated switch, which in an embodiment comprises a relay, which may be normally-closed single-pole, double throw relay switch.
  • Compressor time-extending switching device 136 may also comprise other types of switching devices, in addition to any of various types of known relays.
  • compressor time-extending switching device 136 comprises a switching device of a load-control switch (LCS).
  • LCS load-control switch
  • An electrical utility selectively controls power delivery to a device, such as a compressor 122, typically by switching a device, such as a relay or other switch, including switching device 136, on and off as needed to shed load and reduce electrical demand.
  • ERT 114 components and/or functionality may be integrated into such an LCS.
  • the LCS and ERT device 114 may also comprise a communications module for communicating with an electrical utility 104.
  • the communications module may include a receiver, transmitter, antenna, memory, and so on, for data transmission over a local and/or long-haul communications network, such as an RF, paging, AMI, or cellular network.
  • compressor time-extending switching device 136 includes first terminal 137a, second terminal 137b, and third terminal 138c.
  • First terminal 137a electrically connects to a terminal of control circuit 150, which in an embodiment comprises a cooling contactor.
  • Second terminal 137b electrically connects to control line COOL to receive the call- for-cool control signal from temperature control device 112.
  • Third terminal 137c is electrically connected to a terminal or an output of power supply 130 via power line POWER.
  • Compressor time-extending switching device 136 toggles compressor control line COOL' and first terminal 137a between second terminal 137b and call-for-cool line COOL as received from temperature control device 112 via call-for-cool sensing circuit 140, and third terminal 137c and power line POWER as received from FAU 116 and/or temperature control device 112.
  • Compressor time-extending switching device 136 receives, and is driven by, a control signal received from processor 132 via control signal line 151.
  • Fan time-extending switching device 138 similar to compressor time-extending switching device 136, comprises an electrically operated switch, which in an embodiment comprises a relay, such as a normally-closed single-pole, double throw relay switch. Fan time- extending switching device 138 may also comprise other types of switching devices, in addition to any of various types of known relays.
  • fan time-extending switching device 138 includes first terminal 139a, second terminal 139b, and third terminal 139c.
  • First terminal 139a electrically connects to terminal FAN' of FAU 1 16.
  • Second terminal 139b electrically connects to control line FAN to receive the call-for-fan control signal from temperature control device 112.
  • Third terminal 139c is electrically connected to a terminal or an output of power supply 130 via power line POWER.
  • Fan time-extending switching device 138 toggles first terminal 139a and control line FAN' between second terminal 139b and call-for-fan line FAN as received from temperature control device 112, and third terminal 139c and a power line POWER as received from FAU 116 and/or temperature control device 112. Fan time-extending switching device 138 is driven by a fan control signal received from processor 132 via control signal line 152.
  • ERT device 114 may not include a fan time-extending switching device 138, and rather relies on programming within temperature control device 112 to control fan operation.
  • Call-for-cool sensing circuit 140 in an embodiment comprises a trigger sense circuit, such as a Schmitt trigger.
  • Call-for-cool circuit 140 senses the presence or absence of a call-for-cool control signal at line COOL as provided by temperature control device 112.
  • call-for-cool sense circuit is a trigger sense circuit sampling the call-for-cool control line COOL on a periodic basis to determine whether temperature control device 112 is calling for compressor 122 to operate so as to cool premise 102.
  • temperature control device 112 may utilize a 24V AC control logic such that call-for-cool control line COOL goes "high" to 24V AC when temperature control device 112 calls for cool, and "low” or ground/common when not calling for cool.
  • Call-for-cool sensing circuit 140 regularly samples signal COOL such that processor 132 can determine when temperature control device 112 is calling for cool, i.e., for compressor 122 to run.
  • compressor time-extending switching device 136 and fan time- extending switch 138 hold switch positions such that compressor 122 is in electrical communication with the COOL output (call-for-cool signal) at temperature control device 112 through control circuit 150, and forced air unit 116 and its circulation fan 118 are electrically connected to call-for-fan terminal FAN (call-for-fan signal) at temperature control device 112.
  • ERT device 114 allows temperature control device 112 to control compressor 122 and circulation fan 118.
  • temperature control device 112 when temperature control device 112 senses that a space temperature of premise 102 has fallen below a set point temperature, temperature control device 112 outputs a "high" control voltage at terminals COOL and FAN, which are received, respectively, by control circuit 150 of outdoor unit 120 and circulation fan 118 of forced air unit 116. Consequently, control circuit 150 upon receiving the call-for-cool signal from temperature control device 112 switches line voltage on to compressor 122.
  • control circuit 150 is a contactor relay or other similar switch that switches line voltage on and off compressor 122 based on a received control signal, such as COOL'.
  • the contactor may be one of many known contactors or other known controlling devices for switching the power of compressor 122, wherein compressor 122 may be an air-conditioning compressor, heat pump, or other such generally high-current-load device of a heating or cooling circuit.
  • Control circuit 150 may operate on alternating current (AC) or direct current (DC), and at a control circuit voltage appropriate for the particular control circuit, such as 24V AC.
  • Line voltage providing power to compressor 122 may be any of known voltages available to compressor 122. In the United States, in a residential application, line voltage is often 240 VAC.
  • system 100 is depicted as switching compressor 122 on and off via control circuit 150, in other embodiments, other switching configurations may be utilized.
  • ERT device 114 outputs line voltage for use by compressor 122.
  • compressor 122 provides heat for a system 100 that may comprise a heat pump
  • operation is generally the same, except that a call for heat is substituted for a call for cool.
  • call-for-cool sensing circuit 140 monitors call-for-cool line COOL and provides data to processor 132.
  • call-for-cool sensing circuit 140 continuously samples COOL at a predetermined rate.
  • the sampling frequency or rate is one sample every 1 ⁇ 2 second. If greater accuracy is desired, the sampling rate may be decreased, and for lesser accuracy, the sampling rate increased.
  • Processor 132 receives a signal representing call-for-cool data from call-for-cool sensing circuit 140 at control line 154 and determines the time period that temperature control device 112 calls for cool, or requested compressor "run time” for each on and off cycle. As described further below with respect to FIG. 5, processor 132 then determines whether to allow compressor 122 to be turned off when temperature control device 112 stops calling for cool (generally at a point when the space temperature is at or below the desired temperature set point in the case of cooling), or to extend the run time of compressor 122, and in some embodiments the run time of circulation fan 118, thereby increasing efficiency of system 100 and compressor 122.
  • processor 132 determines that a requested run time of compressor 122 and/or fan 118 should be extended, when call-for-cool signal COOL as provided by terminal COOL of temperature control device 112 stops calling for cool, which in an embodiment means switching from a high control voltage of 24V AC to low control voltage, processor 132 delivers a control signal to compressor time-extending switching device 136 via line 151, causing switching device 136 to switch.
  • compressor time-extending switching device 136 switches such that first terminal 137a no longer is connected to second terminal 137b, but rather, is connected to third terminal 137c.
  • call-for-cool line COOL' which controls operation of compressor 122, switches from COOL to POWER. Consequently, when temperature control device 112 stops calling for cool and reduces the control voltage at COOL to low, processor 132 causes relay 136 to connect compressor call-for-cool line COOL' to a constant logic high source, POWER.
  • This constant logic high source may be considered a "proxy" call-for-cool signal in that the signal received at call-for-cool line COOL' is electrically equivalent, or substantially similar, to the call-for-cool signal output from temperature control device 112. The result is that compressor 122 continues to receive a control signal indicating that control circuit 150 should continue to power compressor 122 even after temperature control device 112 stops calling for cool.
  • processor 132 may also extend the operation of circulation fan 118.
  • a circulation fan operates for a period of time after the compressor is turned off. During this incremental period of time that the fan runs and the compressor does not, air is circulated over the evaporator coils of the system, providing some additional cooling/heating effect, and also lowering humidity levels of the circulated air.
  • system 100 of the present invention also extends operation of circulation fan 118 beyond the time that compressor 122 is turned off.
  • temperature control device 112 will generally call for circulation fan 118 to operate while compressor 122 is operating. As such, when temperature control device 112 calls for cool, it also generally calls for fan 118 to run. If processor 132 extends operation of compressor 122, in an embodiment, it also extends operation of circulation fan 118. Similar to the operation of compressor time-extending switching device 136, processor 132 provides a control signal via fan control signal line 152 to fan time-extending switching device 138 causing relay 138 to switch call-for-fan control line FAN' (first terminal 139a) from FAN (second terminal 139b) to POWER (third terminal 139c). Consequently, even though temperature control device 112 stops calling for fan, forced air unit 116 and its circulation fan 118 continue to receive a call for fan via fan time-extending switching device 138.
  • processor 132 extends the operation of circulation fan 118 whenever processor 132 extends the operation of compressor 122.
  • the duration of the extended call-for-fan time period may be equal to or greater than the duration of the extended call-for-cool time period.
  • operation of circulation fan 118 may be extended independent of any extension of the operation of compressor 122.
  • the objective of extending the total run time of compressor 122 and circulation fan 118 is to operate these components of improved-efficiency FJVAC system 100 for a period of time that improves system efficiency. For example, if HVAC system 100 was operating at point A on the chart of FIG.
  • ERT device 114 may cause a minimum run time Tmin of system 100, by way of compressor 122 and generally fan 118, to be increased such that system 100 operates at Point B (minimum run time of 5 minutes, EER of 6) or at Point C (minimum run time of 9 minutes, which is equal to Topt, EER at maximum of 7).
  • ERT device 114 may increase or extend run time to force system 100 to operate at maximum efficiency, for example, at Point C, or at other points less than maximum efficiency, for example, Point B. Such an extension of the run time may be brought about by gradual increases in run time until a desire run time is achieved. Further, if ERT device 114 detects that temperature control device 112 already is operating for a period of time as requested by temperature control device 112 and above a minimum run time, such as Topt, ERT device 114 may not extend the run time further.
  • minimum run time, Tmin is simply the predetermined total amount of time that compressor 122 and HVAC system 100 needs to run in a single on/off cycle in order to operate at maximum system efficiency.
  • minimum run time is less than the amount of time that compressor 122 and HVAC system 100 needs to run in order to operate at maximum system efficiency. In other words, for a single cycle, compressor 122 runs for a period of time that is less than that which would result in optimum efficiency, but still improves system efficiency.
  • FIG. 5 a flowchart depicting the steps for determining and implementing an extended system run time is depicted. More specifically, the flowchart of FIG. 5 depicts the steps for extending system run time for a cooling system over a single operating cycle (one run time period followed by an off time period). It will be understood that these steps may also apply to a heating system. In such a method, a "call for heat" control signal, rather than a call for cool control signal may be implemented, with temperature control device 112 calling for heat when a space temperature falls below a predetermined set point, rather than above.
  • temperature control device 112 monitors a space temperature of premise
  • temperature control device 112 outputs a call-for-cool control signal.
  • temperature control device 112 may be programmed or otherwise configured to allow a space temperature to rise by a predetermined amount above the desired temperature set point so as to prevent frequent cycling of HVAC system 100. For example, despite a temperature set point of 72°F, the space temperature may be allowed to rise to 72.5°F or 73°F, before temperature control device 112 calls for cool.
  • step 172 if the measured space temperature is at or below the predetermined temperature set point, temperature control device 112 continues to monitor the space temperature at step 170.
  • temperature control device 112 outputs a call-for-cool control signal.
  • temperature control device 112 outputs a 24 VAC control signal (call-for-cool control signal) at terminal COOL of temperature control device 112, which is received by ERT device 114 at call-for-cool sensing circuit 140.
  • temperature control device 112 would similarly output a call-for-heat control signal which would be received by a call-for-heat sensing circuit 140 of ERT device 114.
  • temperature control device 112 also outputs a call-for-fan control signal.
  • a call-for-fan control signal is depicted in FIG. 3, wherein temperature control device 112 outputs a call-for-fan control signal of 24V AC at terminal FAN, which is then received by ERT device 114 at fan time-extending switching device 138, and conveyed to FAU 116.
  • the call-for-cool control signal results in power being applied to compressor 122, such that compressor 122 begins to run.
  • the call for cool is conveyed to control circuit 150, which causes a relay within control circuit 150 to connect line voltage to compressor 122, causing it to begin running.
  • call-for-fan control signal is received at FAU 116, which causes circulation fan 118 to begin to operate, and circulate air cooled by compressor 122 through system 100.
  • ERT device 114 monitors the call-for-cool control signal output by temperature control device 112.
  • call-for-cool sensing circuit 140 samples the call-for-cool signal output to determine whether the call-for-cool control signal is "high” or "low", or in other words, whether temperature control device 112 is calling for cool.
  • call-for-cool sense circuit samples the voltage at signal line COOL (equivalent to terminal COOL of temperature control device 112) at a predetermined frequency.
  • Call-for-cool sensing circuit 140 transmits over line 154 sampled data or data representative of the sampled data to processor 132.
  • Processor 132 receives the sampled data representing the call-for-cool control signal. Processor 132 uses the call-for-cool control signal data to determine how long temperature control device 112 has been calling or requesting cool, and hence how long compressor 122 has been running. Such a calculation may be calculated and updated continuously such that a new compressor run time is calculated with each new data sample received, or a single compressor run time may be calculated when temperature control device 112 ceases to call for cool.
  • step 180 temperature control device 112 ceases to call for cool. Generally, this is a result of a space temperature reaching a desired temperature set point, such compressor 122 would normally be turned off.
  • temperature control device 112 determines the period of time that temperature control device 112 was calling for cool, the requested compressor run time T RE Q. For example, if temperature control device 112 called for cool such that call-for-cool control signal line COOL was at 24V AC for 5 minutes, then stopped calling for cool such that COOL dropped to 0VAC, processor 132 would determine based upon sampled data received from call- for-cool sensing circuit 140, that requested compressor run time T RE Q was 5 minutes.
  • a single occurrence of a change in control voltage from high to low at signal line COOL will identify an end of the time period T RE Q.
  • a change in control voltage must be sustained for a minimum period of time, or sampling periods.
  • processor 132 After determining the requested compressor run time T RE Q at step 182, processor 132 compares T RE Q to a predetermined desired run time T MIN at step 184. If T RE Q is not less than a predetermined desired run time T MIN , i.e., is equal to or greater than T MIN , power is removed from compressor 122 at step 188, and temperature control device 112 continues to monitor the space temperature of premise 102 at step 170. In such a condition, namely, when T RE Q is equal to or greater than T MIN , compressor 122 and system 100 is operating at a sufficient efficiency level such that no intervention in the form of an extended run time, is required. If at step 184 processor 132 determines that T RE Q is less than a predetermined desired run time T MIN , then control of compressor 122 and fan 1 18 is switched over to ERT device 1 14 at step 186.
  • step 190 power to compressor 122 and fan 1 18 is maintained, causing compressor 122 and fan 1 18 to continue running, thereby extending the run time of compressor 122 and fan 1 18.
  • the additional run time above the requested run time T RE Q is defined as extended run time ⁇ ⁇ ⁇ , such that a total run time ⁇ is the sum of T RE Q and ⁇ ⁇ ⁇ .
  • will be equal to TMIN-
  • the additional extended run time T EXT may be different for compressor 122 and fan 1 18.
  • fan 1 18 continues to run after power is removed from compressor 122.
  • fan 1 18 T EXT is greater than compressor 122 T EXT . Extending the run time for either compressor 122 or fan 1 18 is described above with respect to FIGS. 3 and 4.
  • step 192 at the end of the extended run time period ⁇ ⁇ ⁇ , control of compressor 122 and fan 1 18 is returned to temperature control device 1 12.
  • this step is accomplished when processor 132 causes compressor time-extending switching device 136 to connect compressor control line COOL' to temperature control device 1 12 output COOL, and when processor 132 causes fan time- extending switching device 138 to connect control line FAN' to temperature control device 1 12 output FAN.
  • temperature control device 1 12 then controls operation of compressor 122 and circulation fan 1 18.
  • temperature control device 1 12 when control is turned over to temperature control device 1 12 at the end of the extend run time period T EXT , temperature control device 1 12 will generally not be calling for cool or fan because compressor 122 and fan 1 18 have been operating. In such a case, a control voltage at COOL' and FAN', as output from temperature control device 1 12, will be low, and power to compressor 122 and fan 1 18 will be removed.
  • temperature control device 1 12 will continue to monitor the space temperature of premise 102 at step 170, and the cycle begins again.
  • ⁇ ⁇ ⁇ is simply as follows:
  • processor 132 dynamically determines ⁇ ⁇ ⁇ based on the previous operating cycle, or a combination of previous operating cycles, such that compressor 122 and/or fan 1 18 always runs for at least the predetermined minimum time period T MIN - AS described above, T MIN may be selected based on an overall desired efficiency of system 100, or compressor 122. If optimum efficiency is desired, T MIN will generally be equal to ⁇ 0 ⁇
  • an HVAC system 100 has a maximum energy efficiency rating of 7 at a run time equal 9 minutes.
  • the run time of 9 minutes is defined as the optimal run time TO PT . If system 100 is oversized with respect to premise 102 such that system 100 and compressor 122 generally run less than the optimal run time TO PT of 9 minutes, then the run time is extended using ERT device 1 14.
  • a predetermined minimum run time T MIN may be set equal to TO PT , or 9 minutes, such that system 100 operates at Point C as depicted in FIG. 2.
  • T MIN may be set to another run time less than TO PT , which in an embodiment is 5 minutes, corresponding to Point B in FIG. 2, and having an EER of 6.
  • T MIN may be a predetermined time period that causes compressor 122 to operate anywhere along the EER vs. run time curve, thusly improving the efficiency of system 100 and compressor 122 in any increment.
  • Forcing compressor 122 and circulation fan 1 18 to operate longer than requested by temperature control device 1 12 not only improves system 100 efficiency, but also improves humidity control and air mixing by allowing fan 1 18 to operate for longer periods of time.
  • an oversized system 100 operates without an ERT device 1 14 at Point A, such that temperature control device 1 12 request that compressor 122 run for only 1 minute every cycle in order to hold a desired temperature set point at a space of premise 102.
  • System 100 efficiency may be improved by extending compressor 122 run time by T EXT to move operation of system 100 along the curve depicted in FIG. 2. If T MIN is set to 9 minutes for maximum system efficiency, ⁇ ⁇ ⁇ is equal to 8 minutes, causing compressor 122 to run for 9 minutes total, rather than 1 minute.
  • temperature control device 1 12 requested a 1 minute run time based on the amount of time needed, or cool air volume needed, to cool premise 102 to the desired temperature set point. If system 100 continues to operate for 8 minutes beyond what is required to meet the temperature set point needs, a space temperature of premise 102 will fall well below the desired temperature set point. Some persons may find such temperature swings noticeable and uncomfortable.
  • T EXT is still determined based on EQN. 1 above, but will have a shorter duration when T MIN is less than TO PT .
  • a user or on-site technician initially sets T MIN to be at TO PT , then adjusts T MIN downward until temperature variations resulting from system 100 turning on and off are acceptable based on user perception.
  • ⁇ ⁇ ⁇ may be defined as a multiple of T RE Q as follows:
  • M is predetermined multiplier used to determine ⁇ ⁇ ⁇
  • ⁇ ⁇ ⁇ may be capped such that T TOT does not exceed T 0PT , so as to maximize efficiency, but minimize temperature variation in premise 102.
  • ⁇ ⁇ ⁇ may be defined by the following two equations:
  • TEXT Min (M x TREQ,T 0 PT - T REQ ) for TREQ ⁇ T 0 PT
  • Table 1 may characterize a range of requested run times T RE Q for a single system 100 or compressor 122, that vary with cooling or heating loads.
  • multiplier M is held constant at 0.5.
  • requested run time for a system 100 may change as depicted in Table 1, ranging from 1 minute to 12 minutes.
  • Multiplier M is held constant, regardless of run time.
  • T EXT is determined by processor 132 according to EQNS. 3 and 4. Total run time ⁇ ⁇ ⁇ is increased as shown, and system efficiencies improved.
  • multiplier M may be dynamically determined by processor
  • multiplier M varies inversely to requested run time T RE Q.
  • M is generally larger for shorter requested run times T RE Q, and smaller for longer requested run times T RE Q.
  • embodiments of the present invention may include alternate algorithms for determining extended run time T EXT and multiplier M, based upon the principles of extending compressor run time so as to increase efficiency, with minimal temperature variation and possible discomfort at a premise 102.

Abstract

An extended run time device for extending the time that a compressor-based heating, ventilating, and air-conditioning (HVAC) system runs so as to increase energy efficiency of the HVAC system. The extended run time device includes a sensing circuit, a switching device and a processor. Based upon a signal from the sensing circuit, the processor causes the switching device to transmit a proxy control signal to the compressor, thereby causing power to the compressor to be maintained for a time period longer than a time period requested by the temperature control device.

Description

IMPROVED EFFICIENCY HEATING, VENTILATING, AND AIR-CONDITIONING THROUGH EXTENDED RUN-TIME CONTROL
FIELD OF THE INVENTION
The present invention relates generally to improving energy efficiency of heating, ventilating, and air-conditioning systems. More particularly, the present invention relates to systems, devices and methods for improving efficiencies of over-sized heating, ventilating, and air-conditioning systems by controlling and extending cyclical run times of the systems.
BACKGROUND OF THE INVENTION
Electric utilities need to match generation to load, or supply to demand. Traditionally, this is done on the supply side using Automation Generation Control (AGC). As loads are added to an electricity grid and demand rises, utilities increase output of existing generators to solve increases in demand. To solve the issue of continuing long-term demand, utilities typically invest in additional generators and plants to match rising demand. As load levels fall, generator output to a certain extent may be reduced or taken off line to match falling demand. As the overall demand for electricity grows, the cost to add power plants and generation equipment that serve only to fill peak demand becomes extremely costly.
In response to the high cost of peaking plants, electric utility companies have developed solutions and incentives aimed at reducing both commercial and residential demand for electricity. In the case of office buildings, factories and other commercial buildings having relatively large-scale individual loads, utilities incentivize owners with differential electricity rates to install locally-controlled load-management systems that reduce on-site demand. Reduction of any individual large scale loads by such a load-management systems may significantly impact overall demand on its connected grid.
In the case of individual residences having relatively small-scale electrical loads, utilities incentivize some consumers to allow installation of demand-response technology at the residence to control high-usage appliances such as air-conditioning (AC) compressors, water heaters, pool heaters, and so on. Such technology aids the utilities in easing demand during sustained periods of peak usage.
Demand-response technology used to manage thermostatically-controlled loads such as AC compressors typically consists of a demand-response thermostat or a load-control switch (LCS) device. A demand-response thermostat generally controls operation of a load by manipulating space temperature. An LCS device can be wired into the power supply line of the AC compressor or other electrical load, and thereby interrupt power to the load when the load is to be controlled.
However, while the demand-response schemes described above shed demand during peak times, especially for systems utilizing AC units, that demand is often time-delayed and merely pushed to another time along the utility demand timeline. In other words, demand-response schemes are suitable for reducing peak loads, but do not always affect an actual decrease in energy usage. A key problem lies in the energy consumed by AC units typically used in thermostatically-controlled HVAC systems. A majority of the energy consumed by such a system is spent powering the AC compressor. In a recent Environmental Protection Agency report, it was reported that air conditioning accounts for 13% of total home energy expenses on average, and over 20% in hot, humid regions. This statistic is made more significant by the fact that AC units are typically used between three to five months per year, so their effect on the peak demand during summer periods is very significant.
An oversized AC unit exacerbates the problem of high-energy consumption by HVAC systems. The accurate sizing of HVAC equipment, and specifically, the AC unit, is often quite challenging. Many factors contribute to the proper sizing of an AC unit, including the angle at which the sun contacts the home, the type of windows installed in the home, the interior window shading of the windows, the insulation installed in the home, the air circulation patterns, the efficiency of the duct system, and the size of the living space, among others. In addition, those factors change over time as the home and landscaping ages. Because those involved with home construction or AC unit selection, like homeowners and homebuilders, do not want to undersize an AC unit and have to replace the unit later, AC units tend to be oversized. Additionally, oversized units typically provide cooling more quickly, thus avoiding any chance of not meeting the cooling demand of the occupants.
However, the oversizing of AC units contributes to the problem of energy overusage, among other issues. One problem is the short run times of oversized units where the units run for shorter periods of time than are engineered for optimum operation. The efficiency of air conditioners is low when first starting, and increases gradually, reaching peak efficiency in about 10 minutes for most residential AC units, (e.g. long enough for the unit to be running at optimum efficiency). In addition even a properly sized unit will have short run times on days where cooling demand is low.
A number of other problems arise because of short run times. Relatively short operation times followed by relatively long off times do not allow the HVAC system to effectively remove humidity. Improperly dehumidified air adversely effects home comfort, reduces AC cooling efficiency, and can also promote the growth of mold and mildew indoors. Likewise, short run times decrease overall air circulation, resulting in repercussions on air quality and home comfort. Perhaps most importantly, short run times costs homeowners and commercial building owners additional money to operate, as the units are not operating at peak efficiency and reduction in overall life of the unit because the number of AC unit cycles is directly related to a units life (more than just runtime hours).
One attempt at improving the energy-efficiency characteristics of HVAC systems relies on variable speed AC unit compressors and fans that may be used to increase system turndown. However, such technology remains relatively expensive for new HVAC units. Further, retrofitting existing, working HVAC units to replace "single speed" technology with variable speed technology does not provide a convenient nor cost-effective solution for improving energy efficiency.
Another attempt at improving AC system efficiency is described in U.S. Patent No. 5,960,639 to Hammer, entitled "Apparatus for Regulating Compressor Cycles to Improve Air Conditioning/Refrigeration Unit Efficiency". Hammer discloses methods and systems for addressing compressor short-cycling. Short-cycling occurs when the time between a compressor stopping then restarting is so short that coolant pressures within the HVAC system do not have time to equalize, and the compressor does not have time to cool. Such conditions may occur in undersized HVAC systems, and result in decreased system efficiency. While the invention disclosed by Hammer addresses efficiencies for systems experiencing short-cycling, often in undersized units, or on peak usage days, Hammer fails to address the energy inefficiencies caused by short run times (as opposed to short off times) occurring in oversized AC systems.
Thus, there remains a need for technology capable of reducing energy imposing efficiencies of existing, oversized HVAC systems.
SUMMARY OF THE INVENTION
In an embodiment, the present invention comprises a run time device for extending the time that a heating, ventilating, and air-conditioning (HVAC) system runs so as to increase energy efficiency of the HVAC system. The extended run time device comprises: a sensing circuit adapted to receive a call-for-cool control signal from a temperature control device and output a control signal; a compressor time-extending switching device having a first terminal, a second terminal, and a third terminal, the first terminal adapted to electrically connect to a control circuit, such as a cooling contactor, that controls electrical power to a compressor of an HVAC system, the second terminal adapted to receive the call-for-cool control signal, and the third terminal adapted to receive a proxy call-for-cool control signal, the compressor time- extending switching device configured to selectively connect the first terminal to the second terminal, thereby causing the control circuit to receive the call-for-cool control signal, or to connect the first terminal to the third terminal, thereby causing the control circuit to receive the proxy call-for-cool signal; and a processor in electrical communication with the sensing circuit and the compressor time-extending switching device, the processor adapted to receive the sense signal from the sensing circuit, determine a requested compressor run time based upon the call- for-cool signal, and to transmit a switching control signal to the compressor time-extending switching device, thereby controlling the compressor time-extending switching device; wherein when the requested compressor run time is less than a predetermined minimum compressor run time, the processor transmits the switching control signal to the compressor time-extending switching device, causing the compressor time-extending switching device to disconnect the first terminal from the second terminal, and to connect the first terminal to the third terminal, thereby causing the control circuit to receive the proxy call-for-cool control signal such that the control circuit causes power to be maintained to the compressor for an extended run time period.
In another embodiment, the present invention comprises a method of improving energy efficiency of a heating, ventilating, and air-conditioning (HVAC) system that includes a temperature control device in communication with a compressor, and a circulation fan. The method comprises: monitoring a call-for-cool control signal of a temperature control device, the call-for-cool control signal causing power to be applied to a compressor of an HVAC system for a requested compressor run-time period; determining the duration of the requested compressor run-time period of the temperature control device; comparing the duration of the requested run time period of the temperature control device to a predetermined minimum run-time period; and causing power to the compressor to be maintained for an extended compressor run-time period when the duration of the requested compressor run time period is less than the predetermined minimum run time period, the extended compressor run time period commencing after an expiration of the requested compressor run time period such that the compressor is powered for a total run time period that is greater than the requested compressor run-time period, thereby increasing an energy efficiency of the HVAC system.
In another embodiment, the present invention comprises an extended run time device for extending the time that a compressor-based heating, ventilating, and air-conditioning (HVAC) system runs so as to increase energy efficiency of the HVAC system. The extended run time device comprises: means for monitoring a call-for-cool control signal of a temperature control device, the call-for-cool control signal causing power to be applied to a compressor of the HVAC system for a requested run-time period; means for determining the duration of the requested run-time period of the temperature control device; means for comparing the duration of the requested run time period of the temperature control device to a predetermined minimum run-time period; and means for causing power to the compressor to be maintained for an extended run-time period when the duration of the requested run time period is less than the predetermined minimum run time period, the extended run time period commencing after an expiration of the requested run time period such that the compressor is powered for a total run time period that is greater than the requested run-time period, thereby increasing an energy efficiency of the HVAC system.
In yet another embodiment, the present invention comprises an improved-efficiency heating, ventilating and air-conditioning (HVAC) system. The system comprises: a temperature control device monitoring and controlling a space temperature of a premise and transmitting a call-for-cool control signal; an outdoor unit receiving the call-for-cool control signal transmitted from the temperature control device, the outdoor unit including a compressor and an electrical contactor for switching power on and off to the compressor; and an extended run-time device in electrical communication with the thermostat and the outdoor unit, the extended run-time device receiving the call-for-cool control signal and causing the electrical contactor of the outdoor unit to maintain power to the compressor for an extended run-time period after the temperature control device ceases to transmit the call-for-cool control signal.
BRIEF DESCRIPTION OF THE DRAWINGS
The invention may be more completely understood in consideration of the following detailed description of various embodiments of the invention in connection with the accompanying drawings, in which:
FIG. 1 is a diagram of a premise receiving electricity through an electrical distribution network and having a heating, ventilating, and air conditioning (HVAC) system with an extended run-time (ERT) device, according to an embodiment of the present invention;
FIG. 2 is an HVAC efficiency versus run time chart for an exemplary HVAC system; FIG. 3 is a block diagram of the HVAC system with the ERT device of FIG. 1, in a pre- extension mode, according to an embodiment of the present invention;
FIG. 4 is the block diagram of the HVAC system and ERT device of FIG. 3, in an extension mode; and
FIG. 5 is a flow chart of a method of extending an HVAC system run time for improving system energy efficiency, according to an embodiment of the present invention. While the invention is amenable to various modifications and alternative forms, specifics thereof have been shown by way of example in the drawings and will be described in detail. It should be understood, however, that the intention is not to limit the invention to the particular embodiments described. On the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.
DETAILED DESCRIPTION
Referring to FIG. 1, improved-efficiency heating, ventilating, and air-conditioning (HVAC) system 100 is depicted. Improved-efficiency FJVAC system 100 is located at premise 102 which receives electricity from electrical utility provider 104.
Premise 102 though depicted as a residential building or home, may also be a commercial building, industrial building, or any such building or structure having an interior space requiring heating or cooling. Though the term "HVAC" is generally understood to mean "heating, ventilating, and air conditioning", it will be understood that improved-efficiency HVAC system 100 may comprise heating and cooling capability, just cooling capability, or just heating capability. As such, when specific reference is made to a cooling configuration and operation, it will be understood that the same configuration and operation may exist and operate as a heating configuration and operation.
Electrical utility provider 104 includes electricity generation equipment 106 connected to electricity transmission and distribution system 108. Electricity is generated by electricity generation equipment 106 at electrical utility provider 104 and transferred to premise 102 via electricity transmission and distribution system 108. Actual electricity consumption at premise 102 may be measured by electricity meter 110.
Electricity meter 110 may be a standard non- communicative device, or may be a "smart meter" tied into an Advanced Meter Infrastructure (AMI) or an electricity "smart grid", capable of communicating with electricity utility provider 104 over a long-haul communication network (not depicted), and in some cases capable of communicating with local devices a short-haul communication network (not depicted) at or near premise 102.
Improved-efficiency HVAC system 100 includes temperature control device 112, extended-run-time (ERT) device 114 of the present invention, forced air unit (FAU) 116 with circulation fan 118, and outdoor unit 120 with compressor 122. Temperature control device 112 is in electrical communication with ERT device 114 and FAU 116; ERT device is in electrical communication with FAU 116 and outdoor unit 120. Temperature control device 112 may be any of a number of known thermostats or temperature control devices used to regulate a temperature of a space within premise 102. As such, temperature control device 112 may be programmable, non-programmable, digital, mechanical, communicative, and so on. Temperature control device 112 may operate on 24 VAC, or another voltage as needed.
FAU 116 includes circulation fan 118, and may also include electrical control circuitry having several electrical terminals, as discussed further below. FAU 116 may be any of several known types of forced air units used to condition and circulate air. FAU 116 may also include heating and cooling elements, filters, dampers, and other related HVAC equipment not depicted. FAU 116 and circulation fan 116 may be connected to ductwork for distributing conditioned air to all or portions of premise 102.
Circulation fan 118 in an embodiment may be a single-speed electric fan located within FAU 116, and turned on and off to move air through premise 102. In other embodiments, circulation fan 124 may be a variable-speed or adjustable-speed fan controlled to vary the rotation speed of the fan, and hence the air volume output of the fan.
Outdoor unit 120 in an embodiment is a condensing unit of an air-conditioning system or FFVAC system 100. Outdoor unit 120 includes compressor 122, and as understood by those skilled in the art, generally includes a heat exchanger with condensing coils, a fan, valving, electrical components including a compressor contactor, and so on. Although generally referred to an "outdoor" unit, it will be understood that although condensing units and other such units of an HVAC system are typically located at an exterior of a building, such as premise 102, unit 120 could in some embodiments be located inside premise 102. Further, it will also be understood that while outdoor unit 120 may comprise a condensing unit of an air-conditioning system designed for cooling, outdoor unit 120 may also be a unit of a heat-pump or other such system, providing heating, rather than cooling.
ERT device 114, as described further below with respect to FIGS. 3-5, intercepts communications from temperature control device 112 to FAU 116 and outdoor unit 120 to extend run time of compressor 122 and circulation fan 118.
Although ERT device 114 is depicted as a stand-alone device in FIG. 1, it will be understood that ERT device 114 may alternatively be integrated into a temperature control device 112, load-control switch (LCS), outdoor unit 120, or FAU 116. In one such alternative embodiment, ERT device 114 is combined with temperature control device such as a thermostat, such that the present invention comprises a thermostat including ERT device 114. In another such alternative embodiment, ERT device 114 comprises a portion of a fan control board of FAU 116. In yet another such alternate embodiment, ERT device 114 is integrated into an LCS.
In general operation, air is heated or cooled by improved-efficiency FJVAC system 100, and forced through a network of air ducts by circulation fan 118. Based upon a temperature set point at temperature control device 112, a thermostat calls for heating or cooling based on feedback from a temperature sensor within the conditioned space of premise 102. In the case of cooling, the temperature control device 112 signals or requests compressor 122 to turn on, and for circulation fan 118 to circulate cooled air through the ductwork to various points about premise 102. When a temperature set point is reached, temperature control device 112 ceases signaling compressor 122, and eventually fan 118, to run. When the space temperature rises, temperature control device 112 again calls for cool, and the process repeats.
For a single on-off cycle, the time that the compressor is powered and actually runs will generally be referred to as the "run time" and the time that the compressor is not powered, and therefore not running, will generally be referred to as the "off time".
Referring to FIG. 2, a theoretical efficiency versus run time chart for an exemplary
HVAC system is depicted. The vertical axis of the chart represents a range of system energy efficiency ratings (EER) ranging from "Min" for minimum efficiency to "Max" for maximum efficiency. The horizontal axis of the chart represents system run time in minutes. In this depicted example chart, energy efficiency ranges from 0 to 7 EER, while time ranges from 0 to 10 minutes.
Three points, Point A, Point B, and Point C are also depicted on the EER vs. Run Time chart of FIG. 2. At Point A, after 1 minute, the system efficiency rating is 3 EER; at Point B, after running 5 minutes, the system efficiency has improved to 6 EER; and at Point C, after running 9 minutes, which may be considered an optimal amount of time, or Topt, system efficiency is maximized at 7 EER.
Although the depicted EER v. Run Time chart is only an example of performance of a particular, theoretical HVAC system, the chart illustrates the general concept that when a compressor-based HVAC system begins to operate, system efficiency may be rather low, then, after some time has passed, energy efficiency increases non-linearly to its maximum after a period of time.
In the chart depicted in FIG. 2, at time t = 9 minutes, system energy efficiency is maximized. Such a time is referred to as Topt. For the portion of time that HVAC system runs beyond Topt, 9 minutes for the example depicted in the chart of FIG. 2, the system will generally operate at maximum system efficiency. Consequently, in an HVAC system where a compressor is regularly cycled on and off, such as improved-efficiency HVAC system 100 of the present invention, it is generally desirable to size and operate the system such that the system runs for at least a minimum run time Tmin which in some embodiments may be equal to Topt, so as to maximize energy efficiency.
However, in an oversized system, one with excess cooling or heating capacity, or even in a "right-sized" system when temperatures are not extremely hot, the system may run for significantly less time than Topt. ERT device 114 provides a solution for improving the efficiency of such an oversized HVAC system by increasing minimum system run time Tmin to approach Topt.
Referring to FIG. 3, a block diagram of improved-efficiency HVAC system 100 and ERT device 114 is depicted.
In the embodiment depicted, ERT device 114 includes power supply 130, processor 132, memory 134, compressor time-extending switching device 136, circulation fan time-extending switching device 138 and call-for-cool sensing circuit 140.
Power supply 130, receives power from an external power source, such as from FAU
116, and as understood by those skilled in the art, conditions the power to provide an appropriate power to processor 132 and other components of ERT device 114 as needed. In an embodiment, power supply 130 receives a 24V AC power via the POWER and COMMON terminals of FAU 116. In other embodiments, power supply 130 may receive a 120 VAC or other such power as is locally available.
Processor 132 may comprise a central processing unit, microprocessor, microcontroller, microcomputer, or other such known computer processor. Processor 132 is in communication with memory 134, compressor time-extending switching device 136, fan time-extending switching device 138 and call-for-cool sensing circuit 140.
More specifically, processor 132 is in communication with compressor time-extending switching device 136 by way of compressor time-extending relay control line 151; with fan time- extending relay 138 by way of fan time-extending relay control line 152; and with call-for-cool sensing circuit 140 by way of call-for-cool control line 154.
Memory 134, which may be a separate memory device or memory device integrated into processor 132, may comprise various types of volatile memory, including RAM, DRAM, SRAM, and so on, as well as non-volatile memory, including ROM, PROM, EPROM, EEPROM, flash, and so on. Memory 134 may store programs, software, and instructions relating to the operation of ERT device 114. Compressor time-extending switching device 136 comprises an electrically operated switch, which in an embodiment comprises a relay, which may be normally-closed single-pole, double throw relay switch. Compressor time-extending switching device 136 may also comprise other types of switching devices, in addition to any of various types of known relays.
In an embodiment, compressor time-extending switching device 136 comprises a switching device of a load-control switch (LCS). As understood by those skilled-in-the-art, an LCS is used as part of a demand-response (DR) system of an electrical utility. An electrical utility selectively controls power delivery to a device, such as a compressor 122, typically by switching a device, such as a relay or other switch, including switching device 136, on and off as needed to shed load and reduce electrical demand. In an embodiment, ERT 114 components and/or functionality may be integrated into such an LCS. In such an embodiment, the LCS and ERT device 114 may also comprise a communications module for communicating with an electrical utility 104. The communications module may include a receiver, transmitter, antenna, memory, and so on, for data transmission over a local and/or long-haul communications network, such as an RF, paging, AMI, or cellular network.
In an embodiment, compressor time-extending switching device 136 includes first terminal 137a, second terminal 137b, and third terminal 138c. First terminal 137a electrically connects to a terminal of control circuit 150, which in an embodiment comprises a cooling contactor. Second terminal 137b electrically connects to control line COOL to receive the call- for-cool control signal from temperature control device 112. Third terminal 137c is electrically connected to a terminal or an output of power supply 130 via power line POWER.
Compressor time-extending switching device 136 toggles compressor control line COOL' and first terminal 137a between second terminal 137b and call-for-cool line COOL as received from temperature control device 112 via call-for-cool sensing circuit 140, and third terminal 137c and power line POWER as received from FAU 116 and/or temperature control device 112. Compressor time-extending switching device 136 receives, and is driven by, a control signal received from processor 132 via control signal line 151.
Fan time-extending switching device 138, similar to compressor time-extending switching device 136, comprises an electrically operated switch, which in an embodiment comprises a relay, such as a normally-closed single-pole, double throw relay switch. Fan time- extending switching device 138 may also comprise other types of switching devices, in addition to any of various types of known relays.
In an embodiment, fan time-extending switching device 138 includes first terminal 139a, second terminal 139b, and third terminal 139c. First terminal 139a electrically connects to terminal FAN' of FAU 1 16. Second terminal 139b electrically connects to control line FAN to receive the call-for-fan control signal from temperature control device 112. Third terminal 139c is electrically connected to a terminal or an output of power supply 130 via power line POWER.
Fan time-extending switching device 138 toggles first terminal 139a and control line FAN' between second terminal 139b and call-for-fan line FAN as received from temperature control device 112, and third terminal 139c and a power line POWER as received from FAU 116 and/or temperature control device 112. Fan time-extending switching device 138 is driven by a fan control signal received from processor 132 via control signal line 152.
In an alternate embodiment, ERT device 114 may not include a fan time-extending switching device 138, and rather relies on programming within temperature control device 112 to control fan operation.
Call-for-cool sensing circuit 140 in an embodiment comprises a trigger sense circuit, such as a Schmitt trigger. Call-for-cool circuit 140 senses the presence or absence of a call-for-cool control signal at line COOL as provided by temperature control device 112. In an embodiment, call-for-cool sense circuit is a trigger sense circuit sampling the call-for-cool control line COOL on a periodic basis to determine whether temperature control device 112 is calling for compressor 122 to operate so as to cool premise 102. As described above, temperature control device 112 may utilize a 24V AC control logic such that call-for-cool control line COOL goes "high" to 24V AC when temperature control device 112 calls for cool, and "low" or ground/common when not calling for cool. Call-for-cool sensing circuit 140 regularly samples signal COOL such that processor 132 can determine when temperature control device 112 is calling for cool, i.e., for compressor 122 to run.
As depicted in FIG. 3, compressor time-extending switching device 136 and fan time- extending switch 138 hold switch positions such that compressor 122 is in electrical communication with the COOL output (call-for-cool signal) at temperature control device 112 through control circuit 150, and forced air unit 116 and its circulation fan 118 are electrically connected to call-for-fan terminal FAN (call-for-fan signal) at temperature control device 112. In such a configuration, ERT device 114 allows temperature control device 112 to control compressor 122 and circulation fan 118.
Therefore, with switching devices 136 and 138 configured as shown, in operation, when temperature control device 112 senses that a space temperature of premise 102 has fallen below a set point temperature, temperature control device 112 outputs a "high" control voltage at terminals COOL and FAN, which are received, respectively, by control circuit 150 of outdoor unit 120 and circulation fan 118 of forced air unit 116. Consequently, control circuit 150 upon receiving the call-for-cool signal from temperature control device 112 switches line voltage on to compressor 122. In an embodiment, control circuit 150 is a contactor relay or other similar switch that switches line voltage on and off compressor 122 based on a received control signal, such as COOL'. The contactor may be one of many known contactors or other known controlling devices for switching the power of compressor 122, wherein compressor 122 may be an air-conditioning compressor, heat pump, or other such generally high-current-load device of a heating or cooling circuit. Control circuit 150 may operate on alternating current (AC) or direct current (DC), and at a control circuit voltage appropriate for the particular control circuit, such as 24V AC.
Line voltage providing power to compressor 122 may be any of known voltages available to compressor 122. In the United States, in a residential application, line voltage is often 240 VAC.
Although system 100 is depicted as switching compressor 122 on and off via control circuit 150, in other embodiments, other switching configurations may be utilized. In one such alternate embodiment, ERT device 114 outputs line voltage for use by compressor 122.
Further, it will be understood that wherein compressor 122 provides heat for a system 100 that may comprise a heat pump, operation is generally the same, except that a call for heat is substituted for a call for cool.
While temperature control device 112 calls for cool via terminal COOL, and generally for fan via terminal FAN, call-for-cool sensing circuit 140 monitors call-for-cool line COOL and provides data to processor 132. In an embodiment, call-for-cool sensing circuit 140 continuously samples COOL at a predetermined rate. In one embodiment, the sampling frequency or rate is one sample every ½ second. If greater accuracy is desired, the sampling rate may be decreased, and for lesser accuracy, the sampling rate increased.
Processor 132 receives a signal representing call-for-cool data from call-for-cool sensing circuit 140 at control line 154 and determines the time period that temperature control device 112 calls for cool, or requested compressor "run time" for each on and off cycle. As described further below with respect to FIG. 5, processor 132 then determines whether to allow compressor 122 to be turned off when temperature control device 112 stops calling for cool (generally at a point when the space temperature is at or below the desired temperature set point in the case of cooling), or to extend the run time of compressor 122, and in some embodiments the run time of circulation fan 118, thereby increasing efficiency of system 100 and compressor 122.
Referring to FIG. 4, if processor 132 determines that a requested run time of compressor 122 and/or fan 118 should be extended, when call-for-cool signal COOL as provided by terminal COOL of temperature control device 112 stops calling for cool, which in an embodiment means switching from a high control voltage of 24V AC to low control voltage, processor 132 delivers a control signal to compressor time-extending switching device 136 via line 151, causing switching device 136 to switch.
More specifically, compressor time-extending switching device 136 switches such that first terminal 137a no longer is connected to second terminal 137b, but rather, is connected to third terminal 137c. As such, call-for-cool line COOL', which controls operation of compressor 122, switches from COOL to POWER. Consequently, when temperature control device 112 stops calling for cool and reduces the control voltage at COOL to low, processor 132 causes relay 136 to connect compressor call-for-cool line COOL' to a constant logic high source, POWER. This constant logic high source may be considered a "proxy" call-for-cool signal in that the signal received at call-for-cool line COOL' is electrically equivalent, or substantially similar, to the call-for-cool signal output from temperature control device 112. The result is that compressor 122 continues to receive a control signal indicating that control circuit 150 should continue to power compressor 122 even after temperature control device 112 stops calling for cool.
Similarly, processor 132 may also extend the operation of circulation fan 118.
In most HVAC systems, a circulation fan operates for a period of time after the compressor is turned off. During this incremental period of time that the fan runs and the compressor does not, air is circulated over the evaporator coils of the system, providing some additional cooling/heating effect, and also lowering humidity levels of the circulated air. To maintain this "normal" operation of the fan running for a period of time after the compressor is turned off, system 100 of the present invention also extends operation of circulation fan 118 beyond the time that compressor 122 is turned off.
As described above, during normal operation, temperature control device 112 will generally call for circulation fan 118 to operate while compressor 122 is operating. As such, when temperature control device 112 calls for cool, it also generally calls for fan 118 to run. If processor 132 extends operation of compressor 122, in an embodiment, it also extends operation of circulation fan 118. Similar to the operation of compressor time-extending switching device 136, processor 132 provides a control signal via fan control signal line 152 to fan time-extending switching device 138 causing relay 138 to switch call-for-fan control line FAN' (first terminal 139a) from FAN (second terminal 139b) to POWER (third terminal 139c). Consequently, even though temperature control device 112 stops calling for fan, forced air unit 116 and its circulation fan 118 continue to receive a call for fan via fan time-extending switching device 138.
In an embodiment, processor 132 extends the operation of circulation fan 118 whenever processor 132 extends the operation of compressor 122. In such an embodiment, the duration of the extended call-for-fan time period may be equal to or greater than the duration of the extended call-for-cool time period. In another embodiment, operation of circulation fan 118 may be extended independent of any extension of the operation of compressor 122.
In climates having low humidity and high heat, it may be especially beneficial to extend operation of fan 118 to obtain additional cooling benefits, and to remove condensate from evaporator coils. Referring also to FIG. 2, the objective of extending the total run time of compressor 122 and circulation fan 118 is to operate these components of improved-efficiency FJVAC system 100 for a period of time that improves system efficiency. For example, if HVAC system 100 was operating at point A on the chart of FIG. 2 (Run Time of 1 minute and EER of 3), perhaps due to oversizing of the system, ERT device 114 may cause a minimum run time Tmin of system 100, by way of compressor 122 and generally fan 118, to be increased such that system 100 operates at Point B (minimum run time of 5 minutes, EER of 6) or at Point C (minimum run time of 9 minutes, which is equal to Topt, EER at maximum of 7).
As described further below, ERT device 114 may increase or extend run time to force system 100 to operate at maximum efficiency, for example, at Point C, or at other points less than maximum efficiency, for example, Point B. Such an extension of the run time may be brought about by gradual increases in run time until a desire run time is achieved. Further, if ERT device 114 detects that temperature control device 112 already is operating for a period of time as requested by temperature control device 112 and above a minimum run time, such as Topt, ERT device 114 may not extend the run time further.
In an embodiment, minimum run time, Tmin, is simply the predetermined total amount of time that compressor 122 and HVAC system 100 needs to run in a single on/off cycle in order to operate at maximum system efficiency. In another embodiment, minimum run time is less than the amount of time that compressor 122 and HVAC system 100 needs to run in order to operate at maximum system efficiency. In other words, for a single cycle, compressor 122 runs for a period of time that is less than that which would result in optimum efficiency, but still improves system efficiency.
Referring to FIG. 5, a flowchart depicting the steps for determining and implementing an extended system run time is depicted. More specifically, the flowchart of FIG. 5 depicts the steps for extending system run time for a cooling system over a single operating cycle (one run time period followed by an off time period). It will be understood that these steps may also apply to a heating system. In such a method, a "call for heat" control signal, rather than a call for cool control signal may be implemented, with temperature control device 112 calling for heat when a space temperature falls below a predetermined set point, rather than above.
At step 170, temperature control device 112 monitors a space temperature of premise
102.
At step 172, if a measured space temperature is above a predetermined temperature set point, at step 174, temperature control device 112 outputs a call-for-cool control signal. It will be understood that temperature control device 112 may be programmed or otherwise configured to allow a space temperature to rise by a predetermined amount above the desired temperature set point so as to prevent frequent cycling of HVAC system 100. For example, despite a temperature set point of 72°F, the space temperature may be allowed to rise to 72.5°F or 73°F, before temperature control device 112 calls for cool.
At step 172, if the measured space temperature is at or below the predetermined temperature set point, temperature control device 112 continues to monitor the space temperature at step 170.
At step 174, temperature control device 112 outputs a call-for-cool control signal. Referring also to FIG. 3, in an embodiment, temperature control device 112 outputs a 24 VAC control signal (call-for-cool control signal) at terminal COOL of temperature control device 112, which is received by ERT device 114 at call-for-cool sensing circuit 140. Alternatively, in an HVAC system 100 that provided heat via compressor 122, temperature control device 112 would similarly output a call-for-heat control signal which would be received by a call-for-heat sensing circuit 140 of ERT device 114.
In an embodiment, temperature control device 112 also outputs a call-for-fan control signal. One such embodiment is depicted in FIG. 3, wherein temperature control device 112 outputs a call-for-fan control signal of 24V AC at terminal FAN, which is then received by ERT device 114 at fan time-extending switching device 138, and conveyed to FAU 116.
At step 176, and as described above with respect to FIG. 3, the call-for-cool control signal results in power being applied to compressor 122, such that compressor 122 begins to run. In an embodiment such as one depicted in FIG. 3, the call for cool is conveyed to control circuit 150, which causes a relay within control circuit 150 to connect line voltage to compressor 122, causing it to begin running.
Further, the call-for-fan control signal is received at FAU 116, which causes circulation fan 118 to begin to operate, and circulate air cooled by compressor 122 through system 100. At step 178, ERT device 114 monitors the call-for-cool control signal output by temperature control device 112. In an embodiment, call-for-cool sensing circuit 140 samples the call-for-cool signal output to determine whether the call-for-cool control signal is "high" or "low", or in other words, whether temperature control device 112 is calling for cool. In one such embodiment, and as described above, call-for-cool sense circuit samples the voltage at signal line COOL (equivalent to terminal COOL of temperature control device 112) at a predetermined frequency. Call-for-cool sensing circuit 140 transmits over line 154 sampled data or data representative of the sampled data to processor 132.
Processor 132 receives the sampled data representing the call-for-cool control signal. Processor 132 uses the call-for-cool control signal data to determine how long temperature control device 112 has been calling or requesting cool, and hence how long compressor 122 has been running. Such a calculation may be calculated and updated continuously such that a new compressor run time is calculated with each new data sample received, or a single compressor run time may be calculated when temperature control device 112 ceases to call for cool.
At step 180, temperature control device 112 ceases to call for cool. Generally, this is a result of a space temperature reaching a desired temperature set point, such compressor 122 would normally be turned off.
At step 182, temperature control device 112 determines the period of time that temperature control device 112 was calling for cool, the requested compressor run time TREQ. For example, if temperature control device 112 called for cool such that call-for-cool control signal line COOL was at 24V AC for 5 minutes, then stopped calling for cool such that COOL dropped to 0VAC, processor 132 would determine based upon sampled data received from call- for-cool sensing circuit 140, that requested compressor run time TREQ was 5 minutes.
In an embodiment, a single occurrence of a change in control voltage from high to low at signal line COOL will identify an end of the time period TREQ. In another embodiment, a change in control voltage must be sustained for a minimum period of time, or sampling periods.
After determining the requested compressor run time TREQ at step 182, processor 132 compares TREQ to a predetermined desired run time TMIN at step 184. If TREQ is not less than a predetermined desired run time TMIN, i.e., is equal to or greater than TMIN, power is removed from compressor 122 at step 188, and temperature control device 112 continues to monitor the space temperature of premise 102 at step 170. In such a condition, namely, when TREQ is equal to or greater than TMIN, compressor 122 and system 100 is operating at a sufficient efficiency level such that no intervention in the form of an extended run time, is required. If at step 184 processor 132 determines that TREQ is less than a predetermined desired run time TMIN, then control of compressor 122 and fan 1 18 is switched over to ERT device 1 14 at step 186.
At step 190 power to compressor 122 and fan 1 18 is maintained, causing compressor 122 and fan 1 18 to continue running, thereby extending the run time of compressor 122 and fan 1 18. The additional run time above the requested run time TREQ is defined as extended run time ΤΕχτ, such that a total run time Τχοτ is the sum of TREQ and ΤΕχτ. Generally, Τχοτ will be equal to TMIN-
The additional extended run time TEXT may be different for compressor 122 and fan 1 18. In an embodiment, fan 1 18 continues to run after power is removed from compressor 122. In such an embodiment, fan 1 18 TEXT is greater than compressor 122 TEXT. Extending the run time for either compressor 122 or fan 1 18 is described above with respect to FIGS. 3 and 4.
At step 192, at the end of the extended run time period ΤΕχτ, control of compressor 122 and fan 1 18 is returned to temperature control device 1 12. As described above with respect to FIGS. 3 and 4, in an embodiment, this step is accomplished when processor 132 causes compressor time-extending switching device 136 to connect compressor control line COOL' to temperature control device 1 12 output COOL, and when processor 132 causes fan time- extending switching device 138 to connect control line FAN' to temperature control device 1 12 output FAN. In such an embodiment, temperature control device 1 12 then controls operation of compressor 122 and circulation fan 1 18.
In the case of a cooling system 100, when control is turned over to temperature control device 1 12 at the end of the extend run time period TEXT, temperature control device 1 12 will generally not be calling for cool or fan because compressor 122 and fan 1 18 have been operating. In such a case, a control voltage at COOL' and FAN', as output from temperature control device 1 12, will be low, and power to compressor 122 and fan 1 18 will be removed.
Subsequently, temperature control device 1 12 will continue to monitor the space temperature of premise 102 at step 170, and the cycle begins again.
With respect to the duration of extended time period ΤΕχτ, in an embodiment, ΤΕχτ is simply as follows:
EQN 1 : TEXT = TMIN - TREQ
In such an embodiment, processor 132 dynamically determines ΤΕχτ based on the previous operating cycle, or a combination of previous operating cycles, such that compressor 122 and/or fan 1 18 always runs for at least the predetermined minimum time period TMIN- AS described above, TMIN may be selected based on an overall desired efficiency of system 100, or compressor 122. If optimum efficiency is desired, TMIN will generally be equal to Τ0ρτ·
Referring again to FIG. 2, in an embodiment, an HVAC system 100 has a maximum energy efficiency rating of 7 at a run time equal 9 minutes. The run time of 9 minutes is defined as the optimal run time TOPT. If system 100 is oversized with respect to premise 102 such that system 100 and compressor 122 generally run less than the optimal run time TOPT of 9 minutes, then the run time is extended using ERT device 1 14.
In such an embodiment, a predetermined minimum run time TMIN may be set equal to TOPT, or 9 minutes, such that system 100 operates at Point C as depicted in FIG. 2. Alternatively, TMIN may be set to another run time less than TOPT, which in an embodiment is 5 minutes, corresponding to Point B in FIG. 2, and having an EER of 6. As such, TMIN may be a predetermined time period that causes compressor 122 to operate anywhere along the EER vs. run time curve, thusly improving the efficiency of system 100 and compressor 122 in any increment.
Forcing compressor 122 and circulation fan 1 18 to operate longer than requested by temperature control device 1 12 not only improves system 100 efficiency, but also improves humidity control and air mixing by allowing fan 1 18 to operate for longer periods of time.
However, extending the run time of compressor 122 and circulation fan 1 18 to achieve improved efficiency may cause a space temperature of premise 102 to fall below (cooling) or rise above (heating) a desired temperature set point. Generally, the greater the extended run time TEXT as compared to the requested run time TREQ, the greater the variation in temperature below or above the desired temperature set point. Such temperature variations may become noticeable to a person within premise 102.
To illustrate this relationship, referring again to FIGS. 1 and 2, in an embodiment, an oversized system 100 operates without an ERT device 1 14 at Point A, such that temperature control device 1 12 request that compressor 122 run for only 1 minute every cycle in order to hold a desired temperature set point at a space of premise 102. System 100 efficiency may be improved by extending compressor 122 run time by TEXT to move operation of system 100 along the curve depicted in FIG. 2. If TMIN is set to 9 minutes for maximum system efficiency, ΤΕχτ is equal to 8 minutes, causing compressor 122 to run for 9 minutes total, rather than 1 minute.
However, temperature control device 1 12 requested a 1 minute run time based on the amount of time needed, or cool air volume needed, to cool premise 102 to the desired temperature set point. If system 100 continues to operate for 8 minutes beyond what is required to meet the temperature set point needs, a space temperature of premise 102 will fall well below the desired temperature set point. Some persons may find such temperature swings noticeable and uncomfortable.
One solution is to set a minimum run time TMIN to be less than an optimal run time TOPT. TEXT is still determined based on EQN. 1 above, but will have a shorter duration when TMIN is less than TOPT.
In an embodiment, a user or on-site technician initially sets TMIN to be at TOPT, then adjusts TMIN downward until temperature variations resulting from system 100 turning on and off are acceptable based on user perception.
In another embodiment, other criteria may be used to manually or automatically determine either a minimum run time TMIN or an extended run time TEXT- In one such embodiment, ΤΕχτ may be defined as a multiple of TREQ as follows:
EQN 2: TEXT = M X TREQ,
Wherein "M" is predetermined multiplier used to determine ΤΕχτ·
Alternatively, ΤΕχτ may be capped such that TTOT does not exceed T0PT, so as to maximize efficiency, but minimize temperature variation in premise 102. In such an embodiment, ΤΕχτ may be defined by the following two equations:
EQN. 3 : TEXT = Min (M x TREQ,T0PT - TREQ) for TREQ<T0PT
and
EQN. 4: TEXT = 0 for TREQ > T0PT Theoretical exemplary run time data of an embodiment of system 100 with ERT 1 14 and having a fixed multiplier M and ΤΕχτ calculated per EQNS. 3 and 4, is described in Table 1 below, with all run times in minutes, and based on the exemplary efficiency curve depicted in FIG. 2: Table 1
Figure imgf000021_0001
Table 1 may characterize a range of requested run times TREQ for a single system 100 or compressor 122, that vary with cooling or heating loads. In the embodiment of system 100 with ERT 114 characterized by the theoretical data of Table 1, multiplier M is held constant at 0.5. In such an embodiment, requested run time for a system 100 may change as depicted in Table 1, ranging from 1 minute to 12 minutes. Multiplier M is held constant, regardless of run time. TEXT is determined by processor 132 according to EQNS. 3 and 4. Total run time ΤΤΟτ is increased as shown, and system efficiencies improved.
In an alternate embodiment, multiplier M may be dynamically determined by processor
132 based on measured requested run time TREQ. In one such embodiment, multiplier M varies inversely to requested run time TREQ. In such an embodiment, M is generally larger for shorter requested run times TREQ, and smaller for longer requested run times TREQ. Multiplier M may be associated with a particular range of requested run times TREQ, such as M=2 for requested run times TREQ that are less than 3 minutes; M=l for requested run times TREQ that are equal to or greater than 3 minutes, but less than 5 minutes, and so on. Such an embodiment provides the benefit of increasing total run times Τχοτ for particularly low requested run times TREQ.
Theoretical exemplary run time data of an embodiment of system 100 with ERT 114 and having a dynamic multiplier M and ΤΕχτ calculated per EQNS. 3 and 4, is described in Table 2 below, with all run times in minutes, and based on the exemplary efficiency curve depicted in FIG. 2: Table 2
Figure imgf000022_0001
As depicted in Table 2, multiplier M varies inversely with requested run time TREQ. At a requested run time TREQ of 1 minute, multiplier M is relatively large at M=2, so as to provide a relatively larger extended run time ΤΕχτ. Multiplier M decreases as requested run time TREQ approaches TOPT.
It will be understood that other embodiments of the present invention may include alternate algorithms for determining extended run time TEXT and multiplier M, based upon the principles of extending compressor run time so as to increase efficiency, with minimal temperature variation and possible discomfort at a premise 102.
Although the present invention has been described with respect to the various embodiments, it will be understood that numerous insubstantial changes in configuration, arrangement or appearance of the elements of the present invention can be made without departing from the intended scope of the present invention. Accordingly, it is intended that the scope of the present invention be determined by the claims as set forth.
For purposes of interpreting the claims for the present invention, it is expressly intended that the provisions of Section 1 12, sixth paragraph of 35 U.S.C. are not to be invoked unless the specific terms "means for" or "step for" are recited in a claim.

Claims

WHAT IS CLAIMED IS:
1. An extended run time device for extending the time that a compressor-based heating, ventilating, and air-conditioning (HVAC) system runs so as to increase energy efficiency of the HVAC system, the extended run time device comprising:
a sensing circuit adapted to receive a call-for-cool control signal from a temperature control device and to output a sense signal;
a compressor time-extending switching device having a first terminal, a second terminal, and a third terminal, the first terminal adapted to electrically connect to a control circuit that controls electrical power to a compressor of an HVAC system, the second terminal adapted to receive the call-for-cool control signal, and the third terminal adapted to receive a proxy call-for- cool control signal, the compressor time-extending switching device configured to selectively connect the first terminal to the second terminal, thereby causing the control circuit to receive the call-for-cool control signal, or to connect the first terminal to the third terminal, thereby causing the control circuit to receive the proxy call-for-cool signal; and
a processor in electrical communication with the sensing circuit and the compressor time- extending switching device, the processor adapted to receive the sense signal from the sensing circuit, determine a requested compressor run time based upon the call-for-cool signal, and to transmit a switching control signal to the compressor time-extending switching device, thereby controlling the compressor time-extending switching device;
wherein when the requested compressor run time is less than a predetermined minimum compressor run time, the processor transmits the switching control signal to the compressor time-extending switching device, causing the compressor time-extending switching device to disconnect the first terminal from the second terminal, and to connect the first terminal to the third terminal, thereby causing the control circuit to receive the proxy call-for-cool control signal and to maintain electrical power to the compressor for an extended run time period.
2. The extended run-time device of claim 1, wherein the temperature control device comprises a thermostat.
3. The extended run-time device of claim 1, wherein the sensing circuit samples the call- for-cool control signal at a predetermined sampling frequency to detect the presence or absence of a call-for-cool control voltage.
4. The extended run-time device of claim 1, wherein the call-for-cool control signal comprises a 24V AC control signal.
5. The extended run-time device of claim 1, wherein the sensing circuit comprises a Schmitt trigger sense circuit.
6. The extended run-time device of claim 1, wherein the compressor time-extending switching device comprises a relay.
7. The extended run-time device of claim 1, wherein the proxy call-for-cool signal is supplied by a power supply in electrical communication with the third terminal of the compressor time-extending switching device, and the proxy call-for-cool signal includes substantially the same electrical characteristics as the call-for-cool control signal.
8. The extended run-time device of claim 1, wherein the processor is further configured to determine whether the requested compressor run time is less than a predetermined minimum compressor run time, and to transmit the switching control signal to the compressor time- extending switching device when the compressor run time is less than the predetermined minimum compressor run time.
9. The extended run-time device of claim 1, wherein the extended compressor run time period is substantially equal to the minimum compressor run-time period less the requested compressor run time period.
10. The extended run-time device of claim 1, wherein the extended compressor run time period is a multiple of the requested run time period.
11. The extended run-time device of claim 1, further comprising a fan time-extending switching device in electrical communication with the temperature control device, a circulation fan, and the processor.
12. The extended run-time device of claim 11, wherein the processor controls the fan time- extending switching device so as to extend a requested call-for-fan time period from the temperature control device, thereby causing the circulation fan to continue to run after an expiration of the requested call-for-fan time period.
13. The extended run-time device of claim 11, wherein the control circuit comprises a cooling contactor.
14. The extended run-time device of claim 1, wherein the extended run-time device is integrated into a load-control switch.
15. The extended run-time device of claim 1, wherein the extended run-time device is integrated into a fan-control board of a forced air unit.
16. A method of improving energy efficiency of a heating, ventilating, and air-conditioning (HVAC) system that includes a temperature control device in communication with a compressor, a circulation fan, the method comprising:
monitoring a call-for-cool control signal of a temperature control device, the call-for-cool control signal causing power to be applied to a compressor of an HVAC system for a requested compressor run-time period;
determining the duration of the requested compressor run-time period of the temperature control device; and
causing power to the compressor to be maintained for an extended compressor run-time period when the duration of the requested compressor run time period is less than a predetermined minimum run time period, the extended compressor run time period commencing after an expiration of the requested compressor run time period such that the compressor is powered for a total run time period that is greater than the requested compressor run-time period, thereby increasing an energy efficiency of the HVAC system.
17. The method of claim 16, wherein monitoring a call-for-cool signal comprises sampling a signal line carrying the call-for-cool control signal using a sensing circuit.
18. The method of claim 16, wherein the call-for-cool control signal comprises a 24 VAC control signal transmitted from a terminal of the temperature control device.
19. The method of claim 16, wherein causing power to be applied to a compressor of the HVAC system for a requested compressor run-time period comprises transmitting the call-for- cool control signal to a contactor of the compressor, thereby causing the contactor to connect the compressor to a power source.
20. The method of claim 16, wherein causing power to the compressor to be maintained for an extended run-time period comprises transmitting a proxy call-for-cool control signal to a contactor of the compressor, thereby causing the contactor to maintain a connection of the compressor to a power source.
21. The method of claim 16, further comprising determining the extended compressor runtime period.
22. The method of claim 21, wherein determining the extended run-time period comprises a processor setting the extended run-time period to be substantially equal to the requested run-time period multiplied by a multiplier M.
23. The method of claim 22, wherein the multiplier M is a predetermined, fixed value.
24. The method of claim 22, wherein the multiplier M is dynamically determined based upon the requested compressor run-time period.
25. The method of claim 24, wherein the multiplier M is dynamically determined based upon the requested compressor run-time period and the predetermined minimum compressor run time.
26. The method of claim 16, further comprising causing power to a circulation fan to be maintained for a time period greater than or equal to the extended compressor run-time period, the time period commencing after an expiration of a requested fan run time period, thereby causing the circulation fan to be powered for at least as long as the compressor is powered.
27. An extended run time device for extending the time that a compressor-based heating, ventilating, and air-conditioning (HVAC) system runs so as to increase energy efficiency of the HVAC system, the extended run time device comprising: means for monitoring a call-for-cool control signal of a temperature control device, the call-for-cool control signal causing power to be applied to a compressor of the HVAC system for a requested run-time period;
means for determining the duration of the requested run-time period of the temperature control device; and
means for causing power to the compressor to be maintained for an extended run-time period when the duration of the requested run time period is less than a predetermined minimum run time period, the extended run time period commencing after an expiration of the requested run time period such that the compressor is powered for a total run time period that is greater than the requested run-time period, thereby increasing an energy efficiency of the HVAC system.
28. The extended run-time device of claim 27, wherein the means for monitoring the call-for- cool control signal comprises means for sampling a voltage of a control signal line in electrical communication with the temperature control device.
29. The extended run-time device of claim 27, further comprising means for determining the extended run-time period.
30. The extended run-time device of claim 27, further comprising means for causing power to a circulation fan to be maintained for a time period greater than or equal to the extended compressor run-time period.
31. An improved-efficiency heating, ventilating and air-conditioning (HVAC) system, comprising:
a temperature control device monitoring and controlling a space temperature of a premise and transmitting a call-for-cool control signal;
an outdoor unit receiving the call-for-cool control signal transmitted from the temperature control device, the outdoor unit including a compressor and an electrical contactor for switching power on and off to the compressor; and
an extended run-time device in electrical communication with the thermostat and the outdoor unit, the extended run-time device receiving the call-for-cool control signal and causing the electrical contactor of the outdoor unit to maintain power to the compressor for an extended run-time period after the temperature control device ceases to transmit the call-for-cool control signal.
32. The system of claim 31, further comprising a circulation fan in electrical communication with the temperature control device and the extended run-time device, and wherein the extended run-time device causes the circulation fan to continue operating after the temperature control device ceases to transmit a call-for-fan control signal.
33. The system of claim 31 , wherein the extended run-time device includes:
a compressor extended-time switching device,
a sensing circuit adapted to detect the call-for-cool control signal, a processor controlling the compressor extended-time switching device and receiving a data signal from the sensing circuit;
wherein the processor is configured to determine a thermostat-requested compressor run time based upon a duration of the call-for-cool control signal, compare the thermostat-requested compressor run time with a predetermined minimum compressor run time, and to cause the compressor extended-time switching device to switch from transmitting the call-for-cool control signal to the contactor to transmitting an output of the power supply to the contactor, thereby maintaining power to the compressor for an extended run-time period after the temperature control device ceases to transmit the call-for-cool control signal.
34. The system of claim 33, wherein the output of the power supply comprises substantially the same voltage as the call-for-cool control signal.
35. A load-control switch (LCS) for selectively powering an electrical load of a heating, ventilating, and air-conditioning (HVAC) system and improving the efficiency of the electrical load through extending run-time operation of the load, the LCS comprising:
a transceiver configured to communicate with an electrical utility over a communications network;
an extended run-time (ERT) device in electrical communication with the transceiver, the ERT device including:
a sensing circuit adapted to receive a call-for-cool control signal from the temperature sensing and controlling unit and to output a sense signal;
a compressor time-extending switching device having a first terminal, a second terminal, and a third terminal, the first terminal adapted to electrically connect to a control circuit that controls electrical power to a compressor of an HVAC system, the second terminal adapted to receive the call-for-cool control signal, and the third terminal adapted to receive a proxy call-for-cool control signal, the compressor time-extending switching device configured to selectively connect the first terminal to the second terminal, thereby causing the control circuit to receive the call-for-cool control signal, or to connect the first terminal to the third terminal, thereby causing the control circuit to receive the proxy call-for-cool signal; and
a processor in electrical communication with the sensing circuit and the compressor time-extending switching device, the processor adapted to receive the sense signal from the sensing circuit, determine a requested compressor run time based upon the call-for-cool signal, and to transmit a switching control signal to the compressor time- extending switching device, thereby controlling the compressor time-extending switching device;
wherein when the requested compressor run time is less than a predetermined minimum compressor run time, the processor transmits the switching control signal to the compressor time-extending switching device, causing the compressor time-extending switching device to disconnect the first terminal from the second terminal, and to connect the first terminal to the third terminal, thereby causing the control circuit to receive the proxy call-for-cool control signal and to maintain electrical power to the compressor for an extended run time period.
36. The extended run-time device of claim 35, wherein the sensing circuit samples the call- for-cool control signal at a predetermined sampling frequency to detect the presence or absence of a call-for-cool control voltage.
37. The extended run-time device of claim 35, wherein the sensing circuit comprises a Schmitt trigger sense circuit.
38. The extended run-time device of claim 35, wherein the compressor time-extending switching device comprises a relay.
PCT/US2013/025823 2012-02-28 2013-02-13 Improved efficiency heating, ventilating, and air-conditioning through extended run-time control WO2013130264A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CA2864849A CA2864849C (en) 2012-02-28 2013-02-13 Improved efficiency heating, ventilating, and air-conditioning through extended run-time control

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US13/407,343 US9528717B2 (en) 2012-02-28 2012-02-28 Efficiency heating, ventilating, and air-conditioning through extended run-time control
US13/407,343 2012-02-28

Publications (1)

Publication Number Publication Date
WO2013130264A1 true WO2013130264A1 (en) 2013-09-06

Family

ID=49001351

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2013/025823 WO2013130264A1 (en) 2012-02-28 2013-02-13 Improved efficiency heating, ventilating, and air-conditioning through extended run-time control

Country Status (3)

Country Link
US (1) US9528717B2 (en)
CA (1) CA2864849C (en)
WO (1) WO2013130264A1 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140069131A1 (en) * 2012-09-13 2014-03-13 Mitsubishi Electric Corporation Air conditioning system
US9581350B2 (en) * 2013-10-29 2017-02-28 Lennox Industries Inc. Mixed air temperature sensor bypass
US10024591B2 (en) * 2014-05-15 2018-07-17 Lennox Industries Inc. Sensor failure error handling
US9874366B2 (en) 2014-07-30 2018-01-23 Research Products Corporation System and method for adjusting fractional on-time and cycle time to compensate for weather extremes and meet ventilation requirements
US9991707B2 (en) * 2015-07-24 2018-06-05 Battelle Memorial Institute Aggregate Load Controllers and Associated Methods
EP3356752B1 (en) * 2015-09-30 2021-04-21 Electrolux Home Products, Inc. Temperature control of refrigeration cavities in low ambient temperature conditions
BR112018014946B1 (en) * 2016-01-25 2023-04-18 Bitzer Kühlmaschinenbau Gmbh METHOD TO CONTROL A COMPRESSOR SYSTEM
US10900694B2 (en) * 2018-10-18 2021-01-26 Commercial Energy Saving Plus, LLC Recoverable and renewable heat recovery system and related methods
EP3994780A1 (en) 2019-07-03 2022-05-11 Eaton Intelligent Power Limited Demand response of loads having thermal reserves
CN113485239B (en) * 2021-06-22 2023-06-30 郭恩训 Finger pressing device and control circuit
CN114893921B (en) * 2022-05-24 2023-08-08 青岛海信日立空调系统有限公司 Magnetic suspension water chilling unit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3979059A (en) * 1974-02-12 1976-09-07 James Ralph Davis Systems for controlling the temperature within an enclosure
US4094166A (en) * 1977-03-23 1978-06-13 Electro-Thermal Corporation Air conditioning control system
US4292813A (en) * 1979-03-08 1981-10-06 Whirlpool Corporation Adaptive temperature control system
US4537038A (en) * 1982-04-30 1985-08-27 Alsenz Richard H Method and apparatus for controlling pressure in a single compressor refrigeration system
US5960639A (en) * 1997-01-23 1999-10-05 Intellidyne, Llc Apparatus for regulating compressor cycles to improve air conditioning/refrigeration unit efficiency

Family Cites Families (107)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3558911A (en) 1969-05-29 1971-01-26 Gen Electric Underfrequency relay
US3683343A (en) 1970-07-27 1972-08-08 Stephen Feldman Demand metering system for electric energy
US3780532A (en) * 1971-09-17 1973-12-25 Borg Warner Temperature control system for centrifugal liquid chilling machines
US3993984A (en) 1975-04-08 1976-11-23 Power Management Corporation Electronic underfrequency relay
USD248838S (en) 1976-06-09 1978-08-08 Honeywell Inc. Round thermostat guard
US4190800A (en) 1976-11-22 1980-02-26 Scientific-Atlanta, Inc. Electrical load management system
US4156280A (en) 1976-12-17 1979-05-22 International Business Machines Corporation Utility monitor for detecting and storing power line disturbances
US4130874A (en) 1977-06-13 1978-12-19 Westinghouse Electric Corp. Load management terminal having plural selectable address formats for a power line communication system
US4228511A (en) 1978-10-06 1980-10-14 General Electric Company System and method of power demand limiting and temperature control
JPS55127821A (en) 1979-03-27 1980-10-03 Tokyo Shibaura Electric Co Digital protection relay unit
US4341345A (en) 1980-02-19 1982-07-27 Honeywell Inc. Method and apparatus for power load shedding
US4345162A (en) 1980-06-30 1982-08-17 Honeywell Inc. Method and apparatus for power load shedding
US4297852A (en) * 1980-07-17 1981-11-03 General Electric Company Refrigerator defrost control with control of time interval between defrost cycles
US4390876A (en) 1980-07-25 1983-06-28 Southern California Edison Co., Inc. Electric utility demand limiting device and method
USD270815S (en) 1981-05-06 1983-10-04 Honeywell Inc. Clock thermostat
US4551812A (en) 1981-06-17 1985-11-05 Cyborex Laboratories, Inc. Energy controller and method for dynamic allocation of priorities of controlled load curtailment to ensure adequate load sharing
US4464724A (en) 1981-06-17 1984-08-07 Cyborex Laboratories, Inc. System and method for optimizing power shed/restore operations
US4583090A (en) 1981-10-16 1986-04-15 American Diversified Capital Corporation Data communication system
US4389577A (en) 1982-04-14 1983-06-21 Honeywell Inc. Apparatus for power load-shedding with auxiliary commandable thermostat
US4415943A (en) 1982-04-21 1983-11-15 Tii Industries, Inc. Equipment protector and energy saving apparatus
JPH0619666B2 (en) 1983-06-30 1994-03-16 富士通株式会社 Failure diagnosis processing method
US4620283A (en) 1983-11-29 1986-10-28 Lehigh University Programmable load controller
US4672501A (en) 1984-06-29 1987-06-09 General Electric Company Circuit breaker and protective relay unit
US4780910A (en) 1984-12-12 1988-10-25 Scientific-Atlanta, Inc. Display for a remote receiver in an electrical utility load management system
US5099348A (en) 1984-12-12 1992-03-24 Scientific-Atlanta, Inc. Display for remote receiver in a utility management system
US4657179A (en) 1984-12-26 1987-04-14 Honeywell Inc. Distributed environmental/load control system
US4804938A (en) 1986-10-24 1989-02-14 Sangamo Weston, Inc. Distribution energy management system
US4819180A (en) 1987-02-13 1989-04-04 Dencor Energy Cost Controls, Inc. Variable-limit demand controller for metering electrical energy
US5426620A (en) 1987-03-23 1995-06-20 Budney; Stanley M. Method for controlling and managing load demand
US5687139A (en) 1987-03-23 1997-11-11 Budney; Stanley M. Electrical load optimization device
US4808803A (en) 1987-08-24 1989-02-28 Figgi International, Inc. Security system
US4902964A (en) 1987-09-21 1990-02-20 Landis & Gyr Metering, Inc. Program clock for an electronic demand register with automatic calibration based on sensed line frequency
AU3150493A (en) 1989-09-07 1994-06-22 Lexington Power Management Corporation Subscriber electric power load control system
US5218552A (en) 1990-07-30 1993-06-08 Smart House, L.P. Control apparatus for use in a dwelling
US5414640A (en) 1991-07-05 1995-05-09 Johnson Service Company Method and apparatus for adaptive demand limiting electric consumption through load shedding
US5319296A (en) 1991-11-04 1994-06-07 Boeing Commercial Airplane Group Oscillatory servo-valve monitor
US6208905B1 (en) 1991-12-20 2001-03-27 Honeywell International Inc. System and method for controlling conditions in a space
US5203497A (en) 1991-12-20 1993-04-20 Honeywell Inc. Communicating thermostat
US5197668A (en) 1991-12-20 1993-03-30 Honeywell Inc. Communicating thermostat
US5761083A (en) 1992-03-25 1998-06-02 Brown, Jr.; Robert J. Energy management and home automation system
US5209076A (en) * 1992-06-05 1993-05-11 Izon, Inc. Control system for preventing compressor damage in a refrigeration system
US5576700A (en) 1992-08-26 1996-11-19 Scientific-Atlanta Apparatus and method for controlling an electrical load and monitoring control operations and the electrical load
US5343384A (en) 1992-10-13 1994-08-30 Ingersoll-Rand Company Method and apparatus for controlling a system of compressors to achieve load sharing
US5475609A (en) 1993-03-05 1995-12-12 Square D Company Load interrupter system
US5355686A (en) * 1993-08-11 1994-10-18 Micro Weiss Electronics, Inc. Dual temperature control of refrigerator-freezer
US5519622A (en) 1993-10-18 1996-05-21 Chasek; Norman E. Real time, economic-impact display system for consumers of commoditized electric power
US5462225A (en) 1994-02-04 1995-10-31 Scientific-Atlanta, Inc. Apparatus and method for controlling distribution of electrical energy to a space conditioning load
US5479785A (en) * 1994-02-08 1996-01-02 Paragon Electric Company, Inc. Electronic defrost controller with fan delay and drip time modes
US5675503A (en) 1994-04-19 1997-10-07 Denver Energy Cost Controls, Inc. Adaptive load cycler for controlled reduction of energy use
US6377874B1 (en) 1994-09-07 2002-04-23 Spd Technologies Inc. Power distribution system including integrated power node control center
US6574581B1 (en) 1994-10-25 2003-06-03 Honeywell International Inc. Profile based method for deriving a temperature setpoint using a ‘delta’ based on cross-indexing a received price-point level signal
US5640153A (en) 1994-12-02 1997-06-17 Excel Energy Technologies, Ltd. Energy utilization controller and control system and method
US5572438A (en) 1995-01-05 1996-11-05 Teco Energy Management Services Engery management and building automation system
US5619121A (en) 1995-06-29 1997-04-08 Siemens Energy & Automation, Inc. Load voltage based tap changer monitoring system
US5579700A (en) 1995-08-07 1996-12-03 Enpac Corporation Interlocking spill pallet system
AU707660B2 (en) 1996-04-01 1999-07-15 Cic Global Llc Distributed frequency relay
US5971598A (en) 1996-06-07 1999-10-26 Puretan International, Inc. Wireless remote controlled tanning system
US6029092A (en) 1996-11-21 2000-02-22 Intellinet, Inc. System and method for providing modular control and for managing energy consumption
US6167389A (en) 1996-12-23 2000-12-26 Comverge Technologies, Inc. Method and apparatus using distributed intelligence for applying real time pricing and time of use rates in wide area network including a headend and subscriber
US5986574A (en) 1997-10-16 1999-11-16 Peco Energy Company System and method for communication between remote locations
US6157874A (en) 1997-10-31 2000-12-05 Basic Resources, Inc. Power control systems and processes
US6181985B1 (en) 1998-04-29 2001-01-30 The Detroit Edison Company Rate-based load shed module
US5936817A (en) 1998-05-11 1999-08-10 Eaton Corporation Electrical switching apparatus employing a circuit for selectively enabling and disabling a close actuator mechanism
US6122603A (en) 1998-05-29 2000-09-19 Powerweb, Inc. Multi-utility energy control system with dashboard
US6098893A (en) 1998-10-22 2000-08-08 Honeywell Inc. Comfort control system incorporating weather forecast data and a method for operating such a system
US6496342B1 (en) 1999-02-12 2002-12-17 Bitronics Inc. Distributed monitoring and protection system for a distributed power network
US6747571B2 (en) 1999-03-08 2004-06-08 Comverge Technologies, Inc. Utility meter interface system
US6356426B1 (en) 1999-07-19 2002-03-12 General Electric Company Residential circuit breaker with selectable current setting, load control and power line carrier signaling
US6254009B1 (en) 1999-12-08 2001-07-03 Carrier Corporation Communicating thermostat
WO2001052478A2 (en) 2000-01-07 2001-07-19 Invensys Controls Plc Building control
US20020138176A1 (en) 2000-02-01 2002-09-26 Patrick Davis Automated aggregation and management of distributed electric load reduction
US6891478B2 (en) 2000-06-09 2005-05-10 Jay Warren Gardner Methods and apparatus for controlling electric appliances during reduced power conditions
US6264110B1 (en) 2000-06-15 2001-07-24 Carrier Corporation Setback reporting thermostat
US6305611B1 (en) 2000-06-15 2001-10-23 Carrier Corporation Setback tracking thermostat
US6519509B1 (en) 2000-06-22 2003-02-11 Stonewater Software, Inc. System and method for monitoring and controlling energy distribution
US6836737B2 (en) 2000-08-09 2004-12-28 Statsignal Systems, Inc. Systems and methods for providing remote monitoring of consumption for a utility meter
US6587739B1 (en) 2000-09-29 2003-07-01 Sunbeam Products, Inc. Appliance communication and control system and appliances for use in same
US6480803B1 (en) 2000-12-22 2002-11-12 Carrier Corporation Load shedding thermostat
US20020084655A1 (en) 2000-12-29 2002-07-04 Abb Research Ltd. System, method and computer program product for enhancing commercial value of electrical power produced from a renewable energy power production facility
US20020103655A1 (en) 2001-01-30 2002-08-01 International Business Machines Corporation Method for a utility providing electricity via class of service
US6828695B1 (en) 2001-04-09 2004-12-07 Rick L. Hansen System, apparatus and method for energy distribution monitoring and control and information transmission
US6816350B1 (en) 2001-05-15 2004-11-09 Illinois Tool Works Inc. AC voltage protection circuit
US7136725B1 (en) 2001-06-21 2006-11-14 Paciorek Ronald R Load shed notification method, product, and apparatus
US6671586B2 (en) 2001-08-15 2003-12-30 Statsignal Systems, Inc. System and method for controlling power demand over an integrated wireless network
US6741915B2 (en) 2001-08-22 2004-05-25 Mmi Controls, Ltd. Usage monitoring HVAC control system
US6745106B2 (en) 2001-09-04 2004-06-01 Emware, Inc. Tone generating electronic device with paging module for verification of energy curtailment
US6634566B2 (en) 2002-02-12 2003-10-21 Carrier Corporation Advanced setback reporting thermostat
US6789739B2 (en) 2002-02-13 2004-09-14 Howard Rosen Thermostat system with location data
JP3913127B2 (en) 2002-06-27 2007-05-09 富士通株式会社 Electronic document system, electronic document management apparatus, computer program, and recording medium
US6806446B1 (en) 2002-10-04 2004-10-19 Stephen D. Neale Power management controls for electric appliances
US6622926B1 (en) 2002-10-16 2003-09-23 Emerson Electric Co. Thermostat with air conditioning load management feature
US6975926B2 (en) 2002-11-08 2005-12-13 Usa Technologies, Inc. Method and apparatus for power management control of a compressor-based appliance that reduces electrical power consumption of an appliance
US7355301B2 (en) 2003-02-26 2008-04-08 Cannon Technologies, Inc. Load control receiver with line under voltage and line under frequency detection and load shedding
KR100565486B1 (en) 2003-06-11 2006-03-30 엘지전자 주식회사 Air conditioner's central controlling system and its operating method
US7010363B2 (en) 2003-06-13 2006-03-07 Battelle Memorial Institute Electrical appliance energy consumption control methods and electrical energy consumption systems
KR100529907B1 (en) 2003-06-19 2005-11-22 엘지전자 주식회사 Air conditioner's central controlling system and its operating method
US7242114B1 (en) 2003-07-08 2007-07-10 Cannon Technologies, Inc. Thermostat device with line under frequency detection and load shedding capability
US7702424B2 (en) 2003-08-20 2010-04-20 Cannon Technologies, Inc. Utility load control management communications protocol
US7177728B2 (en) 2003-12-30 2007-02-13 Jay Warren Gardner System and methods for maintaining power usage within a set allocation
US7172132B2 (en) 2004-08-05 2007-02-06 Carrier Corporation Balanced utility load management
US7424343B2 (en) 2004-08-11 2008-09-09 Lawrence Kates Method and apparatus for load reduction in an electric power system
CA2589959C (en) 2004-12-14 2010-05-04 Comverge Inc. Hvac communication system
US7364093B2 (en) 2005-06-20 2008-04-29 Emerson Electric Co. Thermostat having default curtailment temperature settings
US7434742B2 (en) 2005-06-20 2008-10-14 Emerson Electric Co. Thermostat capable of displaying received information
US7528503B2 (en) 2005-07-22 2009-05-05 Cannon Technologies, Inc. Load shedding control for cycled or variable load appliances
US7292114B2 (en) 2005-08-01 2007-11-06 Marvell World Trade Ltd. Low-noise high-stability crystal oscillator
CA2856280C (en) 2011-11-18 2020-01-28 Cooper Technologies Company Improved efficiency heating, ventilating, and air conditioning through indirect extension of compressor run times

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3979059A (en) * 1974-02-12 1976-09-07 James Ralph Davis Systems for controlling the temperature within an enclosure
US4094166A (en) * 1977-03-23 1978-06-13 Electro-Thermal Corporation Air conditioning control system
US4292813A (en) * 1979-03-08 1981-10-06 Whirlpool Corporation Adaptive temperature control system
US4537038A (en) * 1982-04-30 1985-08-27 Alsenz Richard H Method and apparatus for controlling pressure in a single compressor refrigeration system
US5960639A (en) * 1997-01-23 1999-10-05 Intellidyne, Llc Apparatus for regulating compressor cycles to improve air conditioning/refrigeration unit efficiency

Also Published As

Publication number Publication date
US20130219931A1 (en) 2013-08-29
US9528717B2 (en) 2016-12-27
CA2864849C (en) 2019-08-27
CA2864849A1 (en) 2013-09-06

Similar Documents

Publication Publication Date Title
CA2864849C (en) Improved efficiency heating, ventilating, and air-conditioning through extended run-time control
US20210071925A1 (en) Efficiency heating, ventilating, and air conditioning through indirect extension of compressor run times
CA2808788C (en) Utility-driven energy-load management with adaptive fan control during load-control events
US10971949B2 (en) Systems and methods for performing building energy management
CN103512155B (en) A kind of air conditioning control method and Controlling System
EP1698834B1 (en) Power load control system and control method for multi-unit air conditioners
US8943845B2 (en) Window air conditioner demand supply management response
CN105393182B (en) Controller for automatic control of cyclically operating HAVC and R devices and system and method using the same
KR20160042809A (en) System and apparatus for integrated hvacr and other energy efficiency and demand response
AU2014329873B2 (en) IR translator providing demand-control for ductless split HVAC systems
US20120086273A1 (en) Dynamic thermostatic control of small-scale electrical loads for matching variations in electric utility supply
JP2009254219A (en) Power control apparatus and program
KR102199139B1 (en) Apparatus and method for controlling an air conditioner, air conditioning system
KR101991561B1 (en) Method and apparatus for controlling air conditioning system
WO2021214858A1 (en) Air conditioner and management device
AU2013101086A4 (en) Air conditioning system and method of control in heat mode
JP6071474B2 (en) Air conditioning equipment
CN202101372U (en) Double-compressor refrigerating system and energy-saving optimizer thereof
CN113757940B (en) Control system, adjusting method, device, equipment and storage medium of fixed-frequency air conditioner
AU2013101085A4 (en) System and method for over heat protection of an air conditioning system
JP2019002604A (en) Air-conditioning control system
CN211739423U (en) Energy efficiency deviation rectifying control device and system suitable for public building electromechanical system
CN110762807A (en) Energy-saving control method of triple-constant air conditioning system
JP2024014347A (en) Air conditioners and air conditioning systems
WO2016064780A1 (en) Method for demand control of duty cycled hvac&amp;r equipment, and controllers and systems for same

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13755042

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2864849

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13755042

Country of ref document: EP

Kind code of ref document: A1