US20140012429A1 - Systems and methods for balancing an electrical grid with networked buildings - Google Patents

Systems and methods for balancing an electrical grid with networked buildings Download PDF

Info

Publication number
US20140012429A1
US20140012429A1 US13/543,520 US201213543520A US2014012429A1 US 20140012429 A1 US20140012429 A1 US 20140012429A1 US 201213543520 A US201213543520 A US 201213543520A US 2014012429 A1 US2014012429 A1 US 2014012429A1
Authority
US
United States
Prior art keywords
buildings
control system
building
networking control
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/543,520
Inventor
Ian Dempster
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Optimum Energy LLC
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US13/543,520 priority Critical patent/US20140012429A1/en
Assigned to OPTIMUM ENERGY, LLC reassignment OPTIMUM ENERGY, LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: DEMPSTER, IAN
Publication of US20140012429A1 publication Critical patent/US20140012429A1/en
Priority to US14/299,293 priority patent/US20140379139A1/en
Priority to US15/593,094 priority patent/US11221597B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/001Methods to deal with contingencies, e.g. abnormalities, faults or failures
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F5/00Systems for regulating electric variables by detecting deviations in the electric input to the system and thereby controlling a device within the system to obtain a regulated output
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/28The renewable source being wind energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • H02J2310/14The load or loads being home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Definitions

  • the present invention generally relates to systems and methods for balancing an electrical power grid with networked buildings, and more specifically to systems and methods for controlling an energy optimization level of the networked building with a network control system.
  • An electric grid is a network of synchronized power providers and consumers connected by transmission and distribution lines and operated by one or more utility control centers.
  • the phrase “power grid” generally refers to a transmission system for electricity.
  • the continental United States there are three primary grids: the Eastern Interconnect, the Western Interconnect and the Texas Interconnect. In Alaska and Hawaii, several smaller systems interconnect parts of each state.
  • a local power grid may take the form of one or more power generation sources, various power transmission lines, and power consumers.
  • local power grids have been manually controlled and for various reasons have been susceptible to “brown outs,” which is understood to be a reduction or cutback in electric power because of a power generation shortage, a mechanical failure, or unanticipated load requirements by the power consumers.
  • a smart grid is a digitally enabled electrical grid that gathers, distributes, and acts on information about the behavior of all participants (suppliers and consumers) in order to improve the efficiency, importance, reliability, economics, and sustainability of electricity services.
  • smart grid has been in use since about 2005 when the term was popularized in an article that appeared in the September/October issue of IEEE P & E Magazine (Vol. 3, No.5, pgs 34-41).
  • a common element to most smart grids is the application of digital processing and communications to the power grid, making data flow and information management central to the smart grid.
  • Smart energy demand describes the energy user component of the smart grid. Smart energy demand is a broad concept that generally includes energy-users actively controlling the pre-heating or pre-cooling of buildings and/or actively reducing their peak demand loads.
  • Intelligent buildings can help on the demand side of the grid.
  • An “intelligent building” is one equipped with an advanced building automation controller (BAC) that influences energy-relevant equipment and settings like HVAC, lighting or windows; senses energy-relevant information like occupancy, weather, or usage; and contains advanced control algorithms that go beyond plain PID (proportional, integral and derivative control function).
  • BAC building automation controller
  • Such an advanced BAC can use weather forecasts, learn usage profiles or reschedule the operations of building systems in order to meet smart grid requirements.
  • One key ingredient for operating in such a smart way is to know the dynamic behavior of the building. Model-based control needs such a building. model to determine the optimal control strategy.
  • existing simulation methods and tools are computationally very costly and therefore not suitable for a standard embedded building controller. Id.
  • BAC Building automation controllers
  • P, PI, and PID controllers i.e., using proportional, integral and differential parts of the input signal
  • Information technology has pushed forward the automation and management level, resulting in a broad variety of BAC from different vendors covering all issues including control, monitoring, reporting, and maintenance for various application areas like indoor climate, lighting, security, and safety of persons and buildings.
  • the control mechanisms are composed of a combination of linear control with digital control.
  • a typical control strategy of a system e.g., a heat pump
  • control strategy is either done in a programming language or graphically by composing the control strategy out of predefined function blocks.
  • the programmer has to place the blocks (which also include the linear controllers) and connect inputs and outputs. This graphical solution simplifies commissioning, since it is not necessary to debug the control strategy down to the level of single commands (as is necessary with programs). Id.
  • the present invention is generally directed toward an electrical power grid having multiple, networked buildings that receive electrical power from one or more power generation sources.
  • a networking control system communicates with a utility control center to obtain information regarding the amount of power being supplied by the power generation sources.
  • the networking control system further obtains information from one or more building automation controllers that are controllably associated with a plurality of networked buildings.
  • the networking control system determines whether the total amount of power being supplied exceeds a total demand load for the plurality of buildings. And if so, the networking control system commands one or more of the building automation controllers to operate one ore more of the buildings a reduced energy efficiency level, which may take the form of an optimization curve.
  • an electric power grid system includes at least one electrical power generation source; a utility control center in communication with the at least one electrical power generation source; a networking control system in communication with the utility control center to receive data on a total amount of power supplied by the at least one electrical power generation source; and a plurality of buildings, each building having a building automation controller, the controllers in communication with one another and each controller in communication with the networking control system.
  • the networking control system is operable to compare the total amount of power supplied to a total demand load for the plurality of buildings, and based on the comparison the networking control system is operable to instruct one or more of the building automation controllers to reduce an energy optimization level of its respective building for a period of time.
  • a method for controlling a plurality of networked buildings includes the steps of (1) receiving information from a utility control center regarding a total amount of power presently being supplied from one or more power generation sources; (2) communicating with a plurality of building automation controllers regarding information about building power loads for a plurality of networked buildings; (3) determining whether the total amount of power presently being supplied exceeds a total demand from the building power loads; and (4) transmitting instructions to at least one of the building automation controllers to reduce an energy optimization level of at least one of the networked buildings for a period of time.
  • a networking control system includes a communications link to a utility control center to obtain information about an amount of power presently being supplied by one or more electrical power generation source; and a communications link to a plurality of building automation controller, the controllers in communication with one another, the controllers operable to adjust an energy optimization level of at least one building of a plurality of networked buildings.
  • the networking control system is operable to compare a total amount of the power presently being supplied with a total demand load for the plurality of the networked buildings, and based on the comparison the networking control system is operable to instruct one or more of the building automation controllers to reduce the energy optimization level of the at least one building for a period of time.
  • FIG. 1 is a schematic system diagram of an electric power grid having at least one power generation source supplying power to a plurality of buildings that are in communication with a networking control system and a utility control center according to an embodiment of the present invention
  • FIG. 2 is a front plan view of a display screen showing a listing of buildings that are and are not being controlled by the networking control system of FIG. 1 according to an embodiment of the present invention.
  • FIG. 3 is a flow diagram showing a method of balancing an electrical power grid with networked buildings according to an embodiment of the present invention.
  • an electrical power grid having multiple, networked buildings and one or more power sources may be balanced to minimize inefficiencies and costs on the supply (i.e., source) side of the grid.
  • the balancing of the networked buildings includes controlling an energy optimization level for each building using a networked control system that communicates directly with both a utility control center and the networked buildings.
  • the balancing of the grid provides the ability to appropriately and temporally, preferably in real-time, balance the power load demands of the networked buildings vis-à-vis the supply capacities of the power generation sources.
  • the demand load for each of the networked buildings will naturally increase or decrease depending on a variety of variables such as, but not limited to, the amount of people in the building and the outside weather conditions.
  • the power output capacity for the power sources may also vary. For example, wind and solar power sources are dependent on the amount of wind and sun energy available, which naturally changes throughout the day.
  • one objective of the present invention is to reduce the load on the grid to prevent a “brown out,” which was previously defined as a reduction or cutback in electric power, especially as a result of a shortage, a mechanical failure, or overuse by consumers.
  • Another objective of the present invention is to prevent or eliminate the need to take a power generation source offline, but instead keep it on-line and running at a reduced level (e.g., idling) while any operating efficiencies of the overall grid are dealt with on the demand side (e.g., by adjusting the energy optimization levels for one or more of the networked buildings).
  • FIG. 1 shows an electrical power grid 100 having a plurality of electrical power generation sources 102 , a utility control center 104 , a plurality of buildings 106 , and a networking control system 108 .
  • the buildings 106 are networked (i.e., interconnected) in that environmental control data or other information about the buildings may be obtained from, extracted from, or exchanged with other buildings and the networking control system 108 by way of building automation controllers (BACs) 109 .
  • the networking control system 108 may transmit, receive and exchange computer readable instructions or other encoded signals with the BACs 109 .
  • the flow of information to/from the BACs 109 and networking control system 108 may be accomplished using a wired or wireless communication platform 110 .
  • the network control system 108 and the BACs 109 are connected to a local area network or a wide area network, such as the Internet.
  • the power generation sources 102 may take a variety of forms such as, but not limited to, a wind powered generation source 102 a, a solar powered generation source 102 b, a coal powered generation source 102 c, or a nuclear powered generation source 102 d.
  • the networked buildings 106 may take a variety of forms such as, but not limited to, an office building 106 a, a medical building 106 b, or a residential building 106 c.
  • a building may generally include any structure that utilizes a heating, ventilation and air conditioning (HVAC) system and demands a non-zero electrical load.
  • HVAC heating, ventilation and air conditioning
  • the term “load” generally means an electrical power requirement required by the building's HVAC or lighting system to keep the building in a desired state.
  • the load required by a particular building often fluctuates throughout the day due to temperature changes, weather changes, time of day (e.g., primary work hours), etc.
  • the power generation sources 102 supply electrical power through one or more supply transmission lines 112 .
  • the utility control center 104 communicates with the power generation sources 102 by way of a wireless or non-wireless communication platform 113 (shown in dashed lines to distinguish from the transmission lines 112 ).
  • the buildings 104 receive the electrical power from demand transmission lines 114 , which may interface with or be the same as the supply transmission lines 112 .
  • the utility control center 104 communicates with the networking control system 108 by way of a wireless or non-wireless communication platform 116 .
  • the networking control system 108 communicates with each of the BACs 109 , as described in more detail below.
  • the BACs 109 receive information from the respective building's HVAC system, lighting system or some other environmental control system (for purposes of brevity hereinafter all the various systems will simply be referred to as the HVAC system).
  • the BACs 109 include various executable programs for determining a real time operating efficiency, simulating a predicted or theoretical operating efficiency, comparing the same, and then adjusting one or more operating parameters on equipment utilized by a building's HVAC system.
  • the executable programs control variable speed loop cooling plants to establish a decrease or increase of energy usage for the building's HVAC system.
  • At least one or more of the executable algorithms employed by the BACs 109 may comport with an equal marginal performance principle such as provided in an article entitled “Designing Efficient Systems with the Equal Marginal Performance Principle,” ASHRAE Journal, Vol. 47, No. 7, July 2005, which is incorporated herein by reference in its entirety. Additionally or alternatively, at least one or more of the executable algorithms employed by the BACs 109 may comport with a sequencing control strategy for chillers in an all variable speed chiller plant or some other control strategy that includes adjusting one or more numerical constants associated with the operation of an HVAC system.
  • the numerical values may be related to a variety of HVAC system components such as, but not limited to, centrifugal pumps, fans, and variable speed drive centrifugal chillers. In one embodiment, the numerical values are derived and/or adjusted based on the likelihood that more HVAC equipment operates in parallel and on-line near its natural operating curve.
  • the BACs 109 may communicate with an all-variable speed system to compensate for changes to equipment or operating conditions automatically, using self-correcting computer executable instructions.
  • the BACs 109 in communication with and with information from the networking control system 108 , may advantageously provide an automated technique to replace the current manual tuning methods used to tune the HVAC system for one or more of the networked buildings 106 .
  • the networking control system 108 automatically corrects the operation of the BACs to compensate for changes in HVAC equipment characteristics or external building load characteristics that may be attributed to the building and local climate.
  • the BACs 109 may include or operate as a self-learning controller as described in U.S. Patent Publication No. 2010/0114385, which is also incorporated by reference in its entirety.
  • the networking control system 108 communicates with a database 118 that includes information about whether a particular building 106 is in a network that includes the networked buildings 106 .
  • the database 118 includes a list of buildings 106 and a corresponding list of real-time demand loads 120 for each building.
  • the database 118 includes continuously updated information regarding one or more environmental parameters about the plurality of buildings. Such parameters may include, but are not limited to, total building power (e.g., KW), total building load (e.g., tons/BTUh), building efficiencies, power usage, and building temperature.
  • the particular building is not in the network then it may be identified as “not commissioned.” However, other terms or phrases may be used to indicate a non-networked building. In some cases if the building is “not commissioned” then the networking control system 108 will be unable to obtain the demand loads 120 , however other buildings may be “not commissioned” and still be able to provide their demand loads 120 through one or more communication platforms.
  • the networking control system 108 may include a pricing module configured to determine electric rates of the networked buildings based on a calculated operating efficiency determined during peak and off-peak periods. Based on this, reduced power rates may be offered to networked buildings that permit energy optimization control during certain times.
  • FIG. 3 shows an energy optimization chart 300 for one of the networked buildings.
  • the BAC will attempt to keep its respective building at 100% optimized or close thereto, which means a real-time energy efficiency is equal to or substantially equal to a theoretical energy efficiency for the building.
  • the vertical axis 302 indicates the percentage of optimization for a networked building while the horizontal axis 304 indicates time.
  • the BAC can vary the optimization percentage using one or more of the executable algorithms or control strategies, which have been previously described above. Further, the BAC may be controlled or commanded by the networking control system 108 to follow a particular percentage optimization curve other than 100% optimized, such as an optimization curve 306 as shown in the illustrated embodiment.
  • the networking control system 108 may balance the incoming power over the networked buildings by instructing one or more of the buildings to operate below a 100% optimized level.
  • the building represented by optimization curve 306 is shown operating at a 50% optimization level to keep one or more of the power sources from having to go completely offline.
  • the optimization level of the building may be decreased below 50% for a period of time, which may be energy inefficient when it comes to that particular building, but in the aggregate be more energy efficient with respect to the entire grid, especially as compared to bring one or more power sources completely offline.
  • the optimization curve 306 further shows that as the demand loads increase for other networked buildings and/or the power output from one or more of the power sources decreases then the percentage optimization of the represented building may be increased up to the 100% optimization level.
  • This controlled shifting of the optimization curve for each networked building results in a balanced grid capable of smoothly adjusting to the ebbs, flows, peaks and valleys of the supply and demand within the grid.
  • FIG. 4 shows a flow diagram of a method 400 for balancing an electrical grid with networked buildings.
  • the utility control center 104 receives operating data regarding a total amount of power presently being supplied by one or more of the power generation sources 102 . This information is provided to the networking control system 108 , which in turn determines whether the total amount of power presently being supplied exceeds a total amount of demand load for the networked buildings 106 . If not, then the utility control center 104 continues to monitor the power supplied by the power sources and may also communicate with one or more of the power sources to increase its supplied power output.
  • the networking control system 108 instructs at least one of the BACs 109 to decrease an energy optimization level of its respective building.
  • the decreased optimization level may follow an optimization curve similar to the one illustrated in FIG. 3 . Accordingly, the respective building will operate at a reduced energy efficiency level for an amount of time determined by the networking control system 108 , which continually communicates with the utility control center 104 . If the building demand loads greatly exceed the total power supplied then multiple BACs may be commanded to control their respective buildings at a sub-optimized level for the same or differing periods of time.
  • At least one embodiment of the present invention may advantageously prevent brown outs from occurring during high demand cycles, low power supply cycles or some combination of each.
  • it may advantageously allow excess power to be utilized, albeit more inefficiently, by the networked buildings instead of bringing an entire power source offline.
  • This power management strategy may, in the aggregate and over time, actually save energy and minimize or eliminate unwanted pollutants that may enter the atmosphere during the start-up cycle of certain types of power sources.
  • Other advantages will also be apparent to those of skill in the art.

Abstract

An electrical power grid includes multiple, networked buildings that receive electrical power from one or more power generation sources. A networking control system communicates with a utility control center to obtain information regarding the amount of power being supplied by the power generation sources. The networking control system further obtains information from one or more building automation controllers that are controllably associated with a plurality of networked buildings. The networking control system determines whether the total amount of power being supplied exceeds a total demand load for the plurality of buildings. And if so, the networking control system commands one or more of the building automation controllers to operate one ore more of the buildings a reduced energy efficiency level, which may take the form of an optimization curve.

Description

    FIELD OF THE INVENTION
  • The present invention generally relates to systems and methods for balancing an electrical power grid with networked buildings, and more specifically to systems and methods for controlling an energy optimization level of the networked building with a network control system.
  • BACKGROUND OF THE INVENTION
  • An electric grid is a network of synchronized power providers and consumers connected by transmission and distribution lines and operated by one or more utility control centers. In common parlance, the phrase “power grid” generally refers to a transmission system for electricity. In the continental United States, there are three primary grids: the Eastern Interconnect, the Western Interconnect and the Texas Interconnect. In Alaska and Hawaii, several smaller systems interconnect parts of each state.
  • On a local or regional level, a local power grid may take the form of one or more power generation sources, various power transmission lines, and power consumers. Conventionally, local power grids have been manually controlled and for various reasons have been susceptible to “brown outs,” which is understood to be a reduction or cutback in electric power because of a power generation shortage, a mechanical failure, or unanticipated load requirements by the power consumers.
  • One newer type of electrical grid is called a smart grid because it increases the connectivity, automation and coordination between the power suppliers, power consumers and the networks that perform either long distance transmission or local distribution tasks. In one form, a smart grid is a digitally enabled electrical grid that gathers, distributes, and acts on information about the behavior of all participants (suppliers and consumers) in order to improve the efficiency, importance, reliability, economics, and sustainability of electricity services.
  • The term “smart grid” has been in use since about 2005 when the term was popularized in an article that appeared in the September/October issue of IEEE P&E Magazine (Vol. 3, No.5, pgs 34-41). A common element to most smart grids is the application of digital processing and communications to the power grid, making data flow and information management central to the smart grid.
  • Smart energy demand describes the energy user component of the smart grid. Smart energy demand is a broad concept that generally includes energy-users actively controlling the pre-heating or pre-cooling of buildings and/or actively reducing their peak demand loads.
  • Intelligent buildings can help on the demand side of the grid. An “intelligent building” is one equipped with an advanced building automation controller (BAC) that influences energy-relevant equipment and settings like HVAC, lighting or windows; senses energy-relevant information like occupancy, weather, or usage; and contains advanced control algorithms that go beyond plain PID (proportional, integral and derivative control function). See P. Palensky et al., “Demand Response with Functional Buildings using Simplified Process Models,” pp. 3230-3235 in IECON 2011-37th Annual Conference on IEEE Industrial Electronics Society, Melbourne, VIC, Nov. 2011 (http://www.palensky.org/pdf/Palensky2011a.pdf).
  • Such an advanced BAC can use weather forecasts, learn usage profiles or reschedule the operations of building systems in order to meet smart grid requirements. One key ingredient for operating in such a smart way is to know the dynamic behavior of the building. Model-based control needs such a building. model to determine the optimal control strategy. Unfortunately, existing simulation methods and tools are computationally very costly and therefore not suitable for a standard embedded building controller. Id.
  • Current control strategies for building automation consider the electric grid as a permanent source of energy, which does not constrain consumption at any time. While this still holds true most of the time it is predictable that the situation will change based on two factors: increasing energy consumption and integration of renewable energy sources like photovoltaic systems and wind farms. Id.
  • Building automation controllers (BAC) today are based on linear control theory implementing P, PI, and PID controllers (i.e., using proportional, integral and differential parts of the input signal) in the field level or even simpler on-off controllers. Information technology has pushed forward the automation and management level, resulting in a broad variety of BAC from different vendors covering all issues including control, monitoring, reporting, and maintenance for various application areas like indoor climate, lighting, security, and safety of persons and buildings. The control mechanisms are composed of a combination of linear control with digital control. A typical control strategy of a system (e.g., a heat pump) defines operation states that are changed based on input values. The implementation of such a control strategy is either done in a programming language or graphically by composing the control strategy out of predefined function blocks. The programmer has to place the blocks (which also include the linear controllers) and connect inputs and outputs. This graphical solution simplifies commissioning, since it is not necessary to debug the control strategy down to the level of single commands (as is necessary with programs). Id.
  • BRIEF SUMMARY OF THE INVENTION
  • The present invention is generally directed toward an electrical power grid having multiple, networked buildings that receive electrical power from one or more power generation sources. A networking control system communicates with a utility control center to obtain information regarding the amount of power being supplied by the power generation sources. The networking control system further obtains information from one or more building automation controllers that are controllably associated with a plurality of networked buildings. The networking control system determines whether the total amount of power being supplied exceeds a total demand load for the plurality of buildings. And if so, the networking control system commands one or more of the building automation controllers to operate one ore more of the buildings a reduced energy efficiency level, which may take the form of an optimization curve.
  • In one aspect of the present invention, an electric power grid system includes at least one electrical power generation source; a utility control center in communication with the at least one electrical power generation source; a networking control system in communication with the utility control center to receive data on a total amount of power supplied by the at least one electrical power generation source; and a plurality of buildings, each building having a building automation controller, the controllers in communication with one another and each controller in communication with the networking control system. In one embodiment, the networking control system is operable to compare the total amount of power supplied to a total demand load for the plurality of buildings, and based on the comparison the networking control system is operable to instruct one or more of the building automation controllers to reduce an energy optimization level of its respective building for a period of time.
  • In another aspect of the invention, a method for controlling a plurality of networked buildings, the method includes the steps of (1) receiving information from a utility control center regarding a total amount of power presently being supplied from one or more power generation sources; (2) communicating with a plurality of building automation controllers regarding information about building power loads for a plurality of networked buildings; (3) determining whether the total amount of power presently being supplied exceeds a total demand from the building power loads; and (4) transmitting instructions to at least one of the building automation controllers to reduce an energy optimization level of at least one of the networked buildings for a period of time.
  • In yet another aspect of the present invention, a networking control system includes a communications link to a utility control center to obtain information about an amount of power presently being supplied by one or more electrical power generation source; and a communications link to a plurality of building automation controller, the controllers in communication with one another, the controllers operable to adjust an energy optimization level of at least one building of a plurality of networked buildings. And in one embodiment, the networking control system is operable to compare a total amount of the power presently being supplied with a total demand load for the plurality of the networked buildings, and based on the comparison the networking control system is operable to instruct one or more of the building automation controllers to reduce the energy optimization level of the at least one building for a period of time.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Preferred and alternative embodiments of the present invention are described in detail below with reference to the following drawings:
  • FIG. 1 is a schematic system diagram of an electric power grid having at least one power generation source supplying power to a plurality of buildings that are in communication with a networking control system and a utility control center according to an embodiment of the present invention;
  • FIG. 2 is a front plan view of a display screen showing a listing of buildings that are and are not being controlled by the networking control system of FIG. 1 according to an embodiment of the present invention; and
  • FIG. 3 is a flow diagram showing a method of balancing an electrical power grid with networked buildings according to an embodiment of the present invention.
  • DETAILED DESCRIPTION OF THE INVENTION
  • In the following description, certain specific details are set forth in order to provide a thorough understanding of various embodiments of the invention. However, one skilled in the art will understand that the invention may be practiced without these details. In other instances, well-known structures associated with electrical power grids, which may include smart grid systems, HVAC systems, utility control centers, transmission or power lines, building automation controllers, communication networks, various computing and/or processing systems, various HVAC system operational parameters, and methods of operating any of the above with respect to one or more buildings have not necessarily been shown or described in detail to avoid unnecessarily obscuring descriptions of the embodiments of the invention.
  • In one embodiment of the present invention, an electrical power grid having multiple, networked buildings and one or more power sources may be balanced to minimize inefficiencies and costs on the supply (i.e., source) side of the grid. In general, the balancing of the networked buildings includes controlling an energy optimization level for each building using a networked control system that communicates directly with both a utility control center and the networked buildings. Alternatively stated, the balancing of the grid provides the ability to appropriately and temporally, preferably in real-time, balance the power load demands of the networked buildings vis-à-vis the supply capacities of the power generation sources.
  • By way of example and looking at the grid over the course of a single day, the demand load for each of the networked buildings will naturally increase or decrease depending on a variety of variables such as, but not limited to, the amount of people in the building and the outside weather conditions. Likewise on the supply side, the power output capacity for the power sources may also vary. For example, wind and solar power sources are dependent on the amount of wind and sun energy available, which naturally changes throughout the day.
  • In conventional electrical grids, it is common to shut down or deactivate one or more of the power sources when the overall demand loads decrease. Regardless of the power source, there is a cost associated with bringing that power source back online to an full operational capacity. A coal plant for instance will release extra amounts of Carbon Dioxide (CO2) into the atmosphere when being brought back online. A wind turbine will utilize additional energy to overcome the inherent friction in the turbine as the blades begin to rotate, and this is energy that could have been supplied.
  • Thus, one objective of the present invention is to reduce the load on the grid to prevent a “brown out,” which was previously defined as a reduction or cutback in electric power, especially as a result of a shortage, a mechanical failure, or overuse by consumers. Another objective of the present invention is to prevent or eliminate the need to take a power generation source offline, but instead keep it on-line and running at a reduced level (e.g., idling) while any operating efficiencies of the overall grid are dealt with on the demand side (e.g., by adjusting the energy optimization levels for one or more of the networked buildings).
  • FIG. 1 shows an electrical power grid 100 having a plurality of electrical power generation sources 102, a utility control center 104, a plurality of buildings 106, and a networking control system 108. For purposes of the present description, the buildings 106 are networked (i.e., interconnected) in that environmental control data or other information about the buildings may be obtained from, extracted from, or exchanged with other buildings and the networking control system 108 by way of building automation controllers (BACs) 109. The networking control system 108 may transmit, receive and exchange computer readable instructions or other encoded signals with the BACs 109. The flow of information to/from the BACs 109 and networking control system 108 may be accomplished using a wired or wireless communication platform 110. In one embodiment, the network control system 108 and the BACs 109 are connected to a local area network or a wide area network, such as the Internet.
  • The power generation sources 102 may take a variety of forms such as, but not limited to, a wind powered generation source 102 a, a solar powered generation source 102 b, a coal powered generation source 102 c, or a nuclear powered generation source 102 d. Likewise, the networked buildings 106 may take a variety of forms such as, but not limited to, an office building 106 a, a medical building 106 b, or a residential building 106 c. For the present description, a building may generally include any structure that utilizes a heating, ventilation and air conditioning (HVAC) system and demands a non-zero electrical load. Likewise, the term “load” generally means an electrical power requirement required by the building's HVAC or lighting system to keep the building in a desired state. As mentioned above, the load required by a particular building often fluctuates throughout the day due to temperature changes, weather changes, time of day (e.g., primary work hours), etc.
  • On the supply side of the grid, the power generation sources 102 supply electrical power through one or more supply transmission lines 112. The utility control center 104 communicates with the power generation sources 102 by way of a wireless or non-wireless communication platform 113 (shown in dashed lines to distinguish from the transmission lines 112).
  • On the demand side, the buildings 104 receive the electrical power from demand transmission lines 114, which may interface with or be the same as the supply transmission lines 112. Similarly, the utility control center 104 communicates with the networking control system 108 by way of a wireless or non-wireless communication platform 116. In turn, the networking control system 108 communicates with each of the BACs 109, as described in more detail below.
  • The BACs 109 receive information from the respective building's HVAC system, lighting system or some other environmental control system (for purposes of brevity hereinafter all the various systems will simply be referred to as the HVAC system). In one embodiment, the BACs 109 include various executable programs for determining a real time operating efficiency, simulating a predicted or theoretical operating efficiency, comparing the same, and then adjusting one or more operating parameters on equipment utilized by a building's HVAC system. In one embodiment the executable programs control variable speed loop cooling plants to establish a decrease or increase of energy usage for the building's HVAC system.
  • In addition, at least one or more of the executable algorithms employed by the BACs 109 may comport with an equal marginal performance principle such as provided in an article entitled “Designing Efficient Systems with the Equal Marginal Performance Principle,” ASHRAE Journal, Vol. 47, No. 7, July 2005, which is incorporated herein by reference in its entirety. Additionally or alternatively, at least one or more of the executable algorithms employed by the BACs 109 may comport with a sequencing control strategy for chillers in an all variable speed chiller plant or some other control strategy that includes adjusting one or more numerical constants associated with the operation of an HVAC system. By way of example, the numerical values may be related to a variety of HVAC system components such as, but not limited to, centrifugal pumps, fans, and variable speed drive centrifugal chillers. In one embodiment, the numerical values are derived and/or adjusted based on the likelihood that more HVAC equipment operates in parallel and on-line near its natural operating curve.
  • In some embodiments, the BACs 109 may communicate with an all-variable speed system to compensate for changes to equipment or operating conditions automatically, using self-correcting computer executable instructions. The BACs 109, in communication with and with information from the networking control system 108, may advantageously provide an automated technique to replace the current manual tuning methods used to tune the HVAC system for one or more of the networked buildings 106. In other embodiments, the networking control system 108 automatically corrects the operation of the BACs to compensate for changes in HVAC equipment characteristics or external building load characteristics that may be attributed to the building and local climate. In one embodiment, the BACs 109 may include or operate as a self-learning controller as described in U.S. Patent Publication No. 2010/0114385, which is also incorporated by reference in its entirety.
  • Still referring to FIG. 1, the networking control system 108 communicates with a database 118 that includes information about whether a particular building 106 is in a network that includes the networked buildings 106. By way of example and referring briefly to FIG. 2, the database 118 includes a list of buildings 106 and a corresponding list of real-time demand loads 120 for each building. In one embodiment, the database 118 includes continuously updated information regarding one or more environmental parameters about the plurality of buildings. Such parameters may include, but are not limited to, total building power (e.g., KW), total building load (e.g., tons/BTUh), building efficiencies, power usage, and building temperature. If the particular building is not in the network then it may be identified as “not commissioned.” However, other terms or phrases may be used to indicate a non-networked building. In some cases if the building is “not commissioned” then the networking control system 108 will be unable to obtain the demand loads 120, however other buildings may be “not commissioned” and still be able to provide their demand loads 120 through one or more communication platforms.
  • In one embodiment, the networking control system 108 may include a pricing module configured to determine electric rates of the networked buildings based on a calculated operating efficiency determined during peak and off-peak periods. Based on this, reduced power rates may be offered to networked buildings that permit energy optimization control during certain times.
  • FIG. 3 shows an energy optimization chart 300 for one of the networked buildings. During the course of a day, for example, the BAC will attempt to keep its respective building at 100% optimized or close thereto, which means a real-time energy efficiency is equal to or substantially equal to a theoretical energy efficiency for the building. Thus, if a building is less than 100% optimized then the building is using more energy than it needs to meet its demand load. Thus on the chart 300, the vertical axis 302 indicates the percentage of optimization for a networked building while the horizontal axis 304 indicates time.
  • In one embodiment of the invention, the BAC can vary the optimization percentage using one or more of the executable algorithms or control strategies, which have been previously described above. Further, the BAC may be controlled or commanded by the networking control system 108 to follow a particular percentage optimization curve other than 100% optimized, such as an optimization curve 306 as shown in the illustrated embodiment.
  • By way of example, if there is too much power being supplied by the power sources and the utility control center determines it does not want to bring one or more of the power sources offline, then the networking control system 108 may balance the incoming power over the networked buildings by instructing one or more of the buildings to operate below a 100% optimized level. The building represented by optimization curve 306 is shown operating at a 50% optimization level to keep one or more of the power sources from having to go completely offline. As needed, the optimization level of the building may be decreased below 50% for a period of time, which may be energy inefficient when it comes to that particular building, but in the aggregate be more energy efficient with respect to the entire grid, especially as compared to bring one or more power sources completely offline. The optimization curve 306 further shows that as the demand loads increase for other networked buildings and/or the power output from one or more of the power sources decreases then the percentage optimization of the represented building may be increased up to the 100% optimization level. This controlled shifting of the optimization curve for each networked building results in a balanced grid capable of smoothly adjusting to the ebbs, flows, peaks and valleys of the supply and demand within the grid.
  • Now referring to FIG. 4 and also referring back to FIG. 1, FIG. 4 shows a flow diagram of a method 400 for balancing an electrical grid with networked buildings. At 402, the utility control center 104 receives operating data regarding a total amount of power presently being supplied by one or more of the power generation sources 102. This information is provided to the networking control system 108, which in turn determines whether the total amount of power presently being supplied exceeds a total amount of demand load for the networked buildings 106. If not, then the utility control center 104 continues to monitor the power supplied by the power sources and may also communicate with one or more of the power sources to increase its supplied power output.
  • However, if the total amount of power presently being supplied does exceed the total amount of demand load for the networked buildings 106, then at 406 the networking control system 108 instructs at least one of the BACs 109 to decrease an energy optimization level of its respective building. The decreased optimization level may follow an optimization curve similar to the one illustrated in FIG. 3. Accordingly, the respective building will operate at a reduced energy efficiency level for an amount of time determined by the networking control system 108, which continually communicates with the utility control center 104. If the building demand loads greatly exceed the total power supplied then multiple BACs may be commanded to control their respective buildings at a sub-optimized level for the same or differing periods of time.
  • At least one embodiment of the present invention may advantageously prevent brown outs from occurring during high demand cycles, low power supply cycles or some combination of each. In addition, it may advantageously allow excess power to be utilized, albeit more inefficiently, by the networked buildings instead of bringing an entire power source offline. This power management strategy may, in the aggregate and over time, actually save energy and minimize or eliminate unwanted pollutants that may enter the atmosphere during the start-up cycle of certain types of power sources. Other advantages will also be apparent to those of skill in the art.
  • While the preferred embodiment of the invention has been illustrated and described, as noted above, many changes can be made without departing from the spirit and scope of the invention. Accordingly, the scope of the invention is not limited by the disclosure of the preferred embodiment. Instead, the invention should be determined entirely by reference to the claims that follow.

Claims (15)

The embodiments of the invention in which an exclusive property or privilege is claimed are defined as follows:
1. An electric power grid system comprising:
at least one electrical power generation source;
a utility control center in communication with the at least one electrical power generation source;
a networking control system in communication with the utility control center to receive data on a total amount of power supplied by the at least one electrical power generation source; and
a plurality of buildings, each building having a building automation controller, the controllers in communication with one another and each controller in communication with the networking control system,
wherein the networking control system is operable to compare the total amount of power supplied to a total demand load for the plurality of buildings, and based on the comparison the networking control system is operable to instruct one or more of the building automation controllers to reduce an energy optimization level of its respective building for a period of time.
2. The electric power grid system of claim 1, wherein the networking control system is configured to access a database identifying the plurality of buildings.
3. The electric power grid system of claim 2, wherein the database includes continuously updated information regarding one or more environmental parameters about the plurality of buildings.
4. The electric power grid system of claim 1, wherein the at least one electrical power generation source provides a variable power supply.
5. The electric power grid system of claim 1, wherein the building automation controllers are configured to control selected HVAC system components.
6. The electric power grid of claim 1, further comprising a pricing module configured to determine electric rates of the networked buildings based on a calculated operating efficiency determined during peak and off-peak periods.
7. The electric power grid of claim 1, wherein the energy optimization level follows an energy optimization curve determined by the networking control system.
8. A method for controlling a plurality of networked buildings, the method comprising:
receiving information from a utility control center regarding a total amount of power presently being supplied from one or more power generation sources;
communicating with a plurality of building automation controllers regarding information about building power loads for a plurality of networked buildings;
determining whether the total amount of power presently being supplied exceeds a total demand from the building power loads; and
transmitting instructions to at least one of the building automation controllers to reduce an energy optimization level of at least one of the networked buildings for a period of time.
9. The method of claim 8, further comprising determining a reduced rate pricing structure for networked buildings permitting energy optimization control during selected time periods.
10. The method of claim 8, wherein transmitting instructions includes providing a predetermined optimization curve to be utilized by one or more of the building automation controllers.
11. The method of claim 8, wherein communicating with the plurality of building automation controllers includes accessing a database having demand load information for at least some of the plurality of buildings.
12. A networking control system comprising:
a communications link to a utility control center to obtain information about an amount of power presently being supplied by one or more electrical power generation source; and
a communications link to a plurality of building automation controller, the controllers in communication with one another, the controllers operable to adjust an energy optimization level of at least one building of a plurality of networked buildings,
wherein the networking control system is operable to compare a total amount of the power presently being supplied with a total demand load for the plurality of the networked buildings, and based on the comparison the networking control system is operable to instruct one or more of the building automation controllers to reduce the energy optimization level of the at least one building for a period of time.
13. The networking control system of claim 1, further comprising a database having one or more environmental parameters about the plurality of networked buildings.
14. The networking control system of claim 2, wherein the database includes continuously updated information regarding the one or more environmental parameters.
15. The networking control system of claim 1, wherein the energy optimization level follows an energy optimization curve determined by the networking control system.
US13/543,520 2012-07-06 2012-07-06 Systems and methods for balancing an electrical grid with networked buildings Abandoned US20140012429A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US13/543,520 US20140012429A1 (en) 2012-07-06 2012-07-06 Systems and methods for balancing an electrical grid with networked buildings
US14/299,293 US20140379139A1 (en) 2012-07-06 2014-06-09 Systems and methods for balancing an electrical grid with networked buildings
US15/593,094 US11221597B2 (en) 2012-07-06 2017-05-11 Systems and methods for balancing an electrical grid with networked buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US13/543,520 US20140012429A1 (en) 2012-07-06 2012-07-06 Systems and methods for balancing an electrical grid with networked buildings

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US14/299,293 Continuation-In-Part US20140379139A1 (en) 2012-07-06 2014-06-09 Systems and methods for balancing an electrical grid with networked buildings
US15/593,094 Continuation US11221597B2 (en) 2012-07-06 2017-05-11 Systems and methods for balancing an electrical grid with networked buildings

Publications (1)

Publication Number Publication Date
US20140012429A1 true US20140012429A1 (en) 2014-01-09

Family

ID=49879139

Family Applications (2)

Application Number Title Priority Date Filing Date
US13/543,520 Abandoned US20140012429A1 (en) 2012-07-06 2012-07-06 Systems and methods for balancing an electrical grid with networked buildings
US15/593,094 Active 2033-08-14 US11221597B2 (en) 2012-07-06 2017-05-11 Systems and methods for balancing an electrical grid with networked buildings

Family Applications After (1)

Application Number Title Priority Date Filing Date
US15/593,094 Active 2033-08-14 US11221597B2 (en) 2012-07-06 2017-05-11 Systems and methods for balancing an electrical grid with networked buildings

Country Status (1)

Country Link
US (2) US20140012429A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2899674A1 (en) * 2014-01-24 2015-07-29 Fujitsu Limited Demand response aggregation optimization
JP2015138424A (en) * 2014-01-23 2015-07-30 株式会社日立製作所 Electric heat accommodation system
EP3002848A1 (en) * 2014-09-30 2016-04-06 Schneider Electric USA, Inc. Demand-side grid-level load balancing aggregation system
US20160099607A1 (en) * 2014-10-03 2016-04-07 Active Power, Inc. Uninterrupted power supply systems and methods
US20170075321A1 (en) * 2015-07-30 2017-03-16 Parkeon Unknown
US20180316221A1 (en) * 2017-04-27 2018-11-01 Honeywell International Inc. System and approach to integrate and manage diverse demand response specifications for multi-site enterprises
US20190109891A1 (en) * 2018-12-03 2019-04-11 Intel Corporation Virtual electrical networks
US10637240B2 (en) 2014-01-24 2020-04-28 Fujitsu Limited Energy curtailment event implementation based on uncertainty of demand flexibility
WO2020088206A1 (en) * 2018-10-31 2020-05-07 国电南瑞科技股份有限公司 Weight and constraint associated adjustment-based real-time power generation control optimization decision method for power grid

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10101731B2 (en) 2014-05-01 2018-10-16 Johnson Controls Technology Company Low level central plant optimization

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4064485A (en) * 1976-07-22 1977-12-20 Pacific Technology, Inc. Digital load control circuit and method for power monitoring and limiting system
US20050033707A1 (en) * 2002-03-28 2005-02-10 Ehlers Gregory A. Configurable architecture for controlling delivery and/or usage of a commodity
US20050165511A1 (en) * 2004-01-23 2005-07-28 Matthew Fairlie Energy network
US20070271006A1 (en) * 2006-05-18 2007-11-22 Gridpoint, Inc. Modular energy control system
US20090105888A1 (en) * 2007-11-08 2009-04-23 Sequentric Energy Systems, Llc Methods, circuits, and computer program products for generation following load management
US7590472B2 (en) * 2006-11-09 2009-09-15 Gridpoint, Inc. Energy arbitrage by load shifting
US7715951B2 (en) * 2007-08-28 2010-05-11 Consert, Inc. System and method for managing consumption of power supplied by an electric utility
US20100145534A1 (en) * 2007-08-28 2010-06-10 Forbes Jr Joseph W System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
US20110106328A1 (en) * 2009-11-05 2011-05-05 General Electric Company Energy optimization system
US20130015713A1 (en) * 2010-03-30 2013-01-17 Sanyo Electric Co., Ltd. System stabilization system, electric power supply and demand adjustment device, control device for electric power supply and demand adjustment device, electric power supply and demand adjustment method, and electric power supply and demand adjustment method using storage battery
US20130038122A1 (en) * 2011-08-08 2013-02-14 Jay Andrew Broniak Managing excess renewable energy
US20130086404A1 (en) * 2011-10-03 2013-04-04 Microsoft Corporation Power regulation of power grid via datacenter
US8437882B2 (en) * 2010-02-17 2013-05-07 Inscope Energy, Llc Managing power utilized within a local power network
US8583288B1 (en) * 2010-05-28 2013-11-12 Comverge, Inc. System and method for using climate controlled spaces as energy storage units for “receiving” surplus energy and for “supplying” energy when needed

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103941591A (en) 2008-10-31 2014-07-23 优化能源有限公司 System and method to control energy consumption efficiency
WO2013110164A1 (en) 2012-01-26 2013-08-01 S. A. Armstrong Limited Method and system for prioritizing a plurality of variable speed devices
US9829868B2 (en) 2012-12-12 2017-11-28 S.A. Armstrong Limited Co-ordinated sensorless control system

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4064485A (en) * 1976-07-22 1977-12-20 Pacific Technology, Inc. Digital load control circuit and method for power monitoring and limiting system
US20050033707A1 (en) * 2002-03-28 2005-02-10 Ehlers Gregory A. Configurable architecture for controlling delivery and/or usage of a commodity
US20050165511A1 (en) * 2004-01-23 2005-07-28 Matthew Fairlie Energy network
US20070271006A1 (en) * 2006-05-18 2007-11-22 Gridpoint, Inc. Modular energy control system
US7590472B2 (en) * 2006-11-09 2009-09-15 Gridpoint, Inc. Energy arbitrage by load shifting
US7715951B2 (en) * 2007-08-28 2010-05-11 Consert, Inc. System and method for managing consumption of power supplied by an electric utility
US20100145534A1 (en) * 2007-08-28 2010-06-10 Forbes Jr Joseph W System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
US20090105888A1 (en) * 2007-11-08 2009-04-23 Sequentric Energy Systems, Llc Methods, circuits, and computer program products for generation following load management
US20110106328A1 (en) * 2009-11-05 2011-05-05 General Electric Company Energy optimization system
US8437882B2 (en) * 2010-02-17 2013-05-07 Inscope Energy, Llc Managing power utilized within a local power network
US20130015713A1 (en) * 2010-03-30 2013-01-17 Sanyo Electric Co., Ltd. System stabilization system, electric power supply and demand adjustment device, control device for electric power supply and demand adjustment device, electric power supply and demand adjustment method, and electric power supply and demand adjustment method using storage battery
US8583288B1 (en) * 2010-05-28 2013-11-12 Comverge, Inc. System and method for using climate controlled spaces as energy storage units for “receiving” surplus energy and for “supplying” energy when needed
US20130038122A1 (en) * 2011-08-08 2013-02-14 Jay Andrew Broniak Managing excess renewable energy
US20130086404A1 (en) * 2011-10-03 2013-04-04 Microsoft Corporation Power regulation of power grid via datacenter

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015138424A (en) * 2014-01-23 2015-07-30 株式会社日立製作所 Electric heat accommodation system
US10637240B2 (en) 2014-01-24 2020-04-28 Fujitsu Limited Energy curtailment event implementation based on uncertainty of demand flexibility
EP2899674A1 (en) * 2014-01-24 2015-07-29 Fujitsu Limited Demand response aggregation optimization
EP3002848A1 (en) * 2014-09-30 2016-04-06 Schneider Electric USA, Inc. Demand-side grid-level load balancing aggregation system
US20160099607A1 (en) * 2014-10-03 2016-04-07 Active Power, Inc. Uninterrupted power supply systems and methods
US10211667B2 (en) * 2014-10-03 2019-02-19 Piller Usa, Inc. Uninterrupted power supply systems and methods
US20170075321A1 (en) * 2015-07-30 2017-03-16 Parkeon Unknown
US10642230B2 (en) * 2015-07-30 2020-05-05 Flowbird Management method for managing installation including power supply device, computer program product, information medium, and associated management system
US20180316221A1 (en) * 2017-04-27 2018-11-01 Honeywell International Inc. System and approach to integrate and manage diverse demand response specifications for multi-site enterprises
US10541556B2 (en) * 2017-04-27 2020-01-21 Honeywell International Inc. System and approach to integrate and manage diverse demand response specifications for multi-site enterprises
WO2020088206A1 (en) * 2018-10-31 2020-05-07 国电南瑞科技股份有限公司 Weight and constraint associated adjustment-based real-time power generation control optimization decision method for power grid
US20190109891A1 (en) * 2018-12-03 2019-04-11 Intel Corporation Virtual electrical networks
US10880362B2 (en) * 2018-12-03 2020-12-29 Intel Corporation Virtual electrical networks

Also Published As

Publication number Publication date
US20170315580A1 (en) 2017-11-02
US11221597B2 (en) 2022-01-11

Similar Documents

Publication Publication Date Title
US11221597B2 (en) Systems and methods for balancing an electrical grid with networked buildings
US20140379139A1 (en) Systems and methods for balancing an electrical grid with networked buildings
Hao et al. Ancillary service to the grid through control of fans in commercial building HVAC systems
US10169833B2 (en) Using customer premises to provide ancillary services for a power grid
Meng et al. Coordinated dispatch of virtual energy storage systems in smart distribution networks for loading management
Dai et al. A decentralized algorithm for optimal distribution in HVAC systems
CN109416191B (en) Variable refrigerant flow system with predictive control
US20180323994A1 (en) Intelligent equipment sequencing
Katipamula et al. Small-and medium-sized commercial building monitoring and controls needs: A scoping study
CN102301288A (en) Systems And Methods To Control Energy Consumption Efficiency
Shabshab et al. Demand smoothing in military microgrids through coordinated direct load control
Petrie et al. Energy efficient control methods of HVAC systems for smart campus
Himpe et al. GEOTABS concept and design: state-of-the-art, challenges and solutions
Khalid et al. Demand response management for power throttling air conditioning loads in residential smart grids
Bara et al. Model-free load control for high penetration of solar photovoltaic generation
Vrettos et al. Integrating large shares of heterogeneous thermal loads in power system frequency control
Vrettos Control of residential and commercial loads for power system ancillary services
CN116592417A (en) Centralized heating system optimal control method and system based on load prediction
Ma et al. Web based chiller plant optimal control-A case study
CN113534703B (en) Heating and ventilation combined machine energy-saving system and control method thereof
Woody et al. Net zero building cluster energy systems analysis for US army installations
KR102520203B1 (en) Energy saving control method linking solar power generation system and air conditioning system
Cheze et al. Semi-virtual dynamic tests of hybrid systems coupling solar thermal and PV panels with Heat Pumps
CN116147128A (en) Energy-saving control method and system for heating ventilation air conditioner
Walgama et al. A Stepwise Approach Based Optimal Energy Utilization Scheme for HVAC Secondary Chilled Water Pumps in Commercial Buildings

Legal Events

Date Code Title Description
AS Assignment

Owner name: OPTIMUM ENERGY, LLC, WASHINGTON

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:DEMPSTER, IAN;REEL/FRAME:028569/0347

Effective date: 20120716

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION