WO1998016713A1 - Procede d'excavation a l'aide d'impulsions electriques et excavatrice associee - Google Patents

Procede d'excavation a l'aide d'impulsions electriques et excavatrice associee Download PDF

Info

Publication number
WO1998016713A1
WO1998016713A1 PCT/JP1997/002345 JP9702345W WO9816713A1 WO 1998016713 A1 WO1998016713 A1 WO 1998016713A1 JP 9702345 W JP9702345 W JP 9702345W WO 9816713 A1 WO9816713 A1 WO 9816713A1
Authority
WO
WIPO (PCT)
Prior art keywords
voltage
electrodes
voltage pulse
pulse generator
bore
Prior art date
Application number
PCT/JP1997/002345
Other languages
English (en)
French (fr)
Inventor
Adam Albert Martunovich
Vajov Vyacheslav Fedorovich
Original Assignee
Itac Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Itac Ltd. filed Critical Itac Ltd.
Priority to AU33592/97A priority Critical patent/AU3359297A/en
Priority to JP51816698A priority patent/JP3877010B2/ja
Priority to US09/284,833 priority patent/US6164388A/en
Publication of WO1998016713A1 publication Critical patent/WO1998016713A1/ja

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/18Drilling by liquid or gas jets, with or without entrained pellets
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/14Drilling by use of heat, e.g. flame drilling
    • E21B7/15Drilling by use of heat, e.g. flame drilling of electrically generated heat

Definitions

  • the present invention relates to excavation of insulating solid matter, mining of oil and gas, civil engineering, and the like. Background art
  • the bore top is placed on the bedrock in the effluent.
  • High voltage electrical pulses are applied to the electrodes at microsecond intervals.
  • the electric discharge passes through the rock and is destroyed and crushed.
  • the pulse time leading to destruction is determined by the distance between the electrodes.
  • the disadvantage of this method is that the only way to increase drilling efficiency is to have a single parameter, the distance between the electrodes.
  • the rock to be crushed is immersed in a liquid. That The liquid becomes an insulator at selected pulses of the high voltage electrical pulse. Electric pulses are applied to the electrodes installed on the rock. Electric discharge occurs in the rock immersed in the insulating fluid.
  • the disadvantage of this method is that the optimum conditions for rock fracture are only satisfied for the rock mass between the two electrodes, which is much larger than excavation.
  • excavators consist of a bore top and bore pipe, and a high voltage power supply.
  • a guide is attached to the entrance of the excavation hole, and an elevating device is also attached.
  • the effluent from the borehole forms an effluent cycle ⁇ and is connected to an effluent tank.
  • the high pressure pulse is applied to the high pressure pipe of the bore pipe.
  • an object of the present invention is to provide an excavation method and an excavator capable of efficiently excavating with a minimum power consumption. Disclosure of the invention
  • the excavation method of the present invention is a type of excavation method for destroying an object to be excavated existing in a drilled hole into which a discharged liquid is introduced, by discharging between a plurality of electrodes by a high-voltage pulse. At least one of them is a method of excavating by selecting the most appropriate value to minimize the power consumption for excavation.
  • the optimum value of the load voltage required to destroy the excavated object is estimated by the following equation (1).
  • the load voltage is changed continuously or intermittently to find the optimum value of the load voltage required for the destruction of the excavated object.
  • the single pulse case of energy one the single pulse optimal value of the energy scratch following formula (2) thus estimated, within a single pulse energy including a single pulse energy value W 0, which is the estimated Then, the optimum value of the single-pulse energy is found by changing the single-pulse energy continuously or intermittently.
  • the optimum value of the amount of the effluent is estimated by the following equation (3), and the estimated effluent is calculated.
  • the optimum value of the amount of effluent is found by continuously or intermittently changing the amount of effluent within the range of the amount of effluent including the amount Q of the effluent.
  • the most appropriate value for minimizing the power consumption of the above parameters related to excavation efficiency is estimated in advance by the above equations (1), (2) and (3), and the excavation is tried, so that the optimal value is found. It is possible to find the optimum value efficiently by minimizing the number of tests for the test.
  • the excavator of the present invention is an excavator 1 that destroys an excavated object existing in a drilled hole into which a discharged liquid is introduced by discharging between a plurality of electrodes by a high-voltage pulse, comprising: a high-voltage pulse generator; It is provided with a plurality of electrodes to which at least one high voltage from the high-voltage pulse generator is input, a discharge circulation system, and an optimum condition setting device.
  • the optimal condition setting device is connected between the high voltage pulse generator and the plurality of electrodes, or is incorporated in the drainage circulation system, or the high voltage pulse generator and the plurality And at least one optimization of the following parameters relating to drilling efficiency so that the power consumption associated with drilling is minimized: .
  • At least one of parameters related to excavation efficiency such as i) load voltage required for destruction of an excavated object, ii) single pulse energy, and iii) amount of discharged liquid, Minimize consumption Optimization is performed as described above, so that it is possible to excavate efficiently with minimum power consumption.
  • one end in order to transmit the high voltage to the electrodes between the high-voltage pulse generator and the plurality of electrodes, one end is connected to the high-voltage pulse generator, and It has a bore pipe connected to the electrodes.
  • the bore pipe includes a high-voltage pipe, and a ground pipe that is concentrically stacked outside the high-voltage pipe.
  • the inside of the ground pipe of the bore pipe and the high-voltage pipe The outside is made of non-magnetic material with high electrical conductivity.
  • the excavator of the present invention includes a guide provided around the bore pipe for guiding the bore pipe into the ground.
  • the bore pipe and the guide are connected via a slide contact so that the bore pipe can slide vertically in the guide.
  • Such a contact connecting the guide and the bore pipe prevents breakage of the air gap due to a potential difference between the guide and the bore pipe.
  • the high-voltage pulse power supply circuit for generating the high-voltage pulse is an inductor-storage type high-voltage pulse power supply circuit in which an inductor-capacitor and a semiconductor rectifier are combined.
  • Such a power circuit is half the shape and weight of a conventional excavator that does not use a semiconductor rectifier in the power circuit, so that the excavator can be moved, and the number of capacitors and ball gaps is also reduced.
  • the advantage is that the life of the high-voltage pulse power supply circuit is prolonged because it reduces the voltage of the capacitor There is.
  • the excavator of the present invention further includes a lifting device having lifting means for vertically moving the bore pipe, and a high voltage input for inputting a high voltage to the bore pipe.
  • the portion is provided at a position on one end side of the bore pipe and inclined at a predetermined angle from the axis of the bore pipe.
  • the mounting position of the high voltage input section as described above makes it easier for the lifting means such as the wire of the elevating device to be connected to the bore pipe than when the high voltage input section is coaxial with the bore pipe. Then, the bore pipe can be easily installed in the excavation hole by the elevating device and raised from the excavation hole without concern for contact between the high-voltage input portion and the lifting means such as a wire.
  • the excavator of the present invention further includes: a high-voltage pipe; and a high-voltage pipe outside the high-voltage pipe for transmitting the high voltage to the electrode between the high-voltage pulse generator and the plurality of electrodes. It has a concentrically stacked ground pipe, one end of which is connected to the high voltage pulse generator, and the other end of which is connected to a plurality of electrodes. An outer surface of a high voltage input portion for inputting a high voltage to the bore pipe is covered with a semiconductive material, and is electrically connected to a ground pipe.
  • the high-voltage input section coated with the semiconductive material in this way can withstand a higher load voltage than one without the coating of the semiconductive material.
  • an excavator of the present invention includes a discharged mud collecting device attached to the bore pipe.
  • the discharge mud collecting apparatus has a discharge liquid supply path provided on a concentric circle with a bore pipe and formed by a fan-shaped pipe, and a collection path formed by a groove interposed between the discharge liquid supply paths.
  • the collecting passage is provided with a plurality of elastic valves along the discharged mud collecting direction.
  • the discharge mud collecting device with such a structure has an insufficient discharge mud collection speed. Even in the case of drainage, the discharged mud falls on the elastic valve and does not flow backward.
  • the collection path is a groove between the drainage supply paths and does not use a pipe for the collection path, a large lump dropped on the elastic valve can be easily formed by a known technique. Can be finely powdered. As a result, as in the case of a conventional discharge mud collection device that has a collection path formed by pipes and the like, the collection path is blocked by a large lump, and the pipes for the collection path are destroyed. There is no danger that the device itself will be destroyed.
  • the excavator according to the present invention further includes a bore top having a plurality of electrodes to which at least one high voltage from the high-voltage pulse generator is input, the high-voltage pulse generator and the bore.
  • a high-voltage pulse generator is connected at one end and a bore pipe is screwed at the other end.
  • the threaded portion of the bore top is provided with a horizontal opening having a predetermined length and two detents in the horizontal opening. The distance between the two detents is less than the predetermined length of the horizontal opening to allow rotation of the bore top about its axis.
  • the bore provided with the horizontal opening and the detent as described above can rotate around its axis. Therefore, it is possible to prevent the connection between the bore pipe and the bore top from being twisted due to the shock wave of excavation or the impact of discharged mud. And the bore top keeps its position at the bottom, which increases the efficiency of rock excavation.
  • the bore top is provided with an electrode on each intersection of the grid, and is movable in the borehole.
  • An electrode having such a structure is suitable for excavating an excavated object having a large-diameter core.
  • FIG. 1 is a diagram showing a configuration of an excavator of the present invention
  • FIG. 2 is a diagram showing a power supply circuit of the excavator of the present invention
  • FIG. 3 is a high voltage input in the excavator of the present invention.
  • FIG. 4 is a view illustrating a structure of a high-voltage input unit in the excavator according to the present invention.
  • FIG. 5 (a) and FIG. FIG. 3 is a diagram illustrating a discharged mud collecting device constituting the system,
  • Fig. 6 is a schematic diagram showing the mounting structure of the bore top to the bore pipe
  • Fig. 7 is a diagram showing the electrode structure of the bore top
  • Fig. 8 is a diagram showing the tip structure of the electrode.
  • Fig. 9 is a graph showing the power consumption W with respect to the load voltage U1
  • Fig. 10 is a graph showing the power consumption W with respect to the capacitance C of the pulse voltage generator when the load voltage U1 is 370 [kV].
  • Fig. 1 is a graph showing the single pulse energy with respect to the electrode distance L.
  • U o was determined using a sample of the excavated object.
  • U 0 is the distance between the electrodes placed on the surface of the sample of the excavated object in the effluent lctn Are the voltages [kv] at which the two electrodes are subjected to discharge breakdown of the sample.
  • Microquartzite (mineral name: quartzite) was used as a sample of the excavated material. This sample was immersed in diesel oil. Two electrodes were placed on the surface of the sample. At this time, the distance between the electrodes was 1 cm. One electrode was grounded and the other electrode was loaded with high voltage. The sample was destroyed five times under the same conditions. Here, for any type of sample, the number of experiments is required to be 5 to 10 times. In the case of heterogeneous samples, it is desirable to further increase the number of samples before conducting experiments.
  • a method of performing the excavation work by keeping the value constant during the entire excavation work may be simple.
  • the load voltage is changed within the range of the load voltage including the load voltage value U1 obtained by the above equation (1), and the optimum load voltage that minimizes the power consumption W is found. It is better to carry out the process periodically or continuously during the operation of the excavator, and to always excavate with the optimum load voltage that minimizes the power consumption W.
  • the load voltage is set to 380 [kV]
  • the distance between the electrodes is set to 4 cm
  • the single pulse energy is continuously or intermittently changed between 250 and 1550 [J]
  • the power consumption W is changed.
  • the sandstone was excavated while measuring.
  • Single pulse energy was varied by changing the + capacitance of the pulse voltage generator.
  • the range of the single pulse energy 250 to 1550 [J] was a range including the single pulse energy obtained from the equation (2) W o ⁇ 90L ′ • 6 .
  • the results are as shown in Table 2.
  • Single pulse energy per W. Is 880-1100 [J] At times, power consumption w was at a minimum.
  • excavation is performed using the optimum single pulse energy value Wo that minimizes the power consumption W.
  • this optimum single pulse energy one value Wo, after selecting the optimum value of single pulse energy at the beginning of excavation work, it is easy to perform excavation work while keeping the value constant during the entire excavation work Is fine.
  • the single pulse energy is changed within the range of the single pulse energy 1 including the single pulse energy 1 Wo obtained by the above equation (2), and the power consumption W is reduced. It is better to perform the process of finding the optimum single pulse energy to be minimized periodically or continuously during the operation of the excavator, and always to excavate with the optimum single pulse energy that minimizes the power consumption W .
  • the energy of a single pulse is set to 850 [J]
  • the distance between the electrodes is set to 4 cra
  • the bore top diameter is set to 110 [mm]
  • the pulse frequency 1 is set to 1 to 9 to obtain the effluent from equation (3).
  • the reason why the pulse frequency f is set to 1 to 9 is that the excavation rate is directly proportional to the pulse frequency f up to 9 per second, If the frequency is further increased, the excavation efficiency is reduced.
  • the amount of the effluent was continuously or intermittently changed within the range of the effluent including the value obtained by (3), and the quartz stone was excavated while measuring the power consumption W at that time .
  • the amount Q of the discharged liquid was optimally 450 [liter / minute].
  • excavation is performed using the optimal drainage amount Q that minimizes the power consumption W.
  • the excavation work should be performed with the value kept constant during the entire excavation work. Simple and good.
  • the amount of the effluent is changed within the range of the amount of the effluent including the amount Q of the effluent obtained by the above equation (3), and the power consumption W is minimized. It is better to perform the process of finding the optimum amount of drainage periodically or continuously during the operation of the excavator, and always to excavate with the optimum amount of drainage that minimizes the power consumption W.
  • an excavator 1 includes a high-voltage pulse generator 2, bore sections 9, 10, 11, 12; a discharge circulation system 3, 4, 5a, 5b; 15, 16, and lifting devices 6, 7, and 8.
  • the bore section includes a high-voltage input section 9, a bore pipe 11, a guide 10 provided around the bore pipe 11 for guiding the bore pipe 11 into the ground, and a bore provided at a tip of the bore pipe 11.
  • Top 12 is included.
  • the bore pipe 11 is composed of a high-voltage pipe 20 and a ground pipe 21 concentrically stacked outside the high-voltage pipe 20, and has a structure capable of sliding vertically within the guide 10. .
  • the high-voltage pipe 20 and the ground pipe 21 have a structure separated by intermediate insulating materials 22a and 22b. I have.
  • the inside of the Duland pipe 21 and the outside of the high-voltage pipe 20 are made of a non-magnetic and highly conductive material. Examples of the non-magnetic material having high electric conductivity include duralumin, copper, brass, and aluminum. This is done to reduce the phenomenon that the pulse rise time increases and the voltage width decreases as the borehole becomes deeper, and a thickness of about 0.1 mm or less is sufficient.
  • the guide 10 and the ground pipe 21 are connected via a slide contact 23 so that the ground pipe 21 can slide up and down in the guide 10. This is because the high-voltage pulse generator 2 and the discharge circuit in the bore section may or may not be grounded, but the guide 10 and the ground pipe 21 need to be connected.
  • Discharge between the duland electrode 17 and the high-voltage electrode 18 can also occur in the effluent, so the presence of a voltage between the guide 10 and the ground pipe 21 can destroy the air gap. There is. Therefore, in order to protect the high-voltage pulse generator 2 and the discharge circuit of the bore from being destroyed by this air gap, the guide 10 and the gland pipe 21 are connected to the slide contact 23 on the discharge side of the discharged liquid. It needs to be connected via
  • the bore 12 includes a ground electrode 17 and a high-voltage electrode 18.
  • the ground electrode 17 and the high-voltage electrode 18 are separated by a bore-top green material 19 .
  • the number of electrodes is, as described later, one for each of the ground electrode 17 and the high-voltage electrode 18. Is not limited.
  • the effluent circulation system includes an effluent tank 3, an effluent pump 4, and effluent pipes 5a and 5b. With this drainage circulation system, the drainage fluid flows from the drainage tank 3 through the pump 4 and the drainage pipes 5a and 5b to the bore, and from the bore through the gap between the outside of the ground pipe 21 and the drilling hole. Circulation returns to drain tank 3 through guide 10.
  • the optimal condition setting device is a load voltage adjustment device 13 for adjusting the load voltage and single pulse energy, etc., a power consumption measurement device 14 such as a pulse current transformer, and a drainage control device 15. And a condition setting control device 16.
  • the optimal condition setting control device 16 is connected to the load voltage etc. adjustment device 13, the power consumption measurement device 14, and the drainage control device 15.
  • the optimal condition setting control device 16 periodically or continuously optimizes the excavation conditions so that the power consumption is minimized.
  • the parameters for optimizing the excavation conditions include the load voltage required for rock failure, single pulse energy, and the amount of discharged liquid.
  • the discharge liquid control device 15 is incorporated in the discharge liquid pipes 5a and 5b, and performs periodic or continuous control of the discharge liquid parameters according to the above-described optimal condition setting control device 16.
  • Effluent parameters include fluid characteristics (volume conductivity, flow rate, mechanical properties such as structure, etc.) and operating conditions.
  • the lifting device includes means for lifting the bore pipe 11 such as the winch 6, the pulley 7, and the wire 8.
  • the operation of the excavator 1 having the above structure will be described.
  • the bore is installed at the bottom of the excavation hole so that the guide 10 guides the bore pipe 11 underground.
  • the effluent is drained by the effluent circulation system from the effluent tank 3 through the pump 4 and the effluent pipes 5a and 5b to the bore, and from the bore through the gap between the outside of the ground pipe 21 and the borehole.
  • the high-voltage pulse is applied from the high-voltage pulse generator 2 to the high-voltage pipe 20 and the high-voltage electrode 18 of the boat top via the high-voltage input unit 9. Electric discharge occurs between the high voltage electrode 18 and the Gunland electrode 17. The discharge penetrates the rock and destroys it. Destroyed rock is removed from the borehole together with the effluent by the effluent circulation system.
  • the elevating device lowers the bore part to the new bottom of the drilled hole. Reinstall. At this time, the bore pipe 11 slides downward along the inner wall of the guide 10 while being guided into the ground by the guide 10. Excavation work proceeds while repeating the above operations.
  • the optimal condition setting control device 16 adjusts the load voltage required for rock breakage and the amount of single pulse energy and the amount of effluent periodically or continuously so as to minimize power consumption. Decide what you want. Then, the drainage control device determines the characteristics of the fluid (mechanical characteristics such as volume conductivity, flow rate, structure, etc.) and the operation status based on the command from the optimum condition setting control device.
  • the optimum condition setting control device periodically or continuously supplies the load voltage and the single pulse energy required for the rock fracture so that the power consumption is minimized. Since the excavation conditions such as the amount of the discharged liquid are optimized, efficient excavation can be performed suitable for natural conditions. In addition, since the inside of the duland pipe 21 and the outside of the high-voltage pipe 20 are made of a non-magnetic and highly conductive material, the pulse rise time increases and the voltage width increases even if the drill hole is deep. Since the phenomenon of reduction of the excavator is remarkably reduced, there is no need to change the pulse state so much, and the excavator can be operated stably.
  • the excavator 1 of the present invention can be used not only for excavation of insulating solid materials such as bedrock, but also for mining of oil-gas and civil engineering. Therefore, the excavated object to be excavated is not limited to rock.
  • the high-voltage pulse power supply circuit used in the excavator 1 of the present invention Will be described.
  • This is an inductor storage type high voltage pulse power supply circuit using a semiconductor rectifier.
  • the high-voltage pulse power supply circuit includes a high-voltage capacitor 24, a ball gap 25, an inductor-and-capacitor 26, and a semiconductor rectifier 27 such as a diode.
  • the figure also shows the electrodes 17 and 18 of the boretop 12 and the rock.
  • This high-voltage pulse power supply circuit operates as follows. When a power supply is connected to the high-voltage capacitor 24 in parallel, a voltage is stored in the high-voltage capacitor 24.
  • the current that is going to flow toward one electrode 17 of the bore top 12 is guided by the diode 27 to the inductor-capacitor 26, and the voltage is also accumulated in the inductor-capacitor 26 to be boosted.
  • You. When a voltage sufficient to operate the ball gap 25 is stored in the high-pressure capacitor 24, the ball gap 25 is broken and the ball gap 25 is energized.
  • high-voltage pulse power supply circuit is energized, as shown by the arrow i 2 in the figure, the other electrode of the current from the high-voltage current and Daio one de 27 boosted in the inductor one capacitor 26 is bore top-12 Flow to 18. Then, a discharge occurs between the electrodes 17 and 18 of the bore top 12 and the rock is destroyed. The above operation is repeated.
  • the time for blocking the current flow to the electrode 17 of the bore top 12 by the diode 27 and storing a voltage sufficient for the ball gap 25 to operate in the high-voltage capacitor 24 is nanosecond. It's a short time. During this short time, the voltage of the inductor-capacitor 26 is increased. This step-up can be increased to a voltage that is 3 to 3.5 times higher than the load voltage applied to the high-voltage capacitor 124 by appropriately setting conditions such as impedance.
  • the following advantages are obtained as compared with a conventional excavator that does not use the diode 27 in the power supply circuit.
  • the shape and weight are halved, the excavator can be moved, the number of capacitors and ball gaps is reduced, and the capacitor voltage is also reduced, so the life of the high-voltage pulse power supply circuit is extended.
  • the shape and size of the pulse power source can be made much smaller by using an inductor-one capacitor and a solid-state rectifier. These can be located in the bore, especially near the bore top. Inductor-storage high-voltage pulsed power circuits can also be immersed in boreholes in boreholes. This is important when drilling deep holes, especially when using highly conductive effluents such as water.
  • the energy of a single pulse can be changed.
  • the support column 27, the winch 6, and the wire 18 constitute a lifting device.
  • the high-voltage input unit 9 is mounted at a position inclined at a predetermined angle from the axis of the bore pipe 11.
  • the predetermined angle ⁇ is desirably in a range of 30 ° ⁇ 150 ° with respect to the axis of the bore tube 11.
  • the wire 8 of the lifting device is connected to the bore pipe 11.
  • the bore pipe 11 is guided underground by the guide 10 and can move up and down along the guide 10.
  • the mounting position of the high-voltage input section 9 as described above is such that the high-voltage input section 9 is coaxial with the bore pipe 11. This makes it easier for the wire 18 of the lifting device to fall into the bore pipe 11.
  • the installation of the bore pipe 11 in the excavated hole by the elevating device and the lifting of the bore pipe 11 from the excavated hole can be performed without concern for the contact between the high-voltage input unit 9 and the wire 8, which is easy. Further, it is possible to move the bore pipe 11 in the drilled hole by the lifting device.
  • Reference numeral 29 indicates an insulating component.
  • the insulating component 29 has a shape in which a force having one through hole 29b at the bottom is inverted.
  • a flange 29c is provided around the opening of the snap-type green part 29. The flange 29c is joined to the flange 21a of the ground pipe 21 of the bore pipe.
  • a high-voltage conductor 30 is housed in the insulating component 29, and is inserted and fixed in the through-hole 29b so that its upper end slightly protrudes from the through-hole 29b.
  • a current cable 31 is connected to an upper end 30b of the high-voltage conductor 30, and a high-voltage pipe 20 of a bore pipe is connected to a lower end.
  • the insulating component 29 is coated by applying a semi-conductive material to at least its outer surface 29a.
  • the semiconductive material-coated surface 29a of the insulating component 29 has a ground pipe 21 of a bore pipe and electrical contacts 29e at the flanges 21a, 29c.
  • the surface 30a of the high-voltage conductor 30 is also coated with a semiconductive material.
  • the semiconductive material-coated surface 30a of the high-voltage conductor 30 and the semiconductive material-coated surface 29a of the insulating component 29 have an electrical contact 29d at the fixed part of the high-voltage conductor 30 of the insulating component 29.
  • the semiconductive material include mixed and mixed materials of solvents such as polyethylene and graphite.
  • a high voltage input test was performed by the high voltage input unit 9 having the above structure.
  • the insulation part 29 and the high-voltage conductor 30 were made of high-density polyethylene.
  • the diameter of the high voltage wire 30 was 4 ⁇ , and the height of the high voltage wire 30 was 220tnm.
  • the 31 diameter of the current cable was 15 members.
  • the diameter of the flange 29c of the insulating part 29 was 160.
  • the resistance between the contact 29e and the contact 29d on the semiconductive material-coated surface 29a is 1.21 ⁇ , and the resistance between the upper end 30b of the high-voltage conductor 30 which is the connection surface with the current cable 31 and the contact 29d
  • the resistance was also 1.2k Q. That is, the semiconductive material-coated surface 30 All the electrical resistances of a and 29a were 2.
  • test voltage was applied between the high-voltage pulse generator and the current cable. It was stepped up to 350kV to 880kV step by step. The interval between voltage pulses was 1.5 microseconds.
  • the high voltage input section 9 coated with semiconductive material was able to withstand a load voltage 2.7 times higher than that without the semiconductive material coating at the load voltage.
  • Fig. 5 (a) and Fig. 5 (b) explain the discharged mud collecting device that constitutes the discharged liquid circulation system.
  • Fig. 5 (a) and Fig. 5 (b) show the discharged mud collecting device attached to the bore pipe, and its sectional view. R in the figure indicates the boretop diameter.
  • the discharged mud collecting device has two discharged liquid supply paths 32a, 32b and two collected paths 33a, 33b for pumping discharged mud together with the discharged liquid.
  • the two discharge liquid supply passages 32a and 32b are provided with an inner pipe 34 provided concentrically with the ground pipe 21 of the bore pipe, and two outer walls having a circular arc-shaped cross section located in the radially expanding direction of the inner pipe 34.
  • the cross-section formed by 35 and four partition walls 36 erected from the inner pipe 34 in the radially expanding direction to connect the two outer walls 35 and the inner pipe 34 is a fan-shaped space. .
  • the two collection paths 33a and 33b are grooves sandwiched between the two drainage supply paths 32a and 32b. In other words, this discharge mud collector forms a collection path without using pipes for the collection path.
  • a plurality of elastic valves 37 made of rubber or the like are provided in the two collecting paths 33a and 33b in the vertical direction on the surface of the inner pipe 34. .
  • the crushed debris goes up through the elastic valve 37 even if it is a large mass.
  • the speed of the discharged mud suddenly decreases and the discharged mud speed becomes insufficient, the discharged mud falls on the elastic valve 37 and does not flow backward.
  • the two collection paths 33a and 33b are grooves between the two discharge liquid supply paths 32a and 32b and do not use a pipe for the collection path, they fall on the elastic valve 37. Large chunks can be comminuted by known techniques.
  • the characteristics of electric pulse drilling are that the crushed fragments may be large clumps.
  • the large mass prevents the speed of the discharged mud from suddenly decreasing and the pipes for the collecting passage from being broken even if the collecting passage is blocked.
  • FIG. 6 is a schematic diagram showing a mounting structure of the bore top 12 to the bore pipe 11. R in the figure indicates the bore top diameter.
  • the bore top 12 is screwed to the tip of the ground pipe 21 of the bore pipe 11.
  • the threaded portion of the bore 12 is provided with a horizontal opening 38 having a predetermined length.
  • This horizontal opening 38 is provided with two detents 39a and 39b. Have been.
  • the distance between the two detents 39a, 39b is shorter than the length of the horizontal opening 38 to allow the rotation of the bore 12 about its axis.
  • the possible distance of rotation of the bore top 12 about its axis is determined by the difference between the length of the horizontal opening 38 and the distance between the two detents 39a, 39b.
  • the difference is preferably not less than the distance between the electrodes.
  • the reason why such a horizontal opening 38 is provided is as follows.
  • Fig. 7 shows a bore-top electrode structure that can cut a large-diameter hole while minimizing the number of electrodes.
  • the bore top is composed of two high-voltage electrodes 18 and two ground electrodes 17. Electrodes are placed on each intersection of the grid. Here, since there are four electrodes, they are arranged at each vertex of the square. As described above, since the electrode arrangement is rectangular, the bore diameter is set to the maximum diameter R.
  • the bore top of the above structure is movable around the axis 0 of the borehole. The bore top can be moved by the flow of the discharged liquid or the discharge energy.For example, the arm 28a at the tip of the column 28 of the elevating device shown in FIG. By making the arm rotatable around 90 ° around it, the bore pipes 11 can move together and the bore top can be reliably moved to a predetermined position.
  • Fig. 8 shows the tip structure of an electrode suitable for excavating an excavated object having such a large diameter core.
  • the tips of the high voltage electrode 18 and the ground electrode 17 are bent toward each other. The bending angle should be less than 90 °.
  • the central core having a diameter of 600 mm was crushed by a total of 100 pulses. This method improved the excavation efficiency by 30%.
  • FIG. 9 is a graph showing the power consumption W with respect to the load voltage U1.
  • Equation (1) which is one of the excavation methods according to the present invention, determines the value of the load voltage U1 at which the power consumption W is likely to be the minimum, and the load voltage range including those values is 250.0 to 500.
  • the load voltage was changed intermittently at 0 [kV], and the power consumption W at that time was measured.
  • the power consumption W became minimum when the load voltage U1 was 370 to 390 [kV]. Therefore, the load voltage U1 was set to 370 [kV].
  • FIG. 10 is a graph showing the power consumption W of the pulse voltage generator with respect to the capacitance C when the load voltage U1 is 370 [kV].
  • Equation (2) which is one of the excavation methods of the present invention, a single pulse energy W that is likely to minimize the power consumption W. Seeking value in the range of those of a single pulse energy W causes a 0 pulse voltage generator including a capacitor Nsu c near the center value of Kiyapashita Nsu C for intermittently changing the power consumption at that time W was measured.
  • the capacitance [: strong, 0.014 [ ⁇ P] the power consumption W became minimum.
  • FIG. W o a graph showing the single pulse energy with respect to the distance between the electrodes is shown in FIG. W o ⁇ 90 mm • s —
  • the graph of equation (3) is shown as a guideline for obtaining the optimal conditions.
  • the shaded area indicates the energy required to destroy rocks with electrical pulses, according to patents by Kretz, Druzon, and others (dated September 13, 1995).
  • the present invention is most suitable as an excavation method and an excavator capable of efficiently excavating with minimum power consumption.

Description

明 細 書 電気パルスによつて掘削する方法及び掘削機 技術分野
この発明は、 絶縁固体物の掘削、 油 · ガス等の採掘、 土木建設等に関 係する。 背景技術
電気パルスで掘削する方法、 及び、 掘削機は従来から知られている。 例えば、 Vaj ov V. F. . S i omk in B. V. , Adam A. Μ に依る岩盤や人造物の電 気パルスによる破砕の最適化について、 トムスク州立大学 1996年発行" 物理学" No. 4に記載されている。
この方法によれば、 ボア ト ップは排出液中にある岩盤の上に置かれる 。 マイ クロ秒の間隔で高圧電気パルスが電極に負荷される。 電気放電が 岩盤を通り、 破壊され粉砕される。 破壊にいたるパルス時間は電極間距 離によって決められる。 この方法の欠点は、 掘削の効率を上げる方法が 電極間距離というただひとつのパラメータ しか無いことである。
他の従来の掘削機は、 高圧パルス発生源、 ボアパイプ、 ボア ト ップと から構成されている。 ボアパイプは同心円上にアース外管、 内側の高圧 パイプが配置されてなり、 先端にボア ト ップを有する。 この掘削機の欠 点は掘削の最適条件の設定の設備が付加されていない。
他の公知の方法及び掘削機として、 B. V. シォムキン、 A. P.ゥソ フ、 V. しバセス著による '電気パルスによる材料破砕' が知られている( ナウ 力出版、 1995年 P7 - 11, 34-62, 220-224, 11 - 16, 231-240) 0
この試験的方法によれば、 破砕される岩石は液体中に浸される。 その 液体は、 高圧電気パルスの選定されたパルスにおいて絶縁体となる。 電 気パルスは岩盤上に設置された電極に付加される。 そして、 絶縁流体の 中に浸された岩盤中を電気放電が発生する。 この方法の欠点は、 岩盤破 砕の最適条件が 2つの電極間の岩塊にのみ充足される事であって掘削と は大き く ことなる。
他の既知の掘削機は、 ボア ト ップとボアパイプ、 高圧電源から構成さ れる。 掘削穴の入り口にガイ ドが付けられ、 昇降装置もがつけられてい る。 掘削穴の排出液は、 排出液サイク σンをなし、 排出物タンクにつな がる。 高圧パルスはボアパイプの高圧パイプに付加される。
この掘削機の欠点は掘削穴の構造が十分でなく、 最大効率に十分に達 しないことである。
上記従来の問題に鑑みなされたもので、 本発明の目的は、 最小の電力 消費量によつて、 効率良く掘削することの可能な掘削方法及び掘削機を 提供することにある。 発明の開示
本発明の掘削方法は、 排出液が導入された掘削穴中に存在する被掘削 物を高電圧パルスによる複数の電極間放電によって破壊する掘削方法の 一種であり、 掘削効率に関する次のパラメ一タの少なく とも一つを、 掘 削に関する電力消費量を最小とするのに最も適した値に選定して掘削す る方法である。
i ) 被掘削物の破壊に要する負荷電圧
ϋ ) 単一パルスエネルギー
iii ) 排出液の量
具体的に、 前記被掘削物の破壊に要する負荷電圧の場合は、 前記被掘 削物の破壊に要する負荷電圧の最適値を次式(1) によって推定し、 それ らの推定された負荷電圧値 inを中心付近に含む負荷電圧の範囲内で、 連 続的或いは断続的に負荷電圧を変化させることによって被掘削物の破壊 に要する負荷電圧の最適値を見いだす。
1
υι= κ( )。· 15X U。X L°- [kv] (1) η - 1
において
κ: 係数、 Κ=1·0〜1.5 [Ι/cra0· 4]
n: 電極の数
L: 電極間距離 [cm]
Uo 実験で得られる数値、 排出液中にある被掘削物のサンプルの表面 に置かれた電極間距離 lcm の 2本の電極が前記サンプルを放電破壊する 時の電圧 [kv]。
前記単一パルスエネルギ一の場合は、 前記単一パルスエネルギ一の最 適値を次式(2) よって推定し、 その推定された単一パルスエネルギー値 W0を含む単一パルスエネルギーの範囲内で、 連続的或いは断続的に単一 パルスェネルギ一を変化させることによつて単-一パルスエネルギ一の最 適値を見いだす。
Wo>90L'-6 [J] (2) 前記排出液の量の場合は、 前記排出液の量の最適値を、 次式(3) によ つて推定し、 それらの推定された排出液の量値 Q を含む排出液の量の範 囲内で、 連続的或いは断続的に排出液の量を変化させることによつて排 出液の量の最適値を見いだす。
7Γ XDb2
Q=(0.25〜0.5) X f [リ ツター/ 分] (3)
4
Db: ボア ト ツプの径 [cm]
f: 1 秒当たりのパルス数 (パルスの周波数) 上記本発明の掘削方法によれば、 i ) 被掘削物の破壊に要する負荷電 圧、 ii ) 単一パルスエネルギー、 ) 排出液の璗という掘削効率に関す るパラメータの少なく とも一つを、 掘削に関する電力消費量を最小とす るのに最も適した値に選定して掘削するので、 電力消費量を最小に抑え て、 効率良く掘削することが可能となる。
更に、 上記掘削効率に関するパラメータの電力消費量を最小とするの に最も適した値を上記式(1),(2) , (3) によって、 予め推定して掘削を試 みるので最適値を見いだすための試験回数をできるだけ最小に抑えて効 率良く最適値を見いだすことができる。
また、 本発明の掘削機は、 排出液が導入された掘削穴中に存在する被 掘削物を高電圧パルスによる複数の電極間放電によって破壊する掘削機 1 であり、 高電圧パルス発電機と、 前記高電圧パルス発電機からの高電 圧が少なく とも一つに入力される複数の電極と、 排出液循環システムと 、 最適条件設定装置とを備えている。
前記最適条件設定装置は、 前記高電圧パルス発電機と前記複数の電極 の間に接続され、 若しく は、 前記排出液循環システムの中に組み込まれ 、 或いは、 前記高電圧パルス発電機と前記複数の電極の間に接続され且 つ前記排出液循環の中に組み込まれて、 掘削に関する電力消費量が最小 となるように、 掘削効率に関する次のパラメ一タの少なく とも一つの最 適化を行う。
i ) 被掘削物の破壊に要する負荷電圧
ii ) 単一パノレスエネノレギ一
iii ) 排出液の量
上記本発明の掘削機によれば、 i ) 被掘削物の破壊に要する負荷電圧 、 ii ) 単一パルスエネルギー、 iii ) 排出液の量という掘削効率に関する パラメータの少なく とも一つを、 掘削に関する電力消費量を最小とする ように最適化を行うので、 電力消費量を最小に抑えて、 効率良く掘削す ることが可能となる。
更に、 本発明の掘削機は、 前記高電圧パルス発電機と前記複数の電極 の間で前記高電圧を電極に伝達するために、 その一端側が高電圧パルス 発電機に接続され、 他端側が複数の電極に接続されているボアパイプを 備えている。 前記ボアパイプは、 高電圧用パイプと、 該高電圧用パイプ の外側に同心円状に重ねられたグランド用パイプを有しており、 前記ボ アバイプの前記グランド用パイプの内側と前記高電圧用パイプの外側は 非磁性の電気電導性の高い材料でメ ツキされている。
このような非磁性の電気電導性の高い材料によるメ ツキは、 掘削穴が 深く なれば、 パルス上昇時間が増加し電圧幅が減少するという現象を顕 著に低減する。 そのため、 掘削穴が深くなつても、 パルスの状態を余り 変える必要が無く、 掘削機の安定した運転が行える。
加えて、 本発明の掘削機は、 前記ボアパイプを地中に案内するために 、 前記ボアパイプの周囲に設けられたガイ ドとを備えている。 前記ボア パイプと前記ガイ ドは、 前記ボアパイプが前記ガイ ド内を上下方向にス ライ ド可能なように、 スライ ド接点を介して接続されている。
このようなガイ ドとボアパイプとを接続する接点は、 ガイ ドとボアパ ィプとの間の電位差による空気ギヤ ップの破壊を防止する。
また、 本発明の掘削機において、 前記高電圧パルスを生じさせるため の高圧パルス電源回路は、 ィ ンダクタ一蓄電器と半導体整流器とを組み 合わせたィ ンダクタ一蓄電型高圧パルス電源回路である。
このような電源回路は、 電源回路に半導体整流器を使用しない従来の 掘削機に比べ、 形状、 重量が半分になり、 そのため掘削機が移動可能に なり、 更に、 キャパシター及び球ギャ ップの数も減少し、 キャパシタ一 電圧も低下できるので高圧パルス電源回路の寿命が長く なるという利点 がある。
更に、 本発明の掘削機は、 垂直に立設されている前記ボアパイプを上 下動させるための、 吊り上げ手段を有する昇降装置を備え、 前記ボアパ ィプに高電圧を入力するための高電圧入力部が、 ボアパイプの一端側で あってボアパイプの軸から所定角度傾いた位置に設けられている。 上記のような高電圧入力部の取付位置は、 高電圧入力部がボアパイプ の同軸上に有るよりも、 昇降装置のワイヤー等の吊り上げ手段がボアパ イブに繋がれることを容易にする。 そして、 ボアパイプの昇降装置によ る掘削穴への設置や、 掘削穴からの引き上げも、 高電圧入力部とワイヤ 一等の吊り上げ手段との接触を気にせずに行え、 容易となる。 更に、 昇 降装置よつてボアパイプを掘削穴の中で移動することも可能となる。 加えて、 本発明の掘削機は、 前記高電圧パルス発電機と前記複数の電 極の間で前記高電圧を電極に伝達するために、 高電圧用パイプと、 該高 電圧用パイプの外側に同心円状に重ねられたグランド用パイプを有し、 その一端側が高電圧パルス発電機に接続され、 他端側が複数の電極に接 続されているボアパイプとを備えている。 そして、 前記ボアパイプに高 電圧を入力するための高電圧入力部の外表面が半導電性材料で被覆され グランド用パイプと電気的に接続されている。
このように半導電性材料で被覆をした高電圧入力部は、 半導電性材料 による被覆の無いものと比べ高圧の負荷電圧に耐えられる。
また、 本発明の掘削機は、 前記ボアパイプに取り付けられた排出泥収 集装置とを備えている。 前記排出泥収集装置は、 ボアパイプと同心円上 に設けられた断面が扇型のパイプによって形成される排出液供給路と、 該排出液供給路に挟まれた溝によって形成される収集路を有し、 前記収 集路には、 弾性体弁が排出泥収集方向に沿って複数設けられている。 このような構造の排出泥収集装置は、 排出泥の収集速度が不十分とな つた場合でも、 排出泥は弾性体弁の上に落ちるので、 逆流することはな い。 更に、 前記収集路は、 前記排出液供給路の間の溝であって収集路用 のパイプ等を使用していないので、 弾性体弁の上に落ちた大きな固まり は、 既知の技術で容易に細粉することができる。 その結果、 パイプ等に よって形成された収集路を有する従来の排出泥収集装置のように、 大き な固まりによる収集路の閉塞が生じて収集路用パイプ等の破壊が起き、 そのため、 排出泥収集装置そのものの破壊が生じてしまうという恐れが 無くなる。
更に、 本発明の掘削機は、 前記高電圧パルス発電機からの高電圧が少 なく とも一つに入力される複数の電極を有するボア ト ップと、 前記高電 圧パルス発電機と前記ボア ト ップの間で前記高電圧を電極に伝達するた めに、 その一端側に高電圧パルス発電機が接続され、 他端側に前記ボア ト ップがネジ止めされているボアパイプとを備えている。 前記ボア ト ッ プのネジ部には所定長を有する水平開口部と、 この水平開口部の中の 2 つの回り止めが設けられている。 そして、 この 2 つの回り止め間の距離 は、 ボア ト ップのその軸を中心とした回転を可能とするために、 前記水 平開口の所定長よりも短い距離である。
上記のような水平開口部及び回り止めが設けられたボア ト ップは、 そ の軸を中心とする回転が可能となる。 そのため、 掘削の衝撃波や排出泥 の衝擊によってボアパイプとボア ト ップの連結部に捻じれが生じること が防止される。 そして、 ボア ト ップは底部で所定の位置を保持し、 岩盤 堀削の効率上昇をもたらす。
加えて、 本発明の掘削機は、 前記ボア ト ップは、 格子の各交点上に電 極を配備し、 掘削穴の中を移動可能である。
上記のように格子の各交点上に電極を配備すると、 格子上に電気放電 がおこり、 結果として格子に囲まれた部分に出っ張った岩盤にも破砕が 起こり、 効率良く岩盤を破壊する。 そして、 ボア ト ップが移動可能であ ると、 ボア ト ップが移動する事で直径の異なる穴を堀削する事ができる また、 本発明の掘削機は、 前記高電圧が入力される高圧電極と他の電 極とは、 それらの先端が互いに相手に向かって屈曲している。
このような構造を有する電極は、 大きな径のコアを有する被掘削物の 掘削に適する。 図面の簡単な説明
第 1図は本発明の掘削機の構成を示す図であり、 第 2図は本発明の掘 削機の電源回路を示す図であり、 第 3図は本発明の掘削機における高電 圧入力部の取付位置を示す図であり、 第 4図は本発明の掘削機における 高電圧入力部の構造を説明する図であり、 第 5図(a) 及び第 5図(b) は 排出液循環システムを構成する排出泥収集装置を説明する図であり、 第
6図はボア ト ツプのボアパイプへの取付構造を示す模式図であり、 第 7 図はボア ト ップの電極構造を示す図であり、 第 8図は電極の先端構造を 示す図であり、 第 9図は負荷電圧 U1に対する電力消費量 W を示すグラフ であり、 第 1 0図は負荷電圧 U1を 370 [kV]とした場合のパルス電圧発電 機のキヤパシタ ンス C に対する電力消費量 W を示すグラフであり、 第 1
1図は電極間距離 L に対する単一パルスエネルギーを示すグラフである
発明を実施するための最良の形態
本発明の掘削方法を具体的に説明する。
( i ) 最初に、 被掘削物のサンプルを用いて U oを求めた。 ここで、 U 0は 、 排出液中にある被掘削物のサンプルの表面に置かれた電極間距離 lctn の 2本の電極が前記サンプルを放電破壊する時の電圧 [kv]である。
被掘削物のサンプルとしてミ クロク ォーツザィ ト (鉱物名一水晶石) を用いた。 このサンプルをディ ーゼルオイルの中に浸した。 サンプルの 表面に 2本の電極を設置した。 この時の電極間距離 1cmであった。 一方 の電極は接地され、 他方の電極には高電圧が負荷された。 同様の条件で サンプルを 5回破壊した。 ここで、 どのような種類のサンプルであって もも実験回数は、 5乃至 10回は必要である。 また、 非均質のサンプルの 場合は、 更に、 サンプル数を増やして実験をすることが望ましい。
5 回のサンプル破壊の結果、 U。=190 [kV] という平均値を得た。
次に、 電極数 n が 7本、 電極間距離し が各 4cra の掘削機を用いて、 岩 盤の掘削を行った。 従って、 負荷電圧 U 1は、 式(1) から 252. 8 〜379. 3 [kV]となった。 掘削は、 これらの値を中心付近に含む負荷電圧の範囲 22 0. 0 〜490. 0 [kV]で負荷電圧を連続的或いは断続的に変化させ、 その時 の電力消費量 W を測定しつつ行った。 その結果は表 1に示す通りであつ た。 負荷電圧 U1が、 380 [kV]の時に、 電力消費量 W が最小となった。 本発明の掘削方法においては、 電力消費量 W が最小となるこの最適負 荷電圧値 ΙΠを用いて掘削を行う。 この最適負荷電圧値 U1の用い方として 、 掘削作業の最初に負荷電圧 U 1の最適値を選定した後は、 全掘削作業中 、 その値を一定にして掘削作業を行う方法は簡単でよい。 しかし、 より 効率をあげるためには、 前記式(1) によって得られる負荷電圧値 U1を含 む負荷電圧の範囲内で負荷電圧を変化させ、 電力消費量 W を最小とする 最適負荷電圧を見いだす工程を掘削機の運転中に定期的に或いは連続的 に行って、 常に、 電力消費量 W を最小とする最適負荷電圧によって掘削 を行う方がよい。 表 1
Figure imgf000012_0001
ここで、 上記表 1について更に詳述する。
岩盤の破砕はパルスの上昇時におこつた。 岩盤の破砕は幾つかの要素 に依存し、 主なパラメータは電極間の電圧であった。 U 1=220I Vにおいて 、 放電はなく、 岩盤は破壊されなかった。 これ以上の電圧において放電 が観察されたが放電貫通による破壊の確立は 100 %以下であった。
電圧上昇は放電貫通の確率を上昇させ、 破壊の確率を上昇させた。 し かしながら、 多くの場合、 エネルギーの最大使用状況での掘削が放電貫 通の確率を最大とするわけでは無い。 その理由として絶縁破壊の増加、 パルス電圧発電機の信頼性の低下が挙げられる。 これが、 教示された式 (1) において最大の U l、 即ち、 379. 3 [kv] 付近で最大効率になる理由 である。
実際には、 表 1に示すように、 380 [kV] において岩盤破壊のエネル ギ一消費は最小となつた。 この条件下で破壊電圧は最大効率と考えられ る。 U1 > 3801 V において電力消費量が増加する主たる理由は排出泥の再 破壊である。
( ii ) 次に、 負荷電圧を 380 [kV]とし、 電極間距離を 4cm として単一パ ルスエネルギーを 250 〜1550 [J]の間で連続的或いは断続的に変化させ 、 電力消費量 W を測定しつつ砂岩の掘削を行った。 単一パルスエネルギ —はパルス電圧発電機の +ャパシタンスを変えることにより変化させた 。 前記単一パルスエネルギーの範囲 250 〜1550 [J]は、 式(2) Wo≥90L ' • 6から得られる単一パルスエネルギーを含む範囲であった。 その結果は 表 2に示す通りであった。 単一パルスエネルギ一 W。が 880 〜1100 [J]の 時に、 電力消費量 w が最小となった。
本発明の掘削方法においては、 電力消費量 W が最小となるこの最適単 一パルスエネルギー値 Woを用いて掘削を行う。 この最適単一パルスェネ ルギ一値 Woの用い方として、 掘削作業の最初に単一パルスエネルギーの 最適値を選定した後は、 全掘削作業中、 その値を一定にして掘削作業を 行う方法は簡単でよい。 しかし、 より効率をあげるためには、 前記式(2 ) によつて得られる単一パルスエネルギ一Woを含む単一パルスエネルギ 一の範囲内で単一パルスエネルギーを変化させ、 電力消費量 W を最小と する最適単一パルスエネルギーを見いだす工程を掘削機の運転中に定期 的に或いは連続的に行って、 常に、 電力消費量 W を最小とする最適単一 パルスエネルギーによって掘削を行う方が良い。
表 2
Figure imgf000013_0001
ここで、 上記表 2について更に詳述する。
掘削の適正な条件設定は掘削効率を上昇させ、 破壊に必要な ネルギ 一を低下させる。 表 2 において、 このことは明白である。 単一パルスェ ネルギ一 Woの上昇は電力消費量 W の低下をもたらした。 更に、 単一パル スエネルギー W oを増加すれば、 排出泥の再破砕により電力消費量 w は増 加する。 パルス電源からの最大効率の放電エネルギーを決定することに より電力消費量を 2/3 以下に低下させることができる。
( iii ) 次に、 単一パルスのエネルギーを 850 [J] とし、 電極間距離 4cra とし、 ボア ト ップ径 110 [mm]とし、 パルス周波数 ί は 1〜9 として式(3 ) から排出液の量 Q を計算した。 ここで、 パルス周波数 f を 1〜9 とし た理由は、 掘削率は毎秒当たり 9 までのパルス周波数 f に直接比例し、 これ以上周波数を増加すると掘削効率の低下を招くからである。 上記式
(3) によつて得られた値を含む排出液の量の範囲で排出液の量を連続的 或いは断続的に変化させ、 その時の電力消費量 W を測定しつつ水晶石の 掘削を行った。 その結果、 排出液の量 Q は、 450 [リ ッタ一 / 分] が最 適であることが見いだされた。
本発明の掘削方法においては、 電力消費量 W が最小となるこの最適排 出液の量値 Q を用いて掘削を行う。 この最適排出液の量値 Q の用い方と して、 掘削作業の最初に排出液の量の最適値を選定した後は、 全掘削作 業中、 その値を一定にして掘削作業を行う方法は簡単でよい。 しかし、 より効率をあげるためには、 前記式(3) によって得られる排出液の量 Q を含む排出液の量の範囲内で排出液の量を変化させ、 電力消費量 W を最 小とする最適排出液の量を見いだす工程を掘削機の運転中に定期的に或 いは連続的に行って、 常に、 電力消費量 W を最小とする最適排出液の量 によって掘削を行う方がよい。
次に、 本発明の掘削機を第 1図乃至第 8図を参照しつつ説明する。
(掘削機構造)
第 1図において、 掘削機 1 は、 高電圧パルス発電機 2 と、 ボア部 9, 10 ,11, 12と、 排出液循環システム 3, 4, 5a, 5b と、 最適条件設定装置 13, 14, 15, 16 と、 昇降装置 6, 7, 8 とから構成される。
ボア部は、 高電圧入力部 9 と、 ボアパイプ 11と、 前記ボアパイプ 11を 地中に案内するために前記ボアパイプ 11の周囲に設けられたガイ ド 10と 、 前記ボアパイプ 11の先端に設けられたボア ト ップ 12とを含む。
ボアパイプ 11は、 高電圧用パイプ 20及び前記高電圧用パイプ 20の外側 に同心円状に重ねられたグランド用パイプ 21から構成されており、 ガイ ド 10内で上下方向にスライ ド可能な構造である。 高電圧用パイプ 20と、 グランド用パイプ 21は、 中間絶縁材 22a, 22b で仕切られた構造になって いる。 ダラン ド用パイプ 21の内側と高電圧用パイプ 20の外側は非磁性で 電気電導性の高い材料でメ ツキされている。 非磁性で電気電導性の高い 材料としては、 例えば、 ジュラルミ ン、 銅、 真鍮、 アルミ ニウム等が挙 げられる。 これは、 掘削穴が深く なれば、 パルス上昇時間が増加し電圧 幅が減少するという現象を低減するために行うもので、 そのメ ッキの厚 さは 0. lmm 以下程度で十分である。
グランド用パイプ 21がガイ ド 10内を上下にスライ ド可能なように、 ガ ィ ド 10とグランド用パイプ 21は、 スライ ド接点 23を介して接続されてい る。 これは、 高電圧パルス発電機 2 とボア部の放電回路は、 接地されて もされなくても良いが、 ガイ ド 10とグランド用パイプ 21は、 接続されて いる必要があるからである。
ダランド電極 17と高電圧電極 18との間の放電は排出液に対しても起こ りうるので、 ガイ ド 10とグランド用パイプ 21の間で電圧が存在すると、 空気ギャ ップの破壊が起こることがある。 そのため、 高電圧パルス発電 機 2 とボア部の放電回路をこの空気ギヤ ップによる破壊から保護するた めに、 ガイ ド 10とグランド用パイプ 21は、 排出液の出側のスライ ド接点 23を介して接続されている必要があるのである。
ボア ト ップ 12は、 グランド電極 17及び高圧電極 18から構成されている 。 グランド電極 17と高圧電極 18はボア ト ップ絶緑材 19で仕切られている 尚、 電極数については、 後で述べるように、 グラ ン ド電極 17及び高圧電 極 18が各一つづつとは限られない。
排出液循環システムは、 排出液タ ンク 3 と、 排出液ポンプ 4 と、 排出 液用パイプ 5a, 5b とを含む。 この排出液循環システムによって、 排出液 は、 排出液タ ンク 3 からポンプ 4 、 排出液用パイプ 5a, 5b を通ってボア 部に、 また、 ボア部からグランドバイプ 21の外側と掘削穴の隙間からガ ィ ド 10を通して排出液タ ンク 3 に帰り循環する。 最適条件設定装置は、 負荷電圧や単一パルスエネルギー等を調整する ための負荷電圧等調整装置 13と、 パルス電流トランス等の電力消費量計 測装置 14と、 排出液用制御装置 15と、 最適条件設定用制御装置 16とを含 む。 最適条件設定用制御装置 16は、 前記負荷電圧等調整装置 13と、 前記 電力消費量計測装置 14と、 前記排出液用制御装置 15とに接続されている 。 この最適条件設定用制御装置 16は、 定期的或いは連続的に、 電力消費 量が最小となるように、 掘削条件の最適化を行う。 前記掘削条件の最適 化を行うためのパラメ一ターとしては、 岩盤破壊に要する負荷電圧、 単 一パルスエネルギー、 排出液の量等がある。
排出液用制御装置 15は、 排出液用パイプ 5a, 5b の中に組み込まれ、 前 記最適条件設定用制御装置 16に従って、 排出液パラメ ータの定期的或い は連続的制御を行う。 排出液パラメータとしては、 流体の特性( 体積電 導率、 流量、 構造等の機械的特性等) と作動状況等がある。
昇降装置は、 ウイ ンチ 6 、 プ一リ 7 、 ワイヤー 8 等のボアパイプ 11を 吊り上げるための手段を含む。
上記構造の掘削機 1 による作動を説明する。 ガイ ド 10によってボアパ ィプ 11が地中に案内されるように、 ボア部を掘削穴の底部に設置する。 排出液は、 排出液循環システムによって、 排出液タ ンク 3 からポンプ 4 、 排出液用パイプ 5a, 5b を通ってボア部に、 また、 ボア部からグランド パイプ 21の外側と掘削穴の隙間からガイ ド 10を通して排出液タ ンク 3 に 帰り循環する。 高電圧パルスは、 高電圧パルス発電機 2 から高電圧入力 部 9 を介して高電圧パイプ 20、 ボアト ップの高圧電極 18に負荷される。 電気放電が高圧電極 18とグンランド電極 17の間でおこる。 放電が岩盤を 貫通し岩盤は破壊される。 破壊された岩盤は排出液循環システムによつ て、 排出液と共に掘削穴から除去される。
そして、 昇降装置は、 ボア部を下方へ降ろして掘削穴の新たな底部に 再び設置する。 この時、 ボアパイプ 11は、 ガイ ド 10によって地中に案内 されながらガイ ド 10の内側壁に沿って下方ヘスライ ドする。 以上のよう な作業を繰り返しながら掘削作業が進む。
この間、 最適条件設定制御装置 16は、 電力消費量が最小となるように 、 岩盤破壊に要する負荷電圧及び単一パルスエネルギーと排出液の量を 、 定期的に或いは連続的に、 岩盤破砕に最適なように決定する。 そして 、 排出液制御装置は、 最適条件設定制御装置からの指令に基づき流体の 特性 (体積電導率、 流量、 構造等の機械的特性等) と作動状況を決定す る。
このように、 本発明の掘削機 1 によれば、 最適条件設定制御装置が、 電力消費量が最小となるように、 定期的或いは連続的に、 岩盤破壊に要 する負荷電圧、 単一パルスエネルギー、 排出液の量等の掘削条件の最適 化を行うので、 効率の良い掘削が自然条件に適して行う ことができる。 また、 ダランド用パイプ 21の内側と高電圧用パイプ 20の外側は非磁性 で電気電導性の高い材料でメ ツキされているので、 掘削穴が深く なつて も、 パルス上昇時間が増加し電圧幅が減少するという現象を顕著に低減 するので、 パルスの状態を余り変える必要が無く、 掘削機の安定した運 転が行える。
更に、 ガイ ド 10とグランド用パイプ 21は、 排出液の出側のスライ ド接 点 23を介して接続されているので、 ガイ ド 10とグランド用パイプ 21の間 の電位差による空気ギヤ ップの破壊が起こることも無い。
尚、 本発明の掘削器 1 は、 岩盤等の絶縁固体物の掘削に限らず、 油 - ガス等の採掘、 土木建設等にも用いることができる。 従って、 掘削対象 となる被掘削物は、 岩盤に限られるものではない。
(高圧パルス電源回路)
第 2図によって、 本発明の掘削器 1 に用いられた高圧パルス電源回路 を説明する。 これは、 半導体整流器を使用したイ ンダクター蓄電型高圧 パルス電源回路である。 高圧パルス電源回路は、 高圧キャパシター 24、 球ギヤ ップ 25、 ィ ンダクタ一蓄電器 26、 ダイォード等の半導体整流器 27 を含む。 図中にはボア ト ップ 12の電極 17, 18 と岩盤も示されている。 この高圧パルス電源回路は、 次のようにして作動する。 高圧キャパシ タ一 24に並列に電源を接続すると、 高圧ヰャパシタ一24に電圧が蓄積さ れる。 この時、 ボア ト ップ 12の一方の電極 17の方へ流れようとする電流 は、 ダイオー ド 27によってイ ンダクタ一蓄電器 26に導かれ、 イ ンダク タ一蓄電器 26にも電圧が蓄積され昇圧される。 高圧牛ャパシター 24に球 ギヤ ップ 25が作動するのに十分な電圧が蓄えられると、 球ギヤ ップ 25に おいてギヤ ップ破壊が起こり通電する。 高圧パルス電源回路が通電する と、 図中の矢印 i 2に示すように、 イ ンダクタ一蓄電器 26において昇圧さ れた高圧電流及びダイォ一ド 27からの電流がボア ト ップ 12の他方の電極 18に流れる。 そして、 ボア ト ップ 12の電極 17, 18 間に放電がおこり岩盤 が破壊される。 上記作動を繰り返し行う。
ここで、 ダイォー ド 27によってボア ト ップ 12の電極 17への電流の流れ を遮断し、 高圧キャパシター 24に球ギヤ ップ 25が作動するのに十分な電 圧を蓄える時間は、 ナノ秒の僅かな時間である。 この僅かな時間に、 ィ ンダクタ一蓄電器 26の電圧は昇圧される。 この昇圧は、 イ ンピーダンス 等の条件設定を適切に行うと、 高圧キャパシタ一24にかかる負荷電圧よ り 3〜3. 5 倍高い電圧まで上昇させることができる。
ィ ンダクタ一蓄電器 26とダイォ一ド 27とを組み合わせた上記構成の高 圧パルス電源回路によると、 電源回路にダイォ一ド 27を使用しない従来 の掘削機に比べ次のような利点がある。 形状、 重量が半分になり、 掘削 機を移動可能にし、 キャパシター及び球ギャ ップの数が減少し、 キャパ シター電圧も低下させられるので高圧パルス電源回路の寿命が長くなる また、 パルス電源はィ ンダクタ一蓄電器と固体整流器を使用すること で、 形状、 寸法を従来のものより遙に小さくできる。 これらはボアの中 、 特にボア ト ップ近傍に配置できる。 イ ンダクタ一蓄電型高圧パルス電 源回路は、 この他に掘削穴中のボア ト ップにまで浸漬できる。 この事は 深い穴を掘削する際に重要であり、 電導度の高い排出液、 例えば、 水を 使用するときに特に重要である。
キヤパシタ ンスを変えることによって単一パルスのエネルギーをかえ ることができる。
(高電圧入力部)
第 3図及び第 4図によって、 本発明の掘削機における高電圧入力部 9 の好ましい取付位置及び構造を説明する。
第 3図において、 支柱 27、 ウイ ンチ 6 、 ワイヤ一 8 は昇降装置を構成 している。 本発明の掘削機は高電圧入力部 9 がボアパイプ 11の軸から所 定角度 傾いた位置に取り付けられている。 前記所定角度 αは、 ボアパ イブ 11の軸に対して 30° < < 150° の範囲にあることが望ましい。 昇降装置のワイヤ一 8 はボアパイプ 11に繋がれている。 ボアパイプ 11は ガイ ド 10によって地中に案内されてガイ ド 10に沿って上下動可能である 上記のような高電圧入力部 9 の取付位置は、 高電圧入力部 9 がボアパ イブ 11の同軸上に有るよりも、 昇降装置のワイヤ一 8 がボアパイプ 11に 繫がれることを容易にする。 そして、 ボアパイプ 11の昇降装置による掘 削穴への設置や、 掘削穴からの引き上げも、 高電圧入力部 9 とワイヤー 8 との接触を気にせずに行え、 容易となる。 更に、 昇降装置よつてボア パイプ 11を掘削穴の中で移動することも可能となる。
第 4図によって高電圧入力部 9 の構造を説明する。 第 4図において、 符号 29は、 絶縁部品を示している。 この絶縁部品 29は、 底に一つの貫通 孔 29b を有する力 ップを逆さまにした形状をしている。 前記力 ップ型絶 緑部品 29の開口部の周囲にはフランジ 29c が設けられている。 このフラ ンジ 29c は、 ボアパイプのグランド用パイプ 21のフランジ 21a に接合さ れている。
高電圧導線 30が、 前記絶縁部品 29内に収納されており、 その上端部が 前記貫通孔 29b から少し突き出るように前記貫通孔 29b 内に挿入されて 固定されている。 高電圧導線 30の上端部 30b には電流ケーブル 31が接続 され、 下端部にはボアパイプの高電圧用パイプ 20が接続されている。 前記絶縁部品 29は、 その少なく とも外側の表面 29a に半導電性材料を 塗布することによって被覆されている。 前記絶縁部品 29の半導電性材料 被覆面 29a は、 ボアパイプのグラン ド用パイプ 21と、 それらのフランジ 21a, 29c で電気的接点 29e を有する。 そして、 前記高電圧導線 30の表面 30a も同様に、 半導電性材料が塗布されて被覆されている。 前記高電圧 導線 30の半導電性材料被覆面 30a と前記絶縁部品 29の半導電性材料被覆 面 29a とは前記絶縁部品 29の高電圧導線 30の固定部において電気的接点 29d を有している。 半導電性材料としては、 ポリエチレン、 グラフアイ ト等の溶剤の混合ゃ複号材料が挙げられる。
上記構造の高電圧入力部 9 によって、 高電圧入力テス トを行った。 絶 縁部品 29及び高電圧導線 30は、 高密度ポリエチレン製のものを使用した 。 高電圧導線 30の径は 4ηιηι であり、 高電圧導線 30の高さは 220tnm であつ た。 電流ケ一ブルの 31径は 15關であった。 絶縁部品 29のフランジ 29c の 径 160匪 であった。
半導電性材料被覆面 29a の接点 29e と接点 29d の間の抵抗は、 1. 21 Ω であり、 電流ケーブル 31との接続面である高電圧導線 30の上端部 30b と 接点 29d との間の抵抗も 1. 2k Qであった。 即ち、 半導電性材料被覆面 30 a 及び 29a のすベての電気抵抗は 2.む であった。
そして、 高電圧パルス発電機と電流ケ一ブルの間でテス ト電圧をかけ た。 それを段階的に 350kV 〜880kV に昇圧した。 電圧パルスの間隔は、 1. 5 マイ ク o秒とした。 半導電性材料の被覆をした高電圧入力部 9 は負 荷電圧において半導電性材料の被覆の無いものと比べ 2. 7 倍の負荷電圧 に耐えられた。
(排出泥収集装置)
第 5図(a) 及び第 5図(b) によって、 排出液循環システムを構成する 排出泥収集装置を説明する。 第 5図(a) 及び第 5図(b) は、 ボアパイプ に取り付けられた排出泥収集装置、 及びその断面図を示している。 図中 の Rはボア ト ップ径を示している。
排出泥収集装置は、 第 5図(b) に示すように、 2 つの排出液供給路 32 a, 32b と排出液と共に排出泥を汲み上げるための 2 つの収集路 33a, 33b を有している。
前記 2 つ排出液供給路 32a, 32b は、 ボアパイプのグランド用パイプ 21 と同心円上に設けられた内側パイプ 34と、 前記内側パイプ 34の拡径方向 に位置する断面が円弧状の 2 つの外側壁 35と、 前記 2 つの外側壁 35と内 側パィプ 34を連結するために前記内側パィプ 34から拡径方向に向かって 立設する 4 つの隔壁 36とから形成される断面が扇型の空間である。
前記 2 つの収集路 33a, 33b は、 前記 2 つの排出液供給路 32a, 32b に挾 まれた溝である。 即ち、 この排出泥収集機は収集路用のパイプ等を使用 しないで収集路を形成している。
前記 2 つの収集路 33a,33b 内には、 第 5図(a) に示すように、 ゴム等 で成形された弾性体弁 37が、 前記内側パイプ 34の表面に上下方向へ複数 設けられている。
上記構造の排出泥収集装置の作動を説明する。 岩盤等の被掘削物が粉 碎された後は、 前記 2 つ排出液供給路 32a, 32b から供給された排出液に 岩盤等の被掘削物の破片が混ざり排出泥となる。 この排出泥は、 地上に 設置されたポンプによって前記 2 つの収集路 33a, 33b を通して汲み上げ られる。
この時、 十分な排出泥速度がある場合、 粉砕された破片が大きな固ま りであっても弾性体弁 37を通して上がっていく。 一方、 排出泥の速度が 突然遅く なったりして排出泥速度が不十分となっても、 排出泥は弾性体 弁 37の上に落ちるので、 逆流することはない。 更に、 前記 2 つの収集路 33a, 33b は、 前記 2 つ排出液供給路 32a, 32b の間の溝であって収集路用 のパイプ等を使用していないので、 弾性体弁 37の上に落ちた大きな固ま りは、 既知の技術で細粉することができる。
その結果、 パイプ等によって形成された収集路を有する従来の排出泥 収集装置のように、 大きな固まりによる収集路の閉塞が生じて収集路用 パイプ等の破壊が起き、 そのため、 排出泥収集装置そのものの破壊が生 じてしまうという恐れが無くなる。
電気パルス掘削の特性として電極間距離が lOOmra 以上の場合、 粉砕さ れた破片が大きな固まりである事は有りうる。 しかし、 上記の排出泥収 集装置であれば、 この大きな固まりのために、 排出泥の速度が突然遅く なつたり、 収集路が閉塞されても収集路用のパイプ等が壊されることは ない。
(ボア ト ップの取付構造)
第 6図は、 ボア ト ップ 12のボアパイプ 11への取付構造を示す模式図で ある。 図中の R はボア ト ップ径を示している。
ボア ト ツプ 12は、 ボアパイプ 11のグランドバイプ 21の先端にネジ止め されている。 ボア ト ップ 12のネジ部には所定長を有する水平開口部 38が 設けられている。 この水平開口部 38には 2 つの回り止め 39a, 39b が設け られている。 この 2 つの回り止め 39a, 39b 間の距離は、 ボア ト ップ 12の その軸を中心とした回転を可能とするために、 前記水平開口 38の長さよ りも短く なっている。 ボア ト ップ 12のその軸を中心とする回転の可能な 距離は、 水平開口部 38の長さと 2 つの回り止め 39a, 39b 間の距離との差 によって決定される。 その差は、 電極間距離以上であることが好ましい このような水平開口部 38が設けられた理由は、 次の通りである。 掘削の最中、 ボア ト ップ 12は衝撃波と排出泥の衝擊にさらされる。 こ の結果、 ボア ト ップ 12は曲がったり、 時には捩じれたりする。 しかしな がら、 上記のような水平開口部 38が設けられたボア ト ップ 12は、 その軸 を中心とする回転が可能であるので、 捻じりが防止される。 そして、 ボ ァ ト ップ 12は底部で所定の位置を保持する。 これは岩盤堀削の効率上昇 をもたらす。 効率は、 このような水平開口部 38が設けられていないもの に比べ 2 0 %上昇した。
(ボア ト ップの電極数と掘削穴の中心軸周りの移動)
どの種類の排出液を使用するかは、 堀削費用の削減に関する重要な要 素の一つである。 コス トの安い排出液、 例えば水を使用する場合、 水は 高い電気電導性を持つので、 電極間でかなりの漏れ電流が発生する。 従 つて、 電極の数を減らす事が重要である。 しかし、 大きな径の穴を堀削 する場合には、 電極の数を減らすのに限界があった。
そこで、 電極の数を最小限に減らしつつも大きな径の穴を堀削するこ とのできるボア ト ップの電極構造を第 7図に示す。 ボア ト ップは、 2 本 の高圧電極 18と 2本のグランド電極 17から構成される。 電極は格子の各 交点上に配置される。 ここでは、 電極が 4 本であるので、 正方形の各頂 点に配置されている。 このように、 電極配置が矩形になっているので、 ボア ト ップ径はその最大径 R とする。 そして、 上記構造のボア ト ップは、 掘削穴の軸 0の周りで移動可能で ある。 ボア ト ップの移動は、 排出液の流れ、 放電エネルギーでも可能で あるが、 例えば、 第 3図に示す昇降装置の支柱 28の先端のアーム 28a を 水平方向に伸縮自在、 且つ、 支柱 28の周りで 90° の回転が可能なアーム にすることでボアパイプ 11共々移動が可能になり確実に所定の位置へボ ァ ト ップを移動できる。
上記構造のボア ト ップによる作動を説明する。 上記構造のボア ト ップ において、 電気放電は二点鎖線で囲まれた I部分でおこるが、 結果とし て I部分に囲まれた Π部分に出っ張った岩盤にも破砕が起こり、 効率良 く岩盤を破壊する。 そして、 ボア ト ップを掘削予定の穴 40の軸 0を中心 にして矢印方向に移動させる。 移動した先で、 また掘削作業を行う。 そ れと同時に、 ボア ト ップが移動した後の場所では、 穿孔作業を行う。 こ のように、 ボア ト ツプが掘削穴の軸 0を中心として移動する事で直径の 異なる穴を堀削する事ができる。
従来であれば、 このような大きな直径を持つ穴 40を堀削するには、 通 常何倍かの電極数を必要とし、 したがって、 漏れ電流は数倍増加し、 効 率は著しく低下する。
(電極の先端構造)
大きな径のコアを有する被掘削物の掘削は難しい。 このような大きな 径のコアを有する被掘削物の掘削に適する電極の先端構造を第 8図に示 す。 高圧電極 18及びグランド電極 17の先端が互いに相手に向かって曲げ られている。 曲げ角度は 90° 以下であることが望ましい。
このような先端構造を有する電極は、 600mm 径の中心コアを合計 1 0 0パルスで破砕した。 この方法は堀削効率を 3 0 %向上させた。
(掘削条件の最適化)
次に、 第 1図の掘削機 1 において、 どのようにして、 掘削条件の最適 化を行つたかを具体的に述べる。 電極間距離は 4cm であった。
本掘削方法では、 電力消費量 W を最小とする負荷電圧 U1に対して電力 消費量 W を最小とする単一パルスエネルギ一を求めなければならない。 これは、 単一パルスエネルギーが、 パルス電圧発電機のキャ パシタ ンス を変えることにより変化させられることから、 電力消費量 W を最小とす る負荷電圧 U1に対して電力消費量 W を最小とするパルス電圧発電機の半 ャパシタ ンス C の適正値を求めることでもある。
第 9図は、 負荷電圧 U1に対する電力消費量 W を示すグラフである。 本 発明の掘削方法の一つである式(1) によって、 電力消費量 W が最小にな りそうな負荷電圧 U1の値を求め、 それらの値を含む負荷電圧の範囲 250. 0 〜500. 0 [kV]で負荷電圧を断続的に変化させ、 その時の電力消費量 W を測定したものである。 負荷電圧 U1が 370 〜390 [kV]で電力消費量 W は 最小になった。 そこで、 負荷電圧 U1を 370 [kV]とした。
第 10図は、 負荷電圧 U1を 370 [kV]とした場合のパルス電圧発電機のキ ャパシタンス C に対する電力消費量 W を示すグラフである。 本発明の掘 削方法の一つである式(2) によって、 電力消費量 W が最小になりそうな 単一パルスェネルギ一 W。の値を求め、 それらの単一パルスエネルギー W0 を生じさせるパルス電圧発電機のキヤパシタ ンス C の値を中心付近に含 むキャパシタ ンス c の範囲で、 断続的に変化させ、 その時の電力消費量 W を測定したものである。 キャパシタ ンス [: 力く、 0. 014 [〃 P]の時、 電 力消費量 W は最小になった。 このようにして、 電極間距離 L=4 [cm]の時 、 最適条件は、 負荷電圧 Ul=370 [kV], パルス電圧発電機のキャパシタ ンス 00. 014 であった。
そして、 負荷電圧 U1を 70 [kV] とし, パルス電圧発電機のキャパシ夕 ンス C を 0. 014 [ ^ P]とした時の、 電力消費量 W を最小とする排出液の 量 Q を上記式(3) 等により求めて排出液の量 Q の最適化を行った。 尚、 電極間距 L が 4 [ cm ] 以外の時も、 上記のような方法で負荷電圧、 パルス電圧発電機のキ ャ パシタ ンス C 、 排出液の量 Q の最適な値を得る 事ができる。
ここで、 参考として、 電極間距離し に対する単一パルスエネルギーを 示すグラフを第 11図に示す。 最適条件を得るための目安となる Wo≥90い • s — 式(3) のグラフが示されている。 斜線範囲は電気パルスで岩石を 破壊するのに必要なエネルギーを示しており、 クレッツ、 ドルゾン等の 特許による (1995年 9月 13日付け) 。 産業上の利用可能性
本発明は、 最小の電力消費量によって、 効率良く掘削することの可能 な掘削方法及び掘削機として最適である。

Claims

請 求 の 範 囲
1. 排出液が導入された掘削穴中に存在する被掘削物を高電圧パ ルスによる複数の電極間放電によつて破壊する掘削方法であつて、 掘削効率に関する次のパラメ 一タの少なく とも一つを、 掘削に関する 電力消費量を最小とするのに最も適した値に選定して掘削する方法。
i ) 被掘削物の破壊に要する負荷電圧
ϋ ) 単一パノレスエネノレギー
iii) 排出液の量
2. 前記被掘削物の破壊に要する負荷電圧の最適値は、 次式によ つて得られる負荷電圧値 U1を含む負荷電圧の範囲内で、 連続的或いは断 続的に負荷電圧を変化させることによって見いだされることを特徴とす る請求の範囲第 1項に記載の掘削方法。
1
Ul= Κ(—— )°· 15XU0XL°- 4 [kv] (1) n-l
ここにおいて
K: 係数、 K=l.0〜1.5 [l/cm°'4]
η: 電極の数
L: 電極間距離 [cm]
Uo: 実験で得られる数値、 排出液中に存在する被掘削物のサンプルの 表面に置かれた電極間距離 lcra の 2本の電極が前記サンプルを放電破壊 する時の電圧 [kv]
3. 前記単一パルスヱネルギ一の最適値は、 次式によって得られ る単一パルスエネルギー W。を含む単一パルスエネルギ一の範囲内で、 連 続的或いは断続的に単一パルスエネルギーを変化させることによって見 いだされることを特徴とする請求の範囲第 1項に記載の掘削方法。
Wo>90L 6 [J] (2)
4 . 前記排出液の量の最適値は、 次式によって得られる排出液の 量 Q を含む排出液の量の範囲内で、 連続的或いは断続的に排出液の量を 変化させることによって見いだされることを特徴とする請求の範囲第 1 項に記載の掘削方法。
π X Db 2
Q= (0. 25 〜0. 5) f [リ ツタ一 / 分] (3)
4
Db : ボア ト ツプの径 [era]
f : 1 秒当たりのパルス数 (パルスの周波数〉
5 . 排出液が導入された掘削穴中に存在する被掘削物を高電圧パ ルスによる複数の電極間放電によつて破壊する掘削機 1 であって、 高電圧パルス発電機 2 と、
前記高電圧パルス発電機 2 からの高電圧が少なく とも一つに入力され る複数の電極 17, 18 と、
排出液循環システム 3, 4, 5a, 5b と、
最適条件設定装置 13, 14, 15, 16 とを備え、
前記最適条件設定装置 13, 14, 15, 16 は、 前記高電圧パルス発電機 2 と 前記複数の電極 17, 18 の間に接続され、 若しく は、 前記排出液循環シス テム 3, 4, 5a, 5b の中に組み込まれ、 或いは、 前記高電圧パルス発電機 2 と前記複数の電極 17, 18 の間に接続され且つ前記排出液循環システム 3, 4, 5a, 5b の中に組み込まれて、
掘削に関する電力消費量が最小となるように、 掘削効率に関する次の パラメータの少なく とも一つの最適化を行うことを特徴とする掘削機 1 i ) 被掘削物の破壊に要する負荷電圧
ϋ ) ' 単一パノレスエネノレギ—
iii ) 排出液の量
6 . 排出液が導入された掘削穴中に存在する被掘削物を高電圧パ ルスによる複数の電極間放電によって破壊する掘削機 1 であって、 高電圧パルス発電機 2 と、
前記高電圧パルス発電機 2 からの高電圧が少なく とも一つに入力され る複数の電極 17, 18 と、
前記高電圧パルス発電機 2 と前記複数の電極 17, 18 の間で前記高電圧 を電極に伝達するために、 高電圧用パイプ 20と、 該高電圧用パイプ 20の 外側に同心円状に重ねられたダランド用パイプ 21を有し、 その一端側が 高電圧パルス発電機 2 に接続され、 他端側が複数の電極に接続されてい るボアパイプ 11とを備え、
前記ボアパイプ 11の前記グランド用パイプ 21の内側と前記高電圧用パ ィプ 20の外側は非磁性の電気電導性の高い材料でメ ツキされていること を特徴する掘削機。
7 . 排出液が導入された掘削穴中に存在する被掘削物を高電圧パ ルスによる複数の電極間放電によつて破壊する掘削機 1 であって、 高電圧パルス発電機 2 と、
前記高電圧パルス発電機 2 からの高電圧が少なく とも一つに入力され る複数の電極 17, 18 と、
前記高電圧パルス発電機 2 と前記複数の電極 17, 18 の間で前記高電圧 を電極に伝達するために、 その一端側が高電圧パルス発電機 2 に接続さ れ、 他端側が複数の電極に接続されているボアパイプ 11と、
前記ボアパイプ 11を地中に案内するために、 前記ボアパイプ 11の周囲 に設けられたガイ ド 10とを備え、
前記ボアパイプ 11とガイ ド 10は、 前記ボアパイプ 11が前記ガイ ド 10内 を上下方向にスライ ド可能なように、 スライ ド接点 23を介して接続され ていることを特徴する掘削機。
8 . 排出液が導入された掘削穴中に存在する被掘削物を高電圧パ ルスによる複数の電極間放電によつて破壊する掘削機 1 であって、 前記高電圧パルスを生じさせる高圧パルス電源回路が、 ィ ンダクタ一 蓄電器 26と半導体整流器 27とを組み合わせたィ ンダクタ一蓄電型高圧パ ルス電源回路であることを特徴する掘削機。
9 . 排出液が導入された掘削穴中に存在する被掘削物を高電圧パ ルスによる複数の電極間放電によって破壊する掘削機 1 であって、 高電圧パルス発電機 2 と、
前記高電圧パルス発電機 2 からの高電圧が少なく とも一つに入力され る複数の電極 17, 18 と、
前記高電圧パルス発電機 2 と前記複数の電極 17, 18 の間で前記高電圧 を電極に伝達するために、 その一端側が高電圧パルス発電機 2 に接続さ れ、 他端側が複数の電極に接続され、 垂直に立設されているボアパイプ 11と、
前記ボアパイプ 11を上下動させるための、 吊り上げ手段を有する昇降 装置とを備え、
前記ボアパイプ 11に高電圧を入力するための高電圧入力部 9 が、 ボア パイプ 11の一端側であってボアパイプ 11の軸から所定角度 傾いた位置 に設けられていることを特徴する掘削機。
1 0 . 排出液が導入された掘削穴中に存在する被掘削物を高電圧 パルスによる複数の電極間放電によつて破壊する掘削機 1 であって、 高電圧パルス発電機 2 と、
前記高電圧パルス発電機 2 からの高電圧が少なく とも一つに入力され る複数の電極 17, 18 と、
前記高電圧パルス発電機 2 と前記複数の電極 17, 18 の間で前記高電圧 を電極に伝達するために、 高電圧用パイプ 20と、 該高電圧用パイプ 20の 外側に同心円状に重ねられたグランド用パイプ 21を有し、 その一端側が 高電圧パルス発電機 2 に接続され、 他端側が複数の電極に接続されてい るボアパイプ 11とを備え、
前記ボアパイプ 11に高電圧を入力するための高電圧入力部 9 の外表面 が半導電性材料で被覆されグランド用パイプ 21と電気的に接続されてい ることを特徴する掘削機。
1 1 . 排出液が導入された掘削穴中に存在する被掘削物を高電圧 パルスによる複数の電極間放電によって破壊する掘削機 1 であって、 高電圧パルス発電機 2 と、
前記高電圧パルス発電機 2 からの高電圧が少なく とも一つに入力され る複数の電極 17, 18 と、
前記高電圧パルス発電機 2 と前記複数の電極 17, 18 の間で前記高電圧 を電極に伝達するために、 その一端側が高電圧パルス発電機 2 に接続さ れ、 他端側が複数の電極に接続されているボアパイプ 11と、
前記ボアパイプ 11に取り付けられた排出泥収集装置とを備え、 前記排出泥収集装置は、 ボアパイプ Πと同心円上に設けられた断面が 扇型のパイプによって形成される排出液供給路 32a, 32b と、 該排出液供 紿路 32a, 32b に挾まれた溝によって形成される収集路 33a, 33b を有し、 前記収集路 33a, 33b には、 弾性体弁 37が排出泥収集方向に沿って複数 設けられていることを特徴する掘削機。
1 2 . 排出液が導入された掘削穴中に存在する被掘削物を高電圧 パルスによる複数の電極間放電によって破壊する掘削機 1 であって、 高電圧パルス発電機 2 と、
前記高電圧パルス発電機 2 からの高電圧が少なく とも一つに入力され る複数の電極 17, 18 を有するボア ト ップ 12と、
前記高電圧パルス発電機 2 と前記ボア ト ップ 12の間で前記高電圧を電 極に伝達するために、 その一端側に高電圧パルス発電機 2 が接続され、 他端側に前記ボア ト ップ 12がネジ止めされているボアパイプ 11とを備え 前記ボア ト ップ 12のネジ部には所定長を有する水平開口部 38と、 この 水平開口部 38の中の 2 つの回り止め 39a, 39b が設けられており、 この 2 つの回り止め 39a, 39 間の距離は、 ボア ト ップ 12のその軸を中心とした 回転を可能とするために、 前記水平開口 38の所定長よりも短い距離であ ることを特徴する掘削機。
1 3 . 排出液が導入された掘削穴中に存在する被掘削物を高電圧 パルスによる複数の電極間放電によって破壊する掘削機 1 であって、 高電圧パルス発電機 2 と、
前記高電圧パルス発電機 2 からの高電圧が少なく とも一つに入力され る複数の電極 17, 18 を有するボア ト ップ 12と、
前記高電圧パルス発電機 2 と前記ボア ト ップ 12の間で前記高電圧を電 極に伝達するために、 その一端側に高電圧パルス発電機 2 が接続され、 他端側に前記ボア ト ップ 12が連結されているボアパイプ 11とを備え、 前記ボア ト ップ 12は、 格子の各交点上に電極を配備し、 掘削穴の中を 移動可能であることを特徴する掘削機。
1 4 . 排出液が導入された掘削穴中に存在する被掘削物を高電圧 パルスによる複数の電極間放電によって破壊する掘削機 1 であって、 高電圧パルス発電機 2 と、
前記高電圧パルス発電機 2 からの高電圧が少なく とも一つに入力され る複数の電極 17, 18 とを備え、
前記高電圧が入力される高圧電極 18と他の電極 17とは、 それらの先端 が互いに相手に向かって屈曲していることを特徴する掘削機。
PCT/JP1997/002345 1996-10-14 1997-07-07 Procede d'excavation a l'aide d'impulsions electriques et excavatrice associee WO1998016713A1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
AU33592/97A AU3359297A (en) 1996-10-14 1997-07-07 Excavation method using electric pulses, and excavator
JP51816698A JP3877010B2 (ja) 1996-10-14 1997-07-07 電気パルスによる掘削方法及び掘削機
US09/284,833 US6164388A (en) 1996-10-14 1997-07-07 Electropulse method of holes boring and boring machine

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
RU96120954 1996-10-14
RU96120954A RU2123596C1 (ru) 1996-10-14 1996-10-14 Электроимпульсный способ бурения скважин и буровая установка

Publications (1)

Publication Number Publication Date
WO1998016713A1 true WO1998016713A1 (fr) 1998-04-23

Family

ID=20186811

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP1997/002345 WO1998016713A1 (fr) 1996-10-14 1997-07-07 Procede d'excavation a l'aide d'impulsions electriques et excavatrice associee

Country Status (5)

Country Link
US (1) US6164388A (ja)
JP (1) JP3877010B2 (ja)
AU (1) AU3359297A (ja)
RU (1) RU2123596C1 (ja)
WO (1) WO1998016713A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012209193A (ja) * 2011-03-30 2012-10-25 Nissin Kogyo Co Ltd カーボンナノファイバーを用いた電極用多孔質体、電極、電池、キャパシタ、水処理装置、油田装置及び電極用多孔質体の製造方法
JP2018053573A (ja) * 2016-09-29 2018-04-05 国立研究開発法人海洋研究開発機構 地盤掘削装置

Families Citing this family (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3434800B2 (ja) * 2001-01-31 2003-08-11 海洋科学技術センター 地殻コア試料の採取方法、並びにこれに用いる抗菌性高分子ゲルおよびゲル材料
US6857706B2 (en) 2001-12-10 2005-02-22 Placer Dome Technical Services Limited Mining method for steeply dipping ore bodies
AU2003206386A1 (en) 2002-01-03 2003-07-24 Placer Dome Technical Services Limited Method and apparatus for a plasma-hydraulic continuous excavation system
GB0203252D0 (en) 2002-02-12 2002-03-27 Univ Strathclyde Plasma channel drilling process
US7695071B2 (en) 2002-10-15 2010-04-13 Minister Of Natural Resources Automated excavation machine
DE10346055B8 (de) * 2003-10-04 2005-04-14 Forschungszentrum Karlsruhe Gmbh Aufbau einer elektrodynamischen Fraktionieranlage
NO322323B2 (no) * 2003-12-01 2016-09-13 Unodrill As Fremgangsmåte og anordning for grunnboring
US20060037516A1 (en) * 2004-08-20 2006-02-23 Tetra Corporation High permittivity fluid
US7527108B2 (en) * 2004-08-20 2009-05-05 Tetra Corporation Portable electrocrushing drill
US7959094B2 (en) * 2004-08-20 2011-06-14 Tetra Corporation Virtual electrode mineral particle disintegrator
US8172006B2 (en) 2004-08-20 2012-05-08 Sdg, Llc Pulsed electric rock drilling apparatus with non-rotating bit
US8186454B2 (en) * 2004-08-20 2012-05-29 Sdg, Llc Apparatus and method for electrocrushing rock
US8789772B2 (en) 2004-08-20 2014-07-29 Sdg, Llc Virtual electrode mineral particle disintegrator
US9190190B1 (en) 2004-08-20 2015-11-17 Sdg, Llc Method of providing a high permittivity fluid
US7559378B2 (en) 2004-08-20 2009-07-14 Tetra Corporation Portable and directional electrocrushing drill
GB2420358B (en) * 2004-11-17 2008-09-03 Schlumberger Holdings System and method for drilling a borehole
US9416594B2 (en) 2004-11-17 2016-08-16 Schlumberger Technology Corporation System and method for drilling a borehole
US10060195B2 (en) 2006-06-29 2018-08-28 Sdg Llc Repetitive pulsed electric discharge apparatuses and methods of use
US20110064706A1 (en) * 2008-01-11 2011-03-17 U.S. Nutraceuticals, Llc D/B/A Valensa International Method of preventing, controlling and ameliorating urinary tract infections and supporting digestive health by using a synergistic cranberry derivative, a d-mannose composition and a proprietary probiotic blend
US20110056192A1 (en) * 2009-09-10 2011-03-10 Robert Weber Technique for controlling pumps in a hydraulic system
US8362629B2 (en) * 2010-03-23 2013-01-29 Bucyrus International Inc. Energy management system for heavy equipment
US8626403B2 (en) 2010-10-06 2014-01-07 Caterpillar Global Mining Llc Energy management and storage system
US8606451B2 (en) 2010-10-06 2013-12-10 Caterpillar Global Mining Llc Energy system for heavy equipment
US8718845B2 (en) 2010-10-06 2014-05-06 Caterpillar Global Mining Llc Energy management system for heavy equipment
AU2012204152B2 (en) 2011-01-07 2017-05-04 Sdg Llc Apparatus and method for supplying electrical power to an electrocrushing drill
RU2524101C2 (ru) * 2011-03-23 2014-07-27 Николай Данилович Рязанов Способ электроимпульсного бурения скважин, электроимпульсной буровой наконечник
RU2471068C1 (ru) * 2011-05-27 2012-12-27 Государственное образовательное учреждение высшего профессионального образования "Национальный исследовательский Томский политехнический университет" Способ контроля процесса электроимпульсного разрушения твердых тел
US9279322B2 (en) * 2011-08-02 2016-03-08 Halliburton Energy Services, Inc. Systems and methods for pulsed-flow pulsed-electric drilling
US20130032398A1 (en) * 2011-08-02 2013-02-07 Halliburton Energy Services, Inc. Pulsed-Electric Drilling Systems and Methods with Reverse Circulation
RU2500873C1 (ru) * 2012-04-28 2013-12-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный исследовательский Томский политехнический университет" Электроимпульсный буровой снаряд
US10407995B2 (en) 2012-07-05 2019-09-10 Sdg Llc Repetitive pulsed electric discharge drills including downhole formation evaluation
US9190852B2 (en) 2012-09-21 2015-11-17 Caterpillar Global Mining Llc Systems and methods for stabilizing power rate of change within generator based applications
CA2846201C (en) 2013-03-15 2021-04-13 Chevron U.S.A. Inc. Ring electrode device and method for generating high-pressure pulses
WO2015042608A1 (en) 2013-09-23 2015-03-26 Sdg Llc Method and apparatus for isolating and switching lower voltage pulses from high voltage pulses in electrocrushing and electrohydraulic drills
BR112018002077B1 (pt) * 2015-08-19 2023-02-28 Chevron U.S.A. Inc. Sistema de perfuração de fundo de poço e capacitor de alta voltagem
US9976352B2 (en) 2015-08-27 2018-05-22 Saudi Arabian Oil Company Rock formation drill bit assembly with electrodes
WO2017127659A1 (en) 2016-01-20 2017-07-27 Baker Hughes Incorporated Electrical pulse drill bit having spiral electrodes
GB2565584A (en) 2017-08-17 2019-02-20 Fibercore Ltd Drilling system
CN114217662B (zh) * 2021-11-23 2022-09-20 华中科技大学 一种高电压脉冲碎岩技术的匹配电压波头确定方法及系统

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3700169A (en) * 1970-10-20 1972-10-24 Environment One Corp Process and appratus for the production of hydroelectric pulsed liquids jets
US3840270A (en) * 1973-03-29 1974-10-08 Us Navy Tunnel excavation with electrically generated shock waves
JPS5812433B2 (ja) * 1980-11-06 1983-03-08 東京電子技研株式会社 水中マイクロ波破砕方法およびその装置
US5914020A (en) * 1994-12-05 1999-06-22 E. I. Du Pont De Nemours And Company Electric field method and apparatus for decontaminating soil
RU2081259C1 (ru) * 1995-02-22 1997-06-10 Научно-исследовательский институт высоких напряжений при Томском политехническом университете Способ изготовления изделий из некондиционного железобетона
KR0184541B1 (ko) * 1995-10-30 1999-04-01 박주탁 골드슈미트 파암장치

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012209193A (ja) * 2011-03-30 2012-10-25 Nissin Kogyo Co Ltd カーボンナノファイバーを用いた電極用多孔質体、電極、電池、キャパシタ、水処理装置、油田装置及び電極用多孔質体の製造方法
JP2018053573A (ja) * 2016-09-29 2018-04-05 国立研究開発法人海洋研究開発機構 地盤掘削装置

Also Published As

Publication number Publication date
US6164388A (en) 2000-12-26
AU3359297A (en) 1998-05-11
RU2123596C1 (ru) 1998-12-20
JP3877010B2 (ja) 2007-02-07

Similar Documents

Publication Publication Date Title
WO1998016713A1 (fr) Procede d&#39;excavation a l&#39;aide d&#39;impulsions electriques et excavatrice associee
EP2329095B1 (en) Pulsed electric rock drilling apparatus with non-rotating bit and directional control
EP2870316B1 (en) Apparatuses and methods for supplying electrical power to an electrocrushing drill
US10760239B2 (en) In-situ piling and anchor shaping using plasma blasting
JP4703571B2 (ja) 放電パルスによる掘削のための方法、掘削機、ドリルビット、および穴底面組立体
EP3620605B1 (en) Pulsed electric rock drilling, fracturing, and crushing methods and apparatus
US8186454B2 (en) Apparatus and method for electrocrushing rock
US9190190B1 (en) Method of providing a high permittivity fluid
US20070152494A1 (en) Fracturing Using a Pressure Pulse
RU96120954A (ru) Электроимпульсный способ бурения скважин и буровая установка
JP2795836B2 (ja) 固体絶縁体の破壊方法
EP3739163B1 (en) Drill head for electro-pulse-boring
RU179832U1 (ru) Гидромониторная насадка для струйной цементации
US20140060804A1 (en) Well Cleaning Device
RU2283937C2 (ru) Электроимпульсный бур
WO2008143421A1 (en) A ground rod structure with drills blade shape
US11898420B2 (en) Tapered string pulse power rock excavation system
RU2204189C2 (ru) Искровой разрядник (варианты)
RU2445430C1 (ru) Электроимпульсная буровая установка

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AL AM AT AU AZ BA BB BG BR BY CA CH CN CU CZ DE DK EE ES FI GB GE HU IL IS JP KE KG KR KZ LC LK LR LS LT LU LV MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK TJ TM TR TT UA UG US UZ VN AM AZ BY KG KZ MD RU TJ TM

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH KE LS MW SD SZ UG ZW AT BE CH DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 09284833

Country of ref document: US

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: CA