WO2010145088A1 - Method and system for supplying power to optical network unit - Google Patents

Method and system for supplying power to optical network unit Download PDF

Info

Publication number
WO2010145088A1
WO2010145088A1 PCT/CN2009/073246 CN2009073246W WO2010145088A1 WO 2010145088 A1 WO2010145088 A1 WO 2010145088A1 CN 2009073246 W CN2009073246 W CN 2009073246W WO 2010145088 A1 WO2010145088 A1 WO 2010145088A1
Authority
WO
WIPO (PCT)
Prior art keywords
control information
result
control
processor
controller
Prior art date
Application number
PCT/CN2009/073246
Other languages
French (fr)
Chinese (zh)
Inventor
侯明鑫
Original Assignee
中兴通讯股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中兴通讯股份有限公司 filed Critical 中兴通讯股份有限公司
Publication of WO2010145088A1 publication Critical patent/WO2010145088A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • H04Q11/0067Provisions for optical access or distribution networks, e.g. Gigabit Ethernet Passive Optical Network (GE-PON), ATM-based Passive Optical Network (A-PON), PON-Ring
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B10/00Transmission systems employing electromagnetic waves other than radio-waves, e.g. infrared, visible or ultraviolet light, or employing corpuscular radiation, e.g. quantum communication
    • H04B10/80Optical aspects relating to the use of optical transmission for specific applications, not provided for in groups H04B10/03 - H04B10/70, e.g. optical power feeding or optical transmission through water
    • H04B10/806Arrangements for feeding power
    • H04B10/808Electrical power feeding of an optical transmission system
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • H04Q2011/0079Operation or maintenance aspects
    • H04Q2011/0081Fault tolerance; Redundancy; Recovery; Reconfigurability

Definitions

  • qJ (Op ca ewok ) is T-T .44, using one of the following methods, namely 4 Control, Ben and Light.
  • each of the O is made by the sheep's P (Powe o ce ). In the existing wood, each one is a function. T -T .44 of 1
  • each supplier provides each, and each use and supply.
  • Method including at least
  • the upper ones include the ones that will be in the solid.
  • the scheme for the source connected to the result includes analysis of the results of the mining to see if it exists and
  • the result is the control of the source connected to .
  • the upper control includes whether, if, and under power, under and below.
  • the scheme generates control information, and the control information includes the accepted optical address.
  • the above-mentioned processor is close to the result analysis to see if it exists, and the result is connected to the control of the multi-source source.
  • the above control includes whether, whether, or not,
  • the above system including the controller, its control information,
  • the upper control information includes the accepted optical address
  • the processor near the scheme generates control information
  • control information includes the accepted optical address
  • the near control information is directed to .
  • results of the analysis of the present invention determine the source, and other fine control parameters, and can
  • This method is combined with the method of rest.
  • This paper proposes the same system, the way, 2, including the connection, that is, or above, in this method, there are, 2.
  • This mode includes the router, the road used for the result
  • 5 processor is used to connect the result to multiple sources
  • the program is much closer to the root plan.
  • the result is near the result, and the result is connected to the control of the multi-source source of 0, where the result includes the result.
  • Controls include whether, if, or under power, and . To whether or not there is.
  • the method may include a controller, and the controller generates control information near the root scheme, and the controller and the control information include the received optical address controller for the control information of the processor. , to the multi-control information more than the root control information.
  • This example is a sheep system, shown at 3, system 303, including 307, 308, 309, 310, and photodetector 317, processor 305, and controller 306.
  • Control 301 controls communication with terminal 302 325 303 303, and optical 318 of 303 replaces the optical characteristics of ⁇ with the same, 303 customers receive 320 321 and 322. In the case, the customer can receive more. Customer receives "(not) connected
  • the customer receives 320 321 and 322 to work together. Due to the increase of the client, 307 can not provide sufficient power, and the detectors 317 to 303 need to be larger to meet the needs of the customer to receive the 320 321 and 322 work. , detector 317
  • the processor 305 resolves to the same 303 and needs more stream work, and the processor 305 reverses the controller 306 308 to
  • the detectors 317 to 303 need more and more to work, then
  • the controller 305 passes the controller 306 309 to 303. This is more to the situation of the sheep.
  • the present embodiment of the present invention includes 428 429 430 431, and a photodetector 425, a processor 427, and a controller.
  • 413 is the same as 428 429.
  • 419, the same detector 425 419, the result of the 427, 427, juice, the result of the juice is 428 429 has been to 413, and can not provide enough 419 work, then the processor 427 reverse, the result of the controller 433 430 419 processor 427 is 430 can not provide a large 419, then the device 427
  • controllers 433 430 and 431 are in the same direction 419. This is more of a multi-directional situation.
  • the present embodiment including 537 538 539 540, and the photodetector 535, the processor 536, and the controller 541, the 531 532 is in operation, in the middle control 510, the optical 506 of the terminal 501 And 507, due to ⁇ 543 and 544 respectively
  • the inverse 542 controller 541, the controller 541 is for the controller 541 538 533 , 538 ,
  • processor 536 determines that this 538 does not provide sufficient
  • connection Multi-purpose more or more, including the following steps
  • Step B The result of step A is connected to a multi-source solution
  • Step C Multi-step B's solution to .
  • Step A includes going to the park.
  • Step B The result of step A, the result of the connection is connected to the control of the multi-source source, and the result includes the result A/spec.
  • Controls include whether, if, or under power, and . No exists with .
  • Step C rest Step B's scheme generation control information, more
  • control information is the same, and the control information includes the accepted optical address.
  • control mainly includes the following part of the controller 608 P control, which is the control part, and the A of the processor 608 can put the 603 to the word-like special, the processor 608 internal P, can be transferred to the work, through the P internal Fash
  • the function of the controller P is to receive the address of the processor CP 608, and to pass the pre-determined internal, outgoing source address 616.
  • Both 609 610 611 and 612 have a P, and the source address 616 of the receiving controller P is a good address. To the road or.
  • Step 701 each forest city, mainly 6 CPU CP 608 controller P 613 609 610 611 612 CP, CP and each forest city
  • Step 702 If the method is successful, if the result is unsuccessful, the work is not "normal work", and if the step 703 is successful, each forest city may work normally, step 704
  • Step 704 the controller CP 608 controller P, P command 609 (can also program other)
  • Step 705 the controller P 609 P, 609 to 609, 604 (can also be more controlled by the program
  • Step 706, pass 603, provided to the processor CP 608
  • Step 707 whether the processor CP 608 determines the result, and the result of step 706 is determined to be no, and then step 708 is reached.
  • step 711 If the 609 and 610 can meet the requirements, if the result of the determination is OK, then if the result of the determination is no, the process proceeds to step 711.
  • Step 709 processor CP 608 controller P, P command 609 610
  • Steps 711, 609 610 611 are used, that is, the same
  • step 712 the controller CP 608, the controller P, P, 609 610 611
  • steps 714, 609 610 611 and 612 are used, that is, the same
  • step 715 If the result of the judgment is satisfied, if the result of the determination is yes, then the result of step 715 is negative, so that more
  • Step 715 processor CP 608 controller P, P command 609 610 611 and 612
  • Ben Mingtong the decision to connect multiple sources, in the obstacles, use or add other, cross and the same mutual, increase the stability of the results of the existence of the results, the results determine the source, and other fine control , but can be the same, fast, and make the unified control of the work can work independently, in line with the control concept of the modern control system, and good control.

Abstract

A method and a system for supplying power to an optical network unit (ONU) are disclosed. The method involves a procedure of performing selection starting for at least two power supplies connected with the ONU. Said procedure includes the following steps: sampling the power supply current of the ONU; determining the selection starting scheme of the power supplies connected with the ONU based on the sampling results; and supplying power to the ONU from the power supplies according to the selection starting scheme. In this way, it achieves crossfeed and backup among the power supplies and enhances the stability of the system, by using or adding other power supplies for supplying power, when a fault or over-current occurs in one of the power supplies.

Description

方法和 統  Method and system
木領域 Wood field
本 涉及光 領域, 休涉及 羊 或多 同 的方法和 統。  This is in the field of light, and Hugh involves sheep or multiple methods and systems.
背景 木 Background
目前, qJ(Op ca ewok )的 方式是 T -T .44 的 , 用以下 方法中的某 , 即 4 控制 、 本 和光 。  Currently, qJ (Op ca ewok ) is T-T .44, using one of the following methods, namely 4 Control, Ben and Light.
控制 , 需要由 介中 控制 提供 各 , 神 情況由于需要 各 商管理光 的 , 而且 是 源的 羊 走 近是和光仟在 起走 , 都 大 各 的成本, 因而 不 合 的 , 方案 沒有被 各 商戶 于 各的 。 本地 也沒有被 于現在的光 各, 是由于 .44 中 需要 各 源的管理。 而且, 的 , 由于  Control, need to be provided by the mediation control, God's situation requires the management of light by various businesses, and the source of the sheep is approaching and the light is moving away, the cost of each is different, and therefore the plan is not by each merchant. of. The locals are not due to the present light, it is due to . The management of each source is required in 44. And because of
介 向所有的光 , 了防止 各燒毀, 只能中 向 , 就中 了 的並各, 使 遭受損失。  To all the light, to prevent each burning, only in the middle, and in the middle, and suffer losses.
是 神戶 用的 方案。 1所示,每 介O 由羊 的 介P (Powe o ce ) 。 現有 木中, 各中 的 便是 了 功能。 T -T .44的 于 1  It is a program used by Kobe. As shown in Fig. 1, each of the O is made by the sheep's P (Powe o ce ). In the existing wood, each one is a function. T -T .44 of 1
的情況下, 需要客戶操作和管理 的 , 就 了 各 商提供 各, 而返 使用 各和提供 各。  In the case of the customer's operation and management, each supplier provides each, and each use and supply.
現有 木中, 于 方式, 有 的 , 但是 障或 , 仍然 造成 中 , 而 的並 各。 內容 Existing wood, in the way, some, but the obstacles or, still cause the middle, and each. content
本 的目的是提供 神采 多 的方法和 統。 本 的 木 以下 木方案 以解決  The purpose of this book is to provide a more sophisticated approach and system. The wood below the wood solution to solve
方法, 包括 連接到 的至少  Method, including at least
 .
上 連接到 的至少 用的 步驟 的  At least the steps used to connect to
方案向 。 Program to.
上 的 近包括將 的 到 固內的 。  The upper ones include the ones that will be in the solid.
上 于 結果 連接到 的 源的 方案包括 吋采 結果 分析 , 以 是否存在 和  The scheme for the source connected to the result includes analysis of the results of the mining to see if it exists and
結果 連接到 的 源的控制 。  The result is the control of the source connected to .
上 控制 包括是否 、 是否 、 下的功率、 下的 和 下的 。  The upper control includes whether, if, and under power, under and below.
方案生成 控制信息, 上 控制信息包括接受 的光 地址 The scheme generates control information, and the control information includes the accepted optical address.
控制信息向 。  Control information to .
統, 包括多 、 和 理器 多 包括 或 以上的 , 相連, 且 方案向  System, including multiple, and multiple devices, including or above, connected, and
阿 的 將 結果 理器 方案。 A result processor Program.
上述 近 于將 到 園內, 是指 上 理器可 理的 大小 。  The above is near to the park and refers to the size of the processor.
上述 理器近 于 結果 分析 ,以 是否存在 , 結果 連接到 的上 多 源中 源的控 制 。  The above-mentioned processor is close to the result analysis to see if it exists, and the result is connected to the control of the multi-source source.
上述控制 包括是否 、 是否 、 下的功率、  The above control includes whether, whether, or not,
下 和 下 。 Down and down.
上述 統, 近包括 控制器, 其 控制信息,  The above system, including the controller, its control information,
向 多 上 控制信息, 上 控制信息 包括接受 的光 地址  To control information, the upper control information includes the accepted optical address
所述 理器近 方案生成 控制信息,  The processor near the scheme generates control information,
控制器, 其中 控制信息包括接受 的光 地址  Controller, where the control information includes the accepted optical address
所述多 近 控制信息向 。 The near control information is directed to .
本 現有 木相比較的有益效果是  The beneficial effect of the existing wood phase comparison is
本 明通 的 ,決定 連接的多 源的 方案, 在 障或 , 使用或增 其他的  Ben Mingtong, the decision to connect multiple sources, in the obstacles, use or increase other
, 了交叉 和 同的相互各 , 增 了 統的穩定性 , cross and the same mutual, increasing the stability of the system
)本 明通 結果 分析, 是否存在 , 結果 決定 源的 、 和其他精 控制參數, 而能 各  The results of the analysis of the present invention, whether it exists, the results determine the source, and other fine control parameters, and can
同 、 快速的 , 而使得 統 控制 Same, fast, and control
3)本 的 可以相互 立工作,符合現代控制 中 統可 和可 性的控制理念, 統 良好的 和控制。 1是 統結 示意3) This can work independently of each other, in line with the control concept of modern control and compatibility, good and control. 1 is the unified signal
2是本 統 休 方式 示意 2 is the way of the system
3是本 統 示意 3 is the system
4是本 統 示意 4 is the system
5是本 統 示意 5 is the system
6是本 方法 示意 6 is the method
7是本 方法 流程 。  7 is the flow of this method.
本 的較佳 方式 The preferred way of this
用具休 方式結合 本 步 。  This method is combined with the method of rest.
本 提出了 同 統, 其 方式, 2所示, 包 括 連接的多 , 即 或 以上的 , 本 方 式中, 有 , 2。 本 方式近包括 和 理器, 路用于 的 將 結果 This paper proposes the same system, the way, 2, including the connection, that is, or above, in this method, there are, 2. This mode includes the router, the road used for the result
5 理器用于 于 結果 連接到 多 源的 5 processor is used to connect the result to multiple sources
方案 多 近 于根 方案向 。  The program is much closer to the root plan.
近 于將 到 園內, 是指 理器可以赴理的 大小 。  Nearly going to the park is the size that the processor can take care of.
理器近 于 結果 、 理結果 連接到0 的多 源中 源的控制 , 其中 結果的 包 括 結果 特 。  The result is near the result, and the result is connected to the control of the multi-source source of 0, where the result includes the result.
控制 包括是否 、 是否 、 下的功率、 和 。 , 以 是否存在 。 Controls include whether, if, or under power, and . To whether or not there is.
5 本 方式近可包括 控制器, 理器近 于根 方案 生成 控制信息, 控制器, 控制信息中包括接受 的 光 地址 控制器用于 理器 的 控制信息, , 向多 控制信息 多 近 于根 控制信息向 。 5 The method may include a controller, and the controller generates control information near the root scheme, and the controller and the control information include the received optical address controller for the control information of the processor. , to the multi-control information more than the root control information.
本 統的另外的 方式, 以下 所示  Another way of the system, shown below
本例是 羊 的 統, 3所示, 統 303 , 包括 307、 308、 309、 310, 以及光 測 器317、 理器305和 控制器306 This example is a sheep system, shown at 3, system 303, including 307, 308, 309, 310, and photodetector 317, processor 305, and controller 306.
控制 301控制同 終端302 仟 325 303通信, 303的光 特 318把 仟 的光 特換成 , 同 , 303 客戶 接收 320 321和322 。 中, 客戶 接收 可以有多 。 客戶 接收 「 ( 未 )相連 Control 301 controls communication with terminal 302 325 303 303, and optical 318 of 303 replaces the optical characteristics of 仟 with the same, 303 customers receive 320 321 and 322. In the case, the customer can receive more. Customer receives "(not) connected
320 321和322接 收到的 用解 319,把 特 成 , 仟326 把 終端302  320 321 and 322 receive the received solution 319, put the special, 仟 326 terminal 302
本 中, 只有客戶接收 320 , 此 由 307羊 In this, only the customer receives 320, this is 307 sheep
303 303中增 到客戶 接收 320 321和322同 工作 , 此 由于客戶端的增 , 307 已 不能提供足 大的 功 率, 測器 317 到 303需要更大的 才能滿足客戶 接收 320 321和322同 工作 的需要, 測器317  In 303 303, the customer receives 320 321 and 322 to work together. Due to the increase of the client, 307 can not provide sufficient power, and the detectors 317 to 303 need to be larger to meet the needs of the customer to receive the 320 321 and 322 work. , detector 317
向 理器 305 的工作情況,  The operation of the processor 305,
理器 305解析到 同 303需要更大的 流工作 , 理 器 305 反 通 控制器 306 308向  The processor 305 resolves to the same 303 and needs more stream work, and the processor 305 reverses the controller 306 308 to
303 , 果 308向 303 近是 , 即 303, fruit 308 is close to 303, ie
測器 317 到 303近需要更大的 才能 常工作, 那 The detectors 317 to 303 need more and more to work, then
理器305通 控制器 306 309向 303 。 以此 更多 向羊 的情況。  The controller 305 passes the controller 306 309 to 303. This is more to the situation of the sheep.
本 中 向 阿 的 統 4所示 包括 428 429 430 431, 以及光 測器425、 理器427和 控制器。 本 中, 413由 428 429同 才能 常工作, 在某 , 419 , 同 測器425 419 , 把 到的 理器 427, 理器 427 , 果汁 的結果是 428 429 已向 413 ,而不能提供足 大的 419工作 ,則 理器427 反 , 通 控制器433 430 419 理器427 理的結果是 430 不能提供足 大的 419 , 則 理器 427 The present embodiment of the present invention includes 428 429 430 431, and a photodetector 425, a processor 427, and a controller. In this, 413 is the same as 428 429. In some, 419, the same detector 425 419, the result of the 427, 427, juice, the result of the juice is 428 429 has been to 413, and can not provide enough 419 work, then the processor 427 reverse, the result of the controller 433 430 419 processor 427 is 430 can not provide a large 419, then the device 427
反 , 通 控制器433 430和 431 同 向 419 。 以此 更多多 向 的情況。  Inverted, the controllers 433 430 and 431 are in the same direction 419. This is more of a multi-directional situation.
本 向多 的 統, 5所示,包括 537 538 539 540, 以及光 測器535、 理器536和 控制器541 本 中, 531 532 在工作 , 在中 控制 510中, 通 終端 501的光 特 506和507, 由 仟 543和544分別 The present embodiment, including 537 538 539 540, and the photodetector 535, the processor 536, and the controller 541, the 531 532 is in operation, in the middle control 510, the optical 506 of the terminal 501 And 507, due to 仟543 and 544 respectively
531 532通信, 531 532的工作 由 537提供。 在某 , 由于並各需要, 533 工作, 測器 535 531 532 communication, 531 532 work provided by 537. In a certain, because of each need, 533 work, detector 535
531 532 533的 , 到 理器536, 531 532 533, to processor 536,
理器 536 , 假 判定力 537 已 不能提供足 大 的 功的光 533, , 理器 536  536, false determination force 537 can not provide enough work light 533,, processor 536
反 542通 控制器 541, 通 控制器 541 的目的是 控制器 541 538 533 , 538 ,  The inverse 542 controller 541, the controller 541 is for the controller 541 538 533 , 538 ,
測器 535 新工作 的 , 通  535 new work, pass
理器 536, 若 理器 536判定此 538不能提供足 大的 Processor 536, processor 536 determines that this 538 does not provide sufficient
533, 則通 控制器541 539 533 , 以此 , 直到 533 常的工作力 理器 536 判定此 538可以提供足 的 533, 則 源流程 , 到 547流程中。 以此 多 向多  533, then the controller 541 539 533, so that until 533, the normal working force 536 determines that the 538 can provide the 533, the source flow, to the 547 process. Multi-directional
的情況。 Case.
本 方法, 其 方式, 包括 連接到 的 多 用的 , 多 包括 或 以上的 , 包括以下步驟 The method, the method thereof, including the connection Multi-purpose, more or more, including the following steps
步驟A. 的  Step A. of
步驟B. 于步驟A的 結果 連接到 多 源的 方案  Step B. The result of step A is connected to a multi-source solution
步驟C. 多 步驟B的 方案向 。  Step C. Multi-step B's solution to .
步驟A 包括 到 園內的 。  Step A includes going to the park.
步驟B 步驟A的 結果 、 理結果 連接到 的多 源中 源的控制 以 , 其中 結 果的 包括 結果 A/ 特 。  Step B The result of step A, the result of the connection is connected to the control of the multi-source source, and the result includes the result A/spec.
控制 包括是否 、 是否 、 下的功率、 和 。 否存在 以 。  Controls include whether, if, or under power, and . No exists with .
步驟C 休 步驟B的 方案生成 控制信息, 多  Step C rest Step B's scheme generation control information, more
控制信息向 同 , 控制信息中包括接受 的光 地址。  The control information is the same, and the control information includes the accepted optical address.
本 方法, 另外的 方式 所示 6所示, 本 控制 的 主要包括以下 部分 理器608 P 控制, 是 控制的 部分, 理器 608的A 特 可以把 603 到的 似到 字的特 , 通 理器608內部的 P , 可以將 到的 工 , 通 P 內部Fash中的  The method, shown in the other way, shows that the control mainly includes the following part of the controller 608 P control, which is the control part, and the A of the processor 608 can put the 603 to the word-like special, the processor 608 internal P, can be transferred to the work, through the P internal Fash
比較, 可以得出需要 的 , 由 P 的 地址 , 再把 地址 控制器 P 613  Comparison can be obtained by the address of P, and then the address controller P 613
控制器 P 的作用是接收 理器CP 608 的地 址 , 通 預先 好的內部 , 出 組 源地址 616 The function of the controller P is to receive the address of the processor CP 608, and to pass the pre-determined internal, outgoing source address 616.
609 610 611 和 612 中都有 介 P , 于接收 控制器 P 的 源地址 616, 通 身 好的地址 , 向 路或 。Both 609 610 611 and 612 have a P, and the source address 616 of the receiving controller P is a good address. To the road or.
7 在 6所示 上的 工作流程, 包括以下步驟  7 The workflow shown in 6 includes the following steps
步驟 701、 各 林市, 主要是 6 中 理器 CP 608 控制器 P 613 609 610 611 612 中 CP ,CP 和各林市  Step 701, each forest city, mainly 6 CPU CP 608 controller P 613 609 610 611 612 CP, CP and each forest city
步驟 702、 是否成功, 果不成功, 則 各不"常工 作, 步驟 703 果 成功, 則 各各林市可以 可以 常工作, 步驟704  Step 702: If the method is successful, if the result is unsuccessful, the work is not "normal work", and if the step 703 is successful, each forest city may work normally, step 704
步驟703、 指示, 各  Step 703, indication, each
步驟704、 理器CP 608 控制器 P 、 P 令 609 (也可 程序 其他的 )  Step 704, the controller CP 608 controller P, P command 609 (can also program other)
步驟705、 控制器 P 609的 P , 609 向 609 , 604上 (也可 程序更 控制 Step 705, the controller P 609 P, 609 to 609, 604 (can also be more controlled by the program
605或606或607上 )  605 or 606 or 607)
步驟 706、 , 通 603 , 向 理器CP 608提供 的  Step 706, , pass 603, provided to the processor CP 608
步驟 707、 理器 CP 608 是否 , 結果判定力 , 則特到步驟 706, 的 結果 判定力沒有 , 則特到步驟708  Step 707, whether the processor CP 608 determines the result, and the result of step 706 is determined to be no, and then step 708 is reached.
步驟 708、 理器 CP 608 內部程序 分析, Step 708, processor CP 608 internal program analysis,
609和 610是否能 滿足 的 需求, 果判定結果 可 以, 則特到步驟709 果判定結果 否, 則特到步驟711  If the 609 and 610 can meet the requirements, if the result of the determination is OK, then if the result of the determination is no, the process proceeds to step 711.
步驟709、 理器CP 608 控制器 P 、 P 令 609 610  Step 709, processor CP 608 controller P, P command 609 610
步驟710、 控制器 P 609 610的 P 、 Step 710, P of the controller P 609 610,
609 610 , 特 步驟706  609 610, special step 706
步驟 711、 609 610 611是否移用, 即同  Steps 711, 609 610 611 are used, that is, the same
是否"移滿足 的需求, 果判定結果 是, 特到步驟 712 果判定結果 否, 則特到步驟714 步驟712、 理器CP 608 控制器 P 、 P 令 609 610 611 Whether it is "shifted to meet the demand, if the result of the determination is that, in step 712, if the result of the determination is no, then step 714 is reached. Step 712, the controller CP 608, the controller P, P, 609 610 611
步驟713、 控制器 P 609 610和611的 P 、 609 610和611 , 特到步驟706  Step 713, P, 609 610 and 611 of controllers P 609 610 and 611, in step 706
步驟714、 、 609 610 611和612是否移用, 即同  Whether steps 714, 609 610 611 and 612 are used, that is, the same
是否能 滿足 的需求, 果判定結果 是, 則特到步 驟715 果判定結果 否, 以此 , 可以 更多的 向  If the result of the judgment is satisfied, if the result of the determination is yes, then the result of step 715 is negative, so that more
步驟715、 理器CP 608 控制器 P 、 P 令 609 610 611和612  Step 715, processor CP 608 controller P, P command 609 610 611 and 612
步驟716、 控制器 P 609 610 611和612的 P 、 609 610 611和612 , 特 步驟 706, 林光 。  Step 716, P, 609 610 611 and 612 of controllers P 609 610 611 and 612, special step 706, Lin Guang.
以上內容是結合 休的 方式 本 所作的 步 細說明, 不能 本 的 休 只局限于 說明。 于本 木領域的 普通 木 東說, 在不 本 的前提下, 近可以做出若干 羊推 演或替換, 都 視力 于本 的保 。 The above is a detailed description of the steps taken in conjunction with Hugh, and the rest can not be limited to the description. Ordinary Mudong in the field of this wood said that under the premise of this, some sheep can be made or replaced, and all of them are based on this guarantee.
用性 Usability
本 明通 的 , 決定 連接的多 源 的 方案, 在 障或 ,使用或增 其他的 , 了交叉 和 同的相互各 , 增 了 統的穩定性 結果 是否存在 , 結果決定 源的 、 和其他精 控 制 , 而能 各 同 、 快速的 , 而使得 統 控制 本 的 可以相互 立工作, 符合現代控 制 中 統可 和可 性的控制理念, 統 良好的 和 控制。  Ben Mingtong, the decision to connect multiple sources, in the obstacles, use or add other, cross and the same mutual, increase the stability of the results of the existence of the results, the results determine the source, and other fine control , but can be the same, fast, and make the unified control of the work can work independently, in line with the control concept of the modern control system, and good control.

Claims

要 求 Claim
1、 方法, 包括 連接到 的至少 1, method, including at least connected to
 .
2、 要求1所述的方法, 其中 至少 用 的 步驟包括  2. The method of claim 1, wherein the at least step of using
吋所 的 所述 方案向 。 The plan of the office is to .
3、 要求1所述的方法, 其中, 的  3. The method of claim 1, wherein
近包括將 的 到 園內的 。  Nearly including the will to the park.
4、 要求1所述的方法, 其中, 于 結果 連接到 的 源的 方案包括  4. The method of claim 1 wherein the solution to the source to which the result is connected comprises
吋所 結果 分析 , 以 是否存在 和  Analysis of the results of the results to
結果 連接到 的 源的控制 。  The result is the control of the source connected to .
5、 要求4所述的方法, 其中, 控制 包括是否 、 是 否 、 下的功率、 下的 和 下的 。 5. The method of claim 4, wherein the controlling includes whether, yes, no, power down, down and down.
6、 要求1至5任 項 的方法, 其中,  6. The method of claim 1 to 5, wherein
方案向 的 步驟包括  The steps of the program include
方案生成 控制信息, 控制信息包括接受 的光 地址  The scheme generates control information, and the control information includes the accepted optical address.
所述 控制信息向 。  The control information is to .
7、 統, 包括多 、 和 理器, 多 包括 或 以上的 , 連接, 且 方案向  7, system, including multiple, and physical, more than or more, connected, and program
的 將 結果 理器 方案。 Result processor Program.
8、 要求7 的 統, 其中, 近 將 的 到 園內, 所述 是指 理器可 理的 大小 。 8, the requirements of the system 7, which, near the park, said the size of the device.
9、 要求7 的 統, 其中, 理器 步  9, the requirements of 7 system, where, the processor step
結果 分析 , 以 是否存在 , 結果 連 接到 的 多 源中 源的控制 。  The results were analyzed to determine whether or not the results were connected to the control of multiple source sources.
10、 要求 9 的 統, 其中, 控制 包括是否 、 是否 、 下的功率、 下 和 下 。 10. The system of requirement 9, where the control includes whether, whether, or not, power, down and down.
11、 要求7至10中任意 項 的 統, 近包括 控制器, 其 控制信息, 向 多  11. Requirements for any of items 7 to 10, including controllers, control information,
控制信息  Control information
理器近 方案生成所述 控制信息, 控制器,其中 控制信息包括接受 的光 地址 多 近 控制信息向 。  The processor near the scheme generates the control information, the controller, wherein the control information includes the received optical address and the near control information.
PCT/CN2009/073246 2009-06-17 2009-08-13 Method and system for supplying power to optical network unit WO2010145088A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200910108323.1 2009-06-17
CN2009101083231A CN101594000B (en) 2009-06-17 2009-06-17 Power supply method and power supply system by using optical network element

Publications (1)

Publication Number Publication Date
WO2010145088A1 true WO2010145088A1 (en) 2010-12-23

Family

ID=41408514

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2009/073246 WO2010145088A1 (en) 2009-06-17 2009-08-13 Method and system for supplying power to optical network unit

Country Status (2)

Country Link
CN (1) CN101594000B (en)
WO (1) WO2010145088A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103684619A (en) * 2013-12-19 2014-03-26 福建星网锐捷网络有限公司 Power supply and communication method and system based on optical fibers, power supply equipment and power receiving equipment
CN105375980A (en) * 2015-11-27 2016-03-02 上海斐讯数据通信技术有限公司 Device and method for detecting continuous light emission of multi-channel optical network unit
JP7071090B2 (en) * 2017-10-31 2022-05-18 キヤノン株式会社 Power receiving device, power receiving device control method, and program

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0547329A2 (en) * 1991-12-19 1993-06-23 Dsc Communications Corporation Apparatus and method for monitoring power loss in a telecommunication system
US5706157A (en) * 1996-02-26 1998-01-06 Reltec Corporation Power distribution system with over-current protection
US6240337B1 (en) * 1998-04-02 2001-05-29 Bell Atlantic Network Services, Inc. Flywheel reserve power for outside plant of a communication network
US7105950B2 (en) * 2003-09-26 2006-09-12 Hewlett-Packard Development Company, L.P. Power management in a system having a plurality of power supplies
JP2008141839A (en) * 2006-11-30 2008-06-19 Media Global Links:Kk Simultaneous power supply starting system
CN101409626A (en) * 2008-12-01 2009-04-15 北京格林伟迪科技有限公司 Optical network unit and method for controlling power supply user terminal access thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0547329A2 (en) * 1991-12-19 1993-06-23 Dsc Communications Corporation Apparatus and method for monitoring power loss in a telecommunication system
US5706157A (en) * 1996-02-26 1998-01-06 Reltec Corporation Power distribution system with over-current protection
US6240337B1 (en) * 1998-04-02 2001-05-29 Bell Atlantic Network Services, Inc. Flywheel reserve power for outside plant of a communication network
US7105950B2 (en) * 2003-09-26 2006-09-12 Hewlett-Packard Development Company, L.P. Power management in a system having a plurality of power supplies
JP2008141839A (en) * 2006-11-30 2008-06-19 Media Global Links:Kk Simultaneous power supply starting system
CN101409626A (en) * 2008-12-01 2009-04-15 北京格林伟迪科技有限公司 Optical network unit and method for controlling power supply user terminal access thereof

Also Published As

Publication number Publication date
CN101594000B (en) 2012-05-23
CN101594000A (en) 2009-12-02

Similar Documents

Publication Publication Date Title
US9635071B2 (en) Load balancing in a central conferencing routing server
US20130054737A1 (en) System and Method for Data Acquisition in an Internet Protocol Network
WO2010145088A1 (en) Method and system for supplying power to optical network unit
WO2012149718A1 (en) Method for cloud terminal to access cloud server in cloud computing system, and cloud computing system
WO2010148599A1 (en) Protection system, method and apparatus for optical network
US20120200662A1 (en) Method and System for Controlling Multipoint Video Conference, Central Control Subsystem and Video Terminal
CN108959167A (en) A kind of seat system management method, device and seat system
JP2011114699A (en) Information sharing system
WO2010148914A1 (en) Method and apparatus for creating dial-up service
TW201230719A (en) Global control policy manager
WO2010148874A1 (en) Method, system and device for single-fiber bidirectional ring network protection
CN105467846A (en) Intelligent household appliance control method and system
US20240031179A1 (en) Method and system for managing power delivery and device operation over a meshed power over ethernet network
WO2010148892A1 (en) Method, video access unit and system for implementing load balance for media transcoding network
RU2014111289A (en) ETHERNET INTERFACE PROTECTION METHOD AND NETWORK PARTY DEVICE
US20130138755A1 (en) System and Method for Multiple Accounts to Access Internet Message Access Protocol Server
WO2016197856A2 (en) Method and device for managing active ethernet terminal power source
CN105229970A (en) The system and method coming for ISCSI transfer of data assigned priority by using the switch enabling data center bridging
CN106707978B (en) Method for transferring intelligent household control right through address book and address book
WO2013037314A1 (en) System and method for use in data processing center disaster backup
WO2010142173A1 (en) Advanced telecommunications computing architecture switch system, method and communication device
CN101505567A (en) Control method and control system using DMX512 protocol
CN102480472A (en) Application program integration login method of enterprise inner network and verification server thereof
CN102158396A (en) Label distribution method and device for node
CN105792027B (en) Passive optical network, controller and the method for communication

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09846002

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09846002

Country of ref document: EP

Kind code of ref document: A1