US20110061869A1 - Formation of Fractures Within Horizontal Well - Google Patents

Formation of Fractures Within Horizontal Well Download PDF

Info

Publication number
US20110061869A1
US20110061869A1 US12/558,747 US55874709A US2011061869A1 US 20110061869 A1 US20110061869 A1 US 20110061869A1 US 55874709 A US55874709 A US 55874709A US 2011061869 A1 US2011061869 A1 US 2011061869A1
Authority
US
United States
Prior art keywords
tunnel
horizontal wellbore
forming
extending
subterranean zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/558,747
Inventor
Hazim H. Abass
Ashraf M. Tahini
Mohamed Y. Soliman
David Meadows
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Saudi Arabian Oil Co
Halliburton Energy Services Inc
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Priority to US12/558,747 priority Critical patent/US20110061869A1/en
Priority to PCT/US2010/048612 priority patent/WO2011032083A1/en
Assigned to HALLIBURTON ENERGY SERVICES, INC. reassignment HALLIBURTON ENERGY SERVICES, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: MEADOWS, DAVID, SOLIMAN, MOHAMED Y.
Assigned to SAUDI ARABIAN OIL COMPANY reassignment SAUDI ARABIAN OIL COMPANY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ABASS, HAZIM H., TAHINI, ASHRAF M.
Publication of US20110061869A1 publication Critical patent/US20110061869A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimizing the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimizing the spacing of wells comprising at least one inclined or horizontal well

Definitions

  • This disclosure relates to forming transverse fractures into a subterranean zone from a horizontal well and more particularly to using a tunnel extending from the horizontal wellbore as a transverse fracture initiation location.
  • Reservoir stimulation may be used to enhance recovery of reservoir fluids from a subterranean reservoir or zone.
  • An example reservoir stimulation is hydraulic fracturing (interchangeably referred to as “fracturing”) in which fluid is pumped into a wellbore at an elevated pressure to form one or more fractures in the subterranean reservoir bordering the wellbore.
  • the fractures formed during fracturing provide flow conduits emanating from the wellbore, providing flowpaths for the reservoir fluid to collect in the wellbore and subsequently be produced to the surface.
  • One aspect of the present disclosure is directed to a method of forming transverse fractures extending from a horizontal wellbore.
  • the method may include forming a wellbore having a horizontal wellbore portion within a subterranean zone and forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden.
  • the tunnel may be formed with a length adapted to initiate a fracturing extending from the tunnel along a longitudinal axis thereof being influenced insignificantly by the horizontal wellbore portion.
  • the method may also include applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form a fracture extending from the tunnel along a longitudinal axis thereof and propagating the initiated fracture to encompass the horizontal wellbore portion.
  • a second aspect is directed to a wellbore system including a horizontal wellbore extending through a subterranean zone and at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden.
  • the at least one tunnel may have a length adapted to form transverse fractures relative to the horizontal wellbore.
  • a third aspect is directed to a method of forming fractures transverse to a horizontal wellbore including forming a wellbore having a horizontal wellbore portion within a subterranean zone and forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden.
  • the tunnel may be formed with a length such that the horizontal wellbore portion has insignificant effects on formation of a fracture extending from the tunnel along a longitudinal axis thereof
  • the method may also include applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form the fracture extending from the tunnel along the longitudinal axis thereof and propagating the initiated fracture to encompass the horizontal wellbore portion.
  • Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with one of a hydrajet, a laser, or a drilling tool.
  • Forming the tunnel with a hydrajet may include disposing a hydrajet into the horizontal wellbore portion at a desired location therein, orienting the hydrajet to form the tunnel, and operating the hydrajet to impinge a fluid flow onto a surface of the horizontal wellbore portion to form the tunnel.
  • Forming the tunnel with a laser may include disposing a laser into the substantially horizontal wellbore portion, orienting the laser to form the tunnel, and operating the laser to form the tunnel.
  • Forming the tunnel with a drilling tool may include disposing a drilling tool into the substantially horizontal wellbore portion, orienting the drilling tool to form the tunnel, and operating the drilling tool to form the tunnel.
  • At least a portion of the horizontal wellbore may include a slanted portion, and the tunnel may extend from the slanted portion of the horizontal wellbore.
  • the at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden may include a first substantially vertical tunnel extending from a first portion of the horizontal wellbore and a second substantially vertical tunnel extending from a second portion of the horizontal wellbore along a perimeter thereof opposite the first portion.
  • the at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore may include a tunnel having a length of at least one and a half (1.5) times a radius of the horizontal wellbore, a tunnel having a length of at least three (3) times a radius of the horizontal wellbore, or a tunnel having a length of at least six (6) times a radius of the horizontal wellbore.
  • Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with a length of at least one and a half (1.5) times a radius of the horizontal wellbore portion, forming the tunnel with a length of at least three (3) times a radius of the horizontal wellbore portion, or forming the tunnel with a length of at least six (6) times a radius of the horizontal wellbore portion.
  • Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include inserting a tool in the horizontal wellbore portion and orienting the tool into a desired orientation to form the tunnel.
  • FIG. 1 shows a wellbore extending from a terranean surface into a subterranean zone.
  • FIG. 2 shows a longitudinal fracture extending from a horizontal portion of a wellbore.
  • FIG. 3 shows a longitudinal fracture extending from a horizontal wellbore.
  • FIG. 4 shows transverse fractures extending from a horizontal portion of a wellbore.
  • FIG. 5 shows a transverse fracture extending from a horizontal wellbore.
  • FIG. 6 is a view along an axis of a horizontal wellbore in which a transverse fracture extends from the horizontal wellbore.
  • FIG. 7 shows a longitudinal fracture extending from a vertical wellbore.
  • FIG. 8 shows a tunnel extending from a portion of a horizontal wellbore.
  • FIG. 9 shows first and second tunnels extending vertically from opposite locations along a perimeter of a horizontal wellbore.
  • FIG. 10 is a cross-sectional view along A-A in FIG. 8 showing a transverse fracture surrounding the horizontal wellbore that was initiated from the tunnel.
  • FIG. 11 is a cross-sectional view along B-B in FIG. 9 showing a transverse fracture surrounding the horizontal wellbore that was initiated from the tunnel.
  • FIGS. 12-14 illustrate the formation of a transverse fracture relative to a horizontal wellbore.
  • FIG. 15 is a summary table of experimentation data.
  • FIGS. 16-22 are schematic diagrams illustrating the configuration of the bores extending through various test samples.
  • FIG. 1 shows a wellbore 10 having a substantially horizontal portion (hereinafter referred to as “horizontal wellbore”) 20 .
  • the wellbore 10 extends from a terranean surface 30 and extends into a subterranean zone 40 .
  • the subterranean zone 40 may be subjected to a fracturing operation to enhance production of the reservoir fluids.
  • fracturing was performed, for example, by isolating a relatively small section of the wellbore 10 (such as with one or more packers) and injecting a fluid into the isolated section at high pressure.
  • the high pressure fluid increased the stress state of the subterranean zone 40 resulting in the formation of fractures extending into the subterranean zone.
  • controlling the orientation of the produced fracturing with respect to the wellbore 10 using this fracturing method was difficult, resulting in high friction pressure and sometimes creating axial fractures (also referred to herein as longitudinal fractures). In some instances, as the axially fractures propagated, the axial fractures would become re-oriented so as to be perpendicular to the minimum stress of the subterranean zone 40 .
  • FIGS. 2 and 3 illustrate longitudinal fractures 50 extending longitudinally along an axis 60 of the horizontal wellbore 20 .
  • Longitudinal fractures are not optimum and generally result in reduced production in comparison to transverse fractures formed in a horizontal wellbore.
  • FIGS. 4-6 illustrate transverse fractures 70 formed in the subterranean zone 40 bordering the horizontal wellbore 20 . Further, longitudinal fractures are generally more likely to result when fracturing a horizontal wellbore.
  • FIG. 7 illustrates longitudinal fractures 50 extending from a vertical well. This characteristic can be utilized to promote formation of transverse fractures in a horizontal well.
  • one or more bores or tunnels 80 may be extended from a horizontal wellbore 20 and used to promote the formation of a transverse fracture about the horizontal wellbore 20 .
  • the one or more tunnels 80 may extend towards the overburden. Generally, this means that the one or more tunnels 80 extend vertically or substantially vertically from the horizontal wellbore 20 .
  • forming the one or more tunnels 80 towards the overburden is described as being formed vertical or substantially vertical. However, it is understood that the tunnels 80 may be formed in a direction other than vertical or substantially vertical in situations where the overburden is not at a location vertically offset from the horizontal wellbore 20 . Further, the one or more tunnels 80 may deviate from vertical or substantial vertical by 15°. The tunnels 80 promote the initiation and propagation of fractures that are independent of influences associated with horizontal and vertical orientations aspects of the well.
  • FIG. 8 shows a single tunnel 80 extending substantially vertically from a first portion 82 of the horizontal wellbore 20
  • FIG. 9 shows a pair of tunnels 80 extending from the horizontal wellbore 20
  • one of the tunnels 80 extends from the first portion 82 of the horizontal wellbore 20
  • the second tunnel 80 extends from a second portion 84 of the horizontal wellbore 20 , opposite the first portion 82
  • both tunnels 80 are oriented vertically or substantially vertically so as to promote the formation of the transverse fracture relative to the horizontal wellbore 20 .
  • the horizontal wellbore 20 may also include numerous tunnels 80 formed along the length of the horizontal wellbore 20 .
  • a tunnel 80 may be included on the horizontal wellbore 20 at any location where a transverse fracture is desired.
  • the number of tunnels 80 formed into the subterranean zone 40 from the horizontal wellbore 20 may be dependent upon the number of transverse fractures 70 desired. Consequently, the number of tunnels may be determined according to the design of the stimulation activity.
  • FIGS. 10 and 11 show cross-sectional views of the horizontal wellbore 20 along lines A-A and B-B, respectively.
  • FIGS. 10 and 11 show example transverse fractures 70 extending into the subterranean zone 40 that were initiated at the tunnels 80 .
  • the tunnels 80 may be formed in any number of different ways.
  • one or more of the tunnels 80 may be formed mechanically, such as by drilling into the reservoir from the horizontal wellbore 20 .
  • one or more of the tunnels 80 may be formed using one or more lasers.
  • a laser device may be included on a tubing string extending into the horizontal wellbore 20 and used to form the tunnels 80 therefrom.
  • one or more of the tunnels 80 may be formed with a stream of pressurized fluid, e.g., by hydrajetting, which forces a concentrated jet of fluid at elevated pressures towards a point within a wellbore.
  • Example hydrajets that may be used are described in U.S. Pat. No. 5,361,856 and U.S. Pat. No. 5,494,103, each of which is incorporated herein by reference in their entirety.
  • a pressurized fluid is then introduced into the horizontal well 20 to form the transverse fracture 70 .
  • the tunnel 80 has a better defined elongated shape with less damage to the surrounding subterranean zone 40 .
  • This damage provides leak-off paths for the fracturing fluid to flow off into the subterranean zone 40 , thereby reducing the effective pressure exerted on the subterranean zone 40 to form the fractures therein, i.e., the damage to the surrounding subterranean zone 40 may cause an increase in the breakdown pressure required to fracture the subterranean zone 40 .
  • a plurality of perforations are formed in the subterranean zone 40 . These multiple perforations also act to lessen the effect of the pressurized fluid, because the multiple perforations require more pressure and fluid flow.
  • perforating a wellbore with a hydrajet expels a plurality of fluid streams through respective nozzles.
  • the fluid streams form a plurality of openings into the subterranean formation from the wellbore.
  • the effect of using the plurality of fluid streams results in enlarging the openings into an enlarged cavity formed in the subterranean zone surrounding the wellbore.
  • the pressurized fluid is introduced into the wellbore for fracturing, the enlarged cavity reduces the effectiveness of concentrating the pressurized fluid to initiate and propagate a fracture in a controlled manner.
  • present hydrajets for perforating a subterranean zone are also deficient in that the nozzles expelling the fluid streams are not capable of being aligned with a particular orientation within the wellbore and are, thus, incapable of aligning openings formed by the hydrajet with a desired orientation.
  • the subterranean zone 40 may then be fractured.
  • the pressurized fluid may be introduced into the horizontal wellbore 20 via a concentrated stream at or near the location of the tunnel(s) 80 .
  • a portion of the horizontal wellbore 20 including the tunnel(s) 80 is isolated according to any desired manner, and the pressurized fluid is introduced into the isolated portion of the horizontal wellbore 20 to form the transverse fracture 70 .
  • FIGS. 12-14 illustrate the progression of the fracture believed to occur at a location along a horizontal wellbore 20 having a tunnel 80 .
  • the pressurized fluid (represented by the plurality of arrows 90 ) is introduced into the horizontal wellbore 20 .
  • the longitudinal fracture 50 is formed extending from the tunnel 80 .
  • the initiated longitudinal fracture 50 extends and expands to encompass the horizontal wellbore 20 , thereby resulting in a transverse fracture 70 extending into the subterranean zone 40 , as shown in FIG. 14 .
  • the one or more tunnels 80 may have any desired length L. However, as the length L of the tunnel 80 increases, influences from the horizontal wellbore 20 during fracturing are reduced, resulting in a greater likelihood that a transverse fracture with respect to the horizontal wellbore 20 will result. These influences include how the horizontal wellbore 20 affects the stress state of the subterranean zone 40 surrounding the tunnels 80 during fracturing. Moreover, for a tunnel 80 having a length L of three (3) times the diameter D or six (6) times the radius of the horizontal wellbore, the influences from the horizontal wellbore 20 are negligible. In fact, the influences from the horizontal wellbore 20 are also small with respect to tunnels 80 having lengths L smaller than three times the diameter D of the horizontal wellbore 20 .
  • a horizontal wellbore 20 may have substantially inconsequential effects on a tunnel 80 having a length of three times the radius or more (e.g., three, three and a half, four, four and a half, five, and five and half times the radius of the horizontal wellbore).
  • a tunnel 80 having a length less than three times the radius of the horizontal wellbore 20 such as two and a half, two, and even one and a half times the radius of the horizontal wellbore 20 , may also form transverse fractures notwithstanding the larger, though non-detrimental, effects on the formation of the transverse fractures associated with these smaller lengths.
  • a further benefit of using one or more tunnels 80 is that the size of any isolated portion of the wellbore that may be used can be larger than conventionally isolated portions.
  • the pressurized fluid may be introduced into the horizontal wellbore 20 at or near the tunnel(s) 80 without isolating a portion of the horizontal wellbore 20 .
  • the manner of injecting the pressurized fluid into the horizontal wellbore 20 may be selected based on conditions associated with the wellbore 10 , the subterranean zone 40 , and/or any number of different considerations.
  • porosity of the subterranean zone 40 may affect the manner chosen for introducing the pressurized fluid into the horizontal wellbore 20 .
  • the tunnel 80 represents a vertical well, and, during fracturing of a vertical well, a longitudinal fracture more readily forms at a lower pressure.
  • a longitudinal fracture extending from a vertical wellbore more readily occurs because of the stress state of the subterranean zone. Fractures propagate perpendicular to the minimum principal stress in the subterranean zone. Generally, the minimum principal stress is oriented horizontally. Thus, for a vertical wellbore, longitudinal fractures are more likely to form and form more readily at lower breakdown pressures.
  • the tunnel 80 acts as a fracture initiation location for a longitudinal fracture with respect to the tunnel 80 . The fracture propagates to the horizontal wellbore perpendicular to the minimum principal stress of the subterranean zone.
  • the initiated fracture intersects the horizontal wellbore 20 irrespective of the orientation thereof. That is, the horizontal wellbore 20 may be oriented horizontally or substantially horizontally, or may be slanted within the subterranean zone 40 , and the fracture initiated at the tunnel 80 still extends to the horizontal wellbore 20 to form a transverse fracture relative thereto. For example, some horizontal wellbores may be slanted at one or more locations so as to follow a particular formation within a subterranean reservoir.
  • a wellbore extending through a subterranean zone, such as subterranean zone 40 that is horizontal, substantially horizontal, or that is at least partially slanted is considered horizontal within the scope of this disclosure.
  • the longitudinal fracture 50 formed from the tunnel 80 represents a transverse fracture with respect to the horizontal wellbore 20 . Consequently, forming the tunnel 80 permits the formation of a transverse fracture along the horizontal wellbore 20 using fluid at a lower fluid pressure than would otherwise be required to form a transverse fracture along a horizontal wellbore.
  • Use of the tunnel 80 also allows consistent formation of a transverse fracture 70 relative to the horizontal wellbore 20 . Further, depending on the downhole conditions, the pressurized fluid may be introduced without the need for isolating one or more portions of the well. Therefore, use of the tunnel 80 has lower associated fracturing costs. Moreover, the tunnel 80 is also believed to essentially eliminate the formation of multiple fractures and fracture tortuosity that may result during a fracturing operation.
  • FIG. 15 shows test summary data for six test samples. Each of the test samples were performed by casting a bore and, in some of the experiments, a vertical or substantially vertical tunnel extending therefrom in hydrostone, a gypsum cement. The hydrostone was prepared having a ratio of 30 parts of water per 100 parts of hydrostone.
  • FIGS. 16-22 show schematic diagrams of the configuration of the bores and, optionally, the tunnels within the hydrostone.
  • the wellbore may have a slant of greater than or less than 5° and still be within the scope of the disclosure.
  • the wellbore may have a slant of 15° or greater and a tunnel extending therefrom may still be operable to produce a transverse fracture at a relatively low fracture pressure.
  • FIG. 16 is an elevation view of a schematic of test sample 1 .
  • Test sample 1 was formed having a bore 100 having a casing 110 .
  • a tunnel 120 extends vertically or substantially vertically from the bore 100 .
  • the bore 100 was formed at approximately 5° from horizontal.
  • An interior of the tunnel was in communication with an interior of the bore via an opening formed in the casing 110 .
  • fluid pressure introduced into the bore 100 was exerted on the hydrostone (formation 130 ) via the tunnel 120 .
  • a fracture initiated at a fluid pressure of 3323 psi transverse to the bore 100 .
  • the fracture is believed to have initiated from the tunnel 120 and extended to encompass the bore 100 .
  • the fracture extended transverse to the minimum horizontal stress.
  • FIGS. 17 and 18 are schematic plan and elevation views, respectively, of test sample 2 .
  • Test sample 2 included an uncased bore 100 formed at approximately 5° from horizontal. The bore 100 was also formed at approximately 45° within a horizontal plane, as shown in the plan view of FIG. 17 .
  • the bore 100 of test sample 2 was not cased but did include a tunnel 120 extending vertically or substantially vertically from the bore 100 .
  • a fracture transverse to the bore 100 was initiated in the test sample at 2889 psi. The fracture is believed to have initiated at the tunnel 120 and extended to encompass the bore 100 . The resulting fracture extended past the bore 100 without causing multiple fractures.
  • FIG. 19 shows a schematic view of test sample 3 .
  • Test sample 3 included a bore 100 that was not cased and did not include a tunnel, and the bore 100 was formed at an angle of 5° from horizontal.
  • a fracture extending longitudinally along the bore 100 was formed at a fluid pressure of 3903 psi introduced into the bore 100 .
  • FIG. 20 shows a schematic elevation view of test sample 4 .
  • Test sample 4 included an uncased bore 100 formed at an angle of 5° from horizontal.
  • a vertical or substantially vertical tunnel 120 extended from the bore 100 .
  • Fluid pressure was introduced into the interior of the bore 100 and the tunnel 120 , which caused a fracture transverse to the bore 100 at a fluid pressure of 3596 psi. The fracture is believed to have initiated in the tunnel and propagated to encompass the bore 100 .
  • FIG. 21 shows a schematic elevation view of test sample 5 .
  • Test sample 5 included an uncased bore 100 formed at an angle of 5° from horizontal.
  • the bore 100 did not include a tunnel extending therefrom.
  • the bore 100 was subjected to an internal fluid pressure which, at a fluid pressure of 3525 psi, caused a fracture extending longitudinally along the bore 100 .
  • FIG. 22 shows a schematic elevation view of test sample 6 , which includes a vertical or substantially vertical uncased bore 100 . Fluid pressure was introduced into the bore 100 , resulting in a fracture extending longitudinally along the bore 100 at a fluid pressure of 2726 psi. Test sample 6 illustrates the tendency to forming fractures extending longitudinally along a vertical bore under stress conditions similar to those in an earth formation.

Abstract

Producing transverse fractures in a horizontal well may be achieved at a relatively lower fracturing pressure by forming one or more tunnels extending from the horizontal wellbore. One or more tunnels may be formed at each location along the horizontal wellbore where a transverse fracture is desired. The tunnel(s) may be formed mechanically, optically, or hydraulically. Further, fracturing may be formed at a lower pressure than would otherwise be required to form transverse fractures from a horizontal wellbore. According to some implementations, the transverse fractures may be formed without isolating a portion of the horizontal wellbore.

Description

    TECHNICAL FIELD
  • This disclosure relates to forming transverse fractures into a subterranean zone from a horizontal well and more particularly to using a tunnel extending from the horizontal wellbore as a transverse fracture initiation location.
  • BACKGROUND
  • Reservoir stimulation may be used to enhance recovery of reservoir fluids from a subterranean reservoir or zone. An example reservoir stimulation is hydraulic fracturing (interchangeably referred to as “fracturing”) in which fluid is pumped into a wellbore at an elevated pressure to form one or more fractures in the subterranean reservoir bordering the wellbore. The fractures formed during fracturing provide flow conduits emanating from the wellbore, providing flowpaths for the reservoir fluid to collect in the wellbore and subsequently be produced to the surface.
  • SUMMARY
  • One aspect of the present disclosure is directed to a method of forming transverse fractures extending from a horizontal wellbore. The method may include forming a wellbore having a horizontal wellbore portion within a subterranean zone and forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden. The tunnel may be formed with a length adapted to initiate a fracturing extending from the tunnel along a longitudinal axis thereof being influenced insignificantly by the horizontal wellbore portion. The method may also include applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form a fracture extending from the tunnel along a longitudinal axis thereof and propagating the initiated fracture to encompass the horizontal wellbore portion.
  • A second aspect is directed to a wellbore system including a horizontal wellbore extending through a subterranean zone and at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden. The at least one tunnel may have a length adapted to form transverse fractures relative to the horizontal wellbore.
  • A third aspect is directed to a method of forming fractures transverse to a horizontal wellbore including forming a wellbore having a horizontal wellbore portion within a subterranean zone and forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden. The tunnel may be formed with a length such that the horizontal wellbore portion has insignificant effects on formation of a fracture extending from the tunnel along a longitudinal axis thereof The method may also include applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form the fracture extending from the tunnel along the longitudinal axis thereof and propagating the initiated fracture to encompass the horizontal wellbore portion.
  • One or more of the aspects may include one or more of the following features. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include inserting a tool in the horizontal wellbore portion and orienting the tool into a desired orientation to form the tunnel. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming a first tunnel extending from a first portion of the horizontal wellbore portion and forming a second tunnel extending from a second portion of the horizontal wellbore portion opposite the first portion. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with one of a hydrajet, a laser, or a drilling tool. Forming the tunnel with a hydrajet may include disposing a hydrajet into the horizontal wellbore portion at a desired location therein, orienting the hydrajet to form the tunnel, and operating the hydrajet to impinge a fluid flow onto a surface of the horizontal wellbore portion to form the tunnel. Forming the tunnel with a laser may include disposing a laser into the substantially horizontal wellbore portion, orienting the laser to form the tunnel, and operating the laser to form the tunnel. Forming the tunnel with a drilling tool may include disposing a drilling tool into the substantially horizontal wellbore portion, orienting the drilling tool to form the tunnel, and operating the drilling tool to form the tunnel.
  • One or more of the aspects may also include one or more of the following features. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden at two or more different locations along an axial length of the horizontal wellbore portion. A portion of the horizontal wellbore may be isolated at a location of the tunnel before applying the fluid pressure. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with a length of at least one and a half (1.5) times a radius of the horizontal wellbore portion. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with a length of at least three (3) times a radius of the horizontal wellbore portion. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with a length of at least six (6) times a radius of the horizontal wellbore portion.
  • One or more of the aspects may additionally include one or more of the following features. At least a portion of the horizontal wellbore may include a slanted portion, and the tunnel may extend from the slanted portion of the horizontal wellbore. The at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden may include a first substantially vertical tunnel extending from a first portion of the horizontal wellbore and a second substantially vertical tunnel extending from a second portion of the horizontal wellbore along a perimeter thereof opposite the first portion. The at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore may include a tunnel having a length of at least one and a half (1.5) times a radius of the horizontal wellbore, a tunnel having a length of at least three (3) times a radius of the horizontal wellbore, or a tunnel having a length of at least six (6) times a radius of the horizontal wellbore.
  • One or more of the aspects may further include one or more of the following features. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with a length of at least one and a half (1.5) times a radius of the horizontal wellbore portion, forming the tunnel with a length of at least three (3) times a radius of the horizontal wellbore portion, or forming the tunnel with a length of at least six (6) times a radius of the horizontal wellbore portion. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include inserting a tool in the horizontal wellbore portion and orienting the tool into a desired orientation to form the tunnel. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with one of a hydrajet, a laser, or a drilling tool. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming a tunnel at two or more different locations along an axial length of the horizontal wellbore portion. A portion of the horizontal wellbore portion may be isolated at a location of the tunnel before applying the fluid pressure.
  • The details of one or more implementations are set forth in the accompanying drawings and the description below. Other features, objects, and advantages will be apparent from the description and drawings, and from the claims.
  • DESCRIPTION OF DRAWINGS
  • FIG. 1 shows a wellbore extending from a terranean surface into a subterranean zone.
  • FIG. 2 shows a longitudinal fracture extending from a horizontal portion of a wellbore.
  • FIG. 3 shows a longitudinal fracture extending from a horizontal wellbore.
  • FIG. 4 shows transverse fractures extending from a horizontal portion of a wellbore.
  • FIG. 5 shows a transverse fracture extending from a horizontal wellbore.
  • FIG. 6 is a view along an axis of a horizontal wellbore in which a transverse fracture extends from the horizontal wellbore.
  • FIG. 7 shows a longitudinal fracture extending from a vertical wellbore.
  • FIG. 8 shows a tunnel extending from a portion of a horizontal wellbore.
  • FIG. 9 shows first and second tunnels extending vertically from opposite locations along a perimeter of a horizontal wellbore.
  • FIG. 10 is a cross-sectional view along A-A in FIG. 8 showing a transverse fracture surrounding the horizontal wellbore that was initiated from the tunnel.
  • FIG. 11 is a cross-sectional view along B-B in FIG. 9 showing a transverse fracture surrounding the horizontal wellbore that was initiated from the tunnel.
  • FIGS. 12-14 illustrate the formation of a transverse fracture relative to a horizontal wellbore.
  • FIG. 15 is a summary table of experimentation data.
  • FIGS. 16-22 are schematic diagrams illustrating the configuration of the bores extending through various test samples.
  • DETAILED DESCRIPTION
  • Producing transverse fractures in a horizontal well is described. FIG. 1 shows a wellbore 10 having a substantially horizontal portion (hereinafter referred to as “horizontal wellbore”) 20. The wellbore 10 extends from a terranean surface 30 and extends into a subterranean zone 40. During the producing life of the wellbore 10, such as after formation of the wellbore 10 or at one or more occasions after the wellbore 10 has been producing reservoir fluids, the subterranean zone 40 may be subjected to a fracturing operation to enhance production of the reservoir fluids.
  • Previously, fracturing was performed, for example, by isolating a relatively small section of the wellbore 10 (such as with one or more packers) and injecting a fluid into the isolated section at high pressure. The high pressure fluid increased the stress state of the subterranean zone 40 resulting in the formation of fractures extending into the subterranean zone. However, controlling the orientation of the produced fracturing with respect to the wellbore 10 using this fracturing method was difficult, resulting in high friction pressure and sometimes creating axial fractures (also referred to herein as longitudinal fractures). In some instances, as the axially fractures propagated, the axial fractures would become re-oriented so as to be perpendicular to the minimum stress of the subterranean zone 40. The re-orientation of these fractures may lead to a sand out. That is, the fracture is unable to accept additional proppant during the fracturing operation and only the carrier fluid is injected into the formation through these fractures. FIGS. 2 and 3 illustrate longitudinal fractures 50 extending longitudinally along an axis 60 of the horizontal wellbore 20. Longitudinal fractures, though, are not optimum and generally result in reduced production in comparison to transverse fractures formed in a horizontal wellbore. FIGS. 4-6 illustrate transverse fractures 70 formed in the subterranean zone 40 bordering the horizontal wellbore 20. Further, longitudinal fractures are generally more likely to result when fracturing a horizontal wellbore.
  • Longitudinal fractures are also more likely to be formed in vertical wellbores at lower fluid pressures. That is, longitudinal fractures are formed from a vertical wellbore at a lower breakdown pressure. FIG. 7 illustrates longitudinal fractures 50 extending from a vertical well. This characteristic can be utilized to promote formation of transverse fractures in a horizontal well. Particularly, one or more bores or tunnels 80 may be extended from a horizontal wellbore 20 and used to promote the formation of a transverse fracture about the horizontal wellbore 20. The one or more tunnels 80 may extend towards the overburden. Generally, this means that the one or more tunnels 80 extend vertically or substantially vertically from the horizontal wellbore 20. For the purposes of this disclosure, forming the one or more tunnels 80 towards the overburden is described as being formed vertical or substantially vertical. However, it is understood that the tunnels 80 may be formed in a direction other than vertical or substantially vertical in situations where the overburden is not at a location vertically offset from the horizontal wellbore 20. Further, the one or more tunnels 80 may deviate from vertical or substantial vertical by 15°. The tunnels 80 promote the initiation and propagation of fractures that are independent of influences associated with horizontal and vertical orientations aspects of the well.
  • FIG. 8 shows a single tunnel 80 extending substantially vertically from a first portion 82 of the horizontal wellbore 20, while FIG. 9 shows a pair of tunnels 80 extending from the horizontal wellbore 20. In FIG. 9, one of the tunnels 80 extends from the first portion 82 of the horizontal wellbore 20, and the second tunnel 80 extends from a second portion 84 of the horizontal wellbore 20, opposite the first portion 82. Further, both tunnels 80 are oriented vertically or substantially vertically so as to promote the formation of the transverse fracture relative to the horizontal wellbore 20.
  • The horizontal wellbore 20 may also include numerous tunnels 80 formed along the length of the horizontal wellbore 20. Particularly, a tunnel 80 may be included on the horizontal wellbore 20 at any location where a transverse fracture is desired. Thus, the number of tunnels 80 formed into the subterranean zone 40 from the horizontal wellbore 20 may be dependent upon the number of transverse fractures 70 desired. Consequently, the number of tunnels may be determined according to the design of the stimulation activity.
  • FIGS. 10 and 11 show cross-sectional views of the horizontal wellbore 20 along lines A-A and B-B, respectively. FIGS. 10 and 11 show example transverse fractures 70 extending into the subterranean zone 40 that were initiated at the tunnels 80.
  • The tunnels 80 may be formed in any number of different ways. For example, one or more of the tunnels 80 may be formed mechanically, such as by drilling into the reservoir from the horizontal wellbore 20. According to other implementations, one or more of the tunnels 80 may be formed using one or more lasers. A laser device may be included on a tubing string extending into the horizontal wellbore 20 and used to form the tunnels 80 therefrom. According to still other implementations, one or more of the tunnels 80 may be formed with a stream of pressurized fluid, e.g., by hydrajetting, which forces a concentrated jet of fluid at elevated pressures towards a point within a wellbore. Example hydrajets that may be used are described in U.S. Pat. No. 5,361,856 and U.S. Pat. No. 5,494,103, each of which is incorporated herein by reference in their entirety. A pressurized fluid is then introduced into the horizontal well 20 to form the transverse fracture 70.
  • Unlike perforations formed in a wellbore, the tunnel 80 has a better defined elongated shape with less damage to the surrounding subterranean zone 40. This damage provides leak-off paths for the fracturing fluid to flow off into the subterranean zone 40, thereby reducing the effective pressure exerted on the subterranean zone 40 to form the fractures therein, i.e., the damage to the surrounding subterranean zone 40 may cause an increase in the breakdown pressure required to fracture the subterranean zone 40. Further, during a perforating operation, a plurality of perforations are formed in the subterranean zone 40. These multiple perforations also act to lessen the effect of the pressurized fluid, because the multiple perforations require more pressure and fluid flow.
  • Additionally, perforating a wellbore with a hydrajet expels a plurality of fluid streams through respective nozzles. The fluid streams form a plurality of openings into the subterranean formation from the wellbore. However, the effect of using the plurality of fluid streams results in enlarging the openings into an enlarged cavity formed in the subterranean zone surrounding the wellbore. Thus, when the pressurized fluid is introduced into the wellbore for fracturing, the enlarged cavity reduces the effectiveness of concentrating the pressurized fluid to initiate and propagate a fracture in a controlled manner. Further, present hydrajets for perforating a subterranean zone are also deficient in that the nozzles expelling the fluid streams are not capable of being aligned with a particular orientation within the wellbore and are, thus, incapable of aligning openings formed by the hydrajet with a desired orientation.
  • Once the one or more tunnels 80 are formed, the subterranean zone 40 may then be fractured. According to some implementations, the pressurized fluid may be introduced into the horizontal wellbore 20 via a concentrated stream at or near the location of the tunnel(s) 80. Alternately, a portion of the horizontal wellbore 20 including the tunnel(s) 80 is isolated according to any desired manner, and the pressurized fluid is introduced into the isolated portion of the horizontal wellbore 20 to form the transverse fracture 70.
  • It is believed that the introduced pressurized fluid works on the tunnel 80 to form a longitudinal fracture extending therefrom. As this longitudinal fracture extends, the fracture encompasses the horizontal wellbore 20, resulting in a transverse fracture with respect to the horizontal wellbore 20. FIGS. 12-14 illustrate the progression of the fracture believed to occur at a location along a horizontal wellbore 20 having a tunnel 80. In FIG. 12, the pressurized fluid (represented by the plurality of arrows 90) is introduced into the horizontal wellbore 20. In FIG. 13, the longitudinal fracture 50 is formed extending from the tunnel 80. The initiated longitudinal fracture 50 extends and expands to encompass the horizontal wellbore 20, thereby resulting in a transverse fracture 70 extending into the subterranean zone 40, as shown in FIG. 14.
  • The one or more tunnels 80 may have any desired length L. However, as the length L of the tunnel 80 increases, influences from the horizontal wellbore 20 during fracturing are reduced, resulting in a greater likelihood that a transverse fracture with respect to the horizontal wellbore 20 will result. These influences include how the horizontal wellbore 20 affects the stress state of the subterranean zone 40 surrounding the tunnels 80 during fracturing. Moreover, for a tunnel 80 having a length L of three (3) times the diameter D or six (6) times the radius of the horizontal wellbore, the influences from the horizontal wellbore 20 are negligible. In fact, the influences from the horizontal wellbore 20 are also small with respect to tunnels 80 having lengths L smaller than three times the diameter D of the horizontal wellbore 20. For example, a horizontal wellbore 20 may have substantially inconsequential effects on a tunnel 80 having a length of three times the radius or more (e.g., three, three and a half, four, four and a half, five, and five and half times the radius of the horizontal wellbore). A tunnel 80 having a length less than three times the radius of the horizontal wellbore 20, such as two and a half, two, and even one and a half times the radius of the horizontal wellbore 20, may also form transverse fractures notwithstanding the larger, though non-detrimental, effects on the formation of the transverse fractures associated with these smaller lengths.
  • A further benefit of using one or more tunnels 80 is that the size of any isolated portion of the wellbore that may be used can be larger than conventionally isolated portions. In still other implementations, the pressurized fluid may be introduced into the horizontal wellbore 20 at or near the tunnel(s) 80 without isolating a portion of the horizontal wellbore 20. The manner of injecting the pressurized fluid into the horizontal wellbore 20 may be selected based on conditions associated with the wellbore 10, the subterranean zone 40, and/or any number of different considerations. For example, porosity of the subterranean zone 40, the stress condition of the subterranean zone 40, properties of the reservoir fluids, and/or any other considerations may affect the manner chosen for introducing the pressurized fluid into the horizontal wellbore 20.
  • As mentioned above, the tunnel 80 represents a vertical well, and, during fracturing of a vertical well, a longitudinal fracture more readily forms at a lower pressure. A longitudinal fracture extending from a vertical wellbore more readily occurs because of the stress state of the subterranean zone. Fractures propagate perpendicular to the minimum principal stress in the subterranean zone. Generally, the minimum principal stress is oriented horizontally. Thus, for a vertical wellbore, longitudinal fractures are more likely to form and form more readily at lower breakdown pressures. Thus, it is believed that by including the tunnel 80 along the horizontal wellbore 20, the tunnel 80 acts as a fracture initiation location for a longitudinal fracture with respect to the tunnel 80. The fracture propagates to the horizontal wellbore perpendicular to the minimum principal stress of the subterranean zone.
  • Further, it is believed that the initiated fracture intersects the horizontal wellbore 20 irrespective of the orientation thereof. That is, the horizontal wellbore 20 may be oriented horizontally or substantially horizontally, or may be slanted within the subterranean zone 40, and the fracture initiated at the tunnel 80 still extends to the horizontal wellbore 20 to form a transverse fracture relative thereto. For example, some horizontal wellbores may be slanted at one or more locations so as to follow a particular formation within a subterranean reservoir. A wellbore extending through a subterranean zone, such as subterranean zone 40, that is horizontal, substantially horizontal, or that is at least partially slanted is considered horizontal within the scope of this disclosure. Thus, the longitudinal fracture 50 formed from the tunnel 80 represents a transverse fracture with respect to the horizontal wellbore 20. Consequently, forming the tunnel 80 permits the formation of a transverse fracture along the horizontal wellbore 20 using fluid at a lower fluid pressure than would otherwise be required to form a transverse fracture along a horizontal wellbore. Use of the tunnel 80 also allows consistent formation of a transverse fracture 70 relative to the horizontal wellbore 20. Further, depending on the downhole conditions, the pressurized fluid may be introduced without the need for isolating one or more portions of the well. Therefore, use of the tunnel 80 has lower associated fracturing costs. Moreover, the tunnel 80 is also believed to essentially eliminate the formation of multiple fractures and fracture tortuosity that may result during a fracturing operation.
  • Experimentation, described below, has been performed demonstrating the effectiveness of a tunnel extending from a horizontal wellbore in forming a fracture transverse to the horizontal wellbore at a relatively low fracturing pressure. FIG. 15 shows test summary data for six test samples. Each of the test samples were performed by casting a bore and, in some of the experiments, a vertical or substantially vertical tunnel extending therefrom in hydrostone, a gypsum cement. The hydrostone was prepared having a ratio of 30 parts of water per 100 parts of hydrostone. FIGS. 16-22 show schematic diagrams of the configuration of the bores and, optionally, the tunnels within the hydrostone. Each of the test samples were subjected to a 3000 psi pressure on a top surface (as shown in the figures), which resulted in the following stress state: vertical stress=3000 psi, minimum horizontal stress=1800 psi, and maximum horizontal stress=2500 psi. It is noted that, although some of the tests described in FIGS. 15-22 include a wellbore slanted relative to horizontal (e.g., some wellbores have a slant of 5° relative to horizontal), the wellbores may have a slant of greater than or less than 5° and still be within the scope of the disclosure. For example, in some instances, the wellbore may have a slant of 15° or greater and a tunnel extending therefrom may still be operable to produce a transverse fracture at a relatively low fracture pressure.
  • FIG. 16 is an elevation view of a schematic of test sample 1. Test sample 1 was formed having a bore 100 having a casing 110. A tunnel 120 extends vertically or substantially vertically from the bore 100. (Dimensions of the bore 100 and tunnel 120 are provided in the table of FIG. 15.) The bore 100 was formed at approximately 5° from horizontal. An interior of the tunnel was in communication with an interior of the bore via an opening formed in the casing 110. As a result of the casing 110, fluid pressure introduced into the bore 100 was exerted on the hydrostone (formation 130) via the tunnel 120. As a result, a fracture initiated at a fluid pressure of 3323 psi transverse to the bore 100. The fracture is believed to have initiated from the tunnel 120 and extended to encompass the bore 100. The fracture extended transverse to the minimum horizontal stress.
  • FIGS. 17 and 18 are schematic plan and elevation views, respectively, of test sample 2. Test sample 2 included an uncased bore 100 formed at approximately 5° from horizontal. The bore 100 was also formed at approximately 45° within a horizontal plane, as shown in the plan view of FIG. 17. The bore 100 of test sample 2 was not cased but did include a tunnel 120 extending vertically or substantially vertically from the bore 100. A fracture transverse to the bore 100 was initiated in the test sample at 2889 psi. The fracture is believed to have initiated at the tunnel 120 and extended to encompass the bore 100. The resulting fracture extended past the bore 100 without causing multiple fractures.
  • FIG. 19 shows a schematic view of test sample 3. Test sample 3 included a bore 100 that was not cased and did not include a tunnel, and the bore 100 was formed at an angle of 5° from horizontal. A fracture extending longitudinally along the bore 100 was formed at a fluid pressure of 3903 psi introduced into the bore 100.
  • FIG. 20 shows a schematic elevation view of test sample 4. Test sample 4 included an uncased bore 100 formed at an angle of 5° from horizontal. A vertical or substantially vertical tunnel 120 extended from the bore 100. Fluid pressure was introduced into the interior of the bore 100 and the tunnel 120, which caused a fracture transverse to the bore 100 at a fluid pressure of 3596 psi. The fracture is believed to have initiated in the tunnel and propagated to encompass the bore 100.
  • FIG. 21 shows a schematic elevation view of test sample 5. Test sample 5 included an uncased bore 100 formed at an angle of 5° from horizontal. The bore 100 did not include a tunnel extending therefrom. The bore 100 was subjected to an internal fluid pressure which, at a fluid pressure of 3525 psi, caused a fracture extending longitudinally along the bore 100.
  • FIG. 22 shows a schematic elevation view of test sample 6, which includes a vertical or substantially vertical uncased bore 100. Fluid pressure was introduced into the bore 100, resulting in a fracture extending longitudinally along the bore 100 at a fluid pressure of 2726 psi. Test sample 6 illustrates the tendency to forming fractures extending longitudinally along a vertical bore under stress conditions similar to those in an earth formation.
  • In each of the experiments, the resulting fractures propagated perpendicular to the minimum stress state. Further, the results show that, for the bores including vertical or substantially vertical tunnels extending therefrom, a fracture transverse to the bore was formed at a fluid pressure approximately the same as or lower than pressures forming a fracture longitudinal to those bores that did not include a vertical or substantially vertical tunnel extending therefrom.
  • A number of implementations have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of the disclosure. Accordingly, other implementations are within the scope of the following claims.

Claims (26)

What is claimed is:
1. A method of forming transverse fractures extending from a horizontal wellbore comprising:
forming a wellbore within a subterranean zone, the wellbore having a horizontal wellbore portion;
forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden, the tunnel formed with a length adapted to initiate a fracturing extending from the tunnel along a longitudinal axis thereof being influenced insignificantly by the horizontal wellbore portion;
applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form a fracture extending from the tunnel along a longitudinal axis thereof; and
propagating the initiated fracture to encompass the horizontal wellbore portion.
2. The method of claim 1, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises:
inserting a tool in the horizontal wellbore portion; and
orienting the tool into a desired orientation to form the tunnel.
3. The method of claim 1, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises:
forming a first tunnel extending from a first portion of the horizontal wellbore portion; and
forming a second tunnel extending from a second portion of the horizontal wellbore portion opposite the first portion.
4. The method of claim 1, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with one of a hydrajet, a laser, or a drilling tool.
5. The method of claim 4, wherein forming the tunnel with a hydrajet comprises:
disposing a hydrajet into the horizontal wellbore portion at a desired location therein;
orienting the hydrajet to form the tunnel; and
operating the hydrajet to impinge a fluid flow onto a surface of the horizontal wellbore portion to form the tunnel.
6. The method of claim 4, wherein forming the tunnel with a laser comprises:
disposing a laser into the substantially horizontal wellbore portion;
orienting the laser to form the tunnel; and
operating the laser to form the tunnel.
7. The method of claim 4, wherein forming the tunnel with a drilling tool comprises:
disposing a drilling tool into the substantially horizontal wellbore portion;
orienting the drilling tool to form the tunnel; and
operating the drilling tool to form the tunnel.
8. The method of claim 1, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden at two or more different locations along an axial length of the horizontal wellbore portion.
9. The method of claim 1 further comprising isolating a portion of the horizontal wellbore at a location of the tunnel before applying the fluid pressure.
10. The method of claim 1, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least one and a half (1.5) times a radius of the horizontal wellbore portion.
11. The method of claim 1, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least three (3) times a radius of the horizontal wellbore portion.
12. The method of claim 1, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least six (6) times a radius of the horizontal wellbore portion.
13. A wellbore system comprising:
a horizontal wellbore extending through a subterranean zone; and
at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden, the at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore.
14. The wellbore system of claim 13, wherein at least a portion of the horizontal wellbore comprises a slanted portion and wherein the tunnel extends from the slanted portion of the horizontal wellbore.
15. The wellbore system of claim 13, wherein the at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden comprises:
a first substantially vertical tunnel extending from a first portion of the horizontal wellbore; and
a second substantially vertical tunnel extending from a second portion of the horizontal wellbore along a perimeter thereof opposite the first portion.
16. The wellbore system of claim 13, wherein the at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore comprises a tunnel having a length of at least one and a half (1.5) times a radius of the horizontal wellbore.
17. The wellbore system of claim 13, wherein the at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore comprises a tunnel having a length of at least three (3) times a radius of the horizontal wellbore.
18. The wellbore system of claim 13, wherein the at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore comprises a tunnel having a length of at least six (6) times a radius of the horizontal wellbore.
19. A method of forming fractures transverse to a horizontal wellbore comprising:
forming a wellbore having a horizontal wellbore portion within a subterranean zone;
forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden, the tunnel formed with a length such that the horizontal wellbore portion has insignificant effects on formation of a fracture extending from the tunnel along a longitudinal axis thereof;
applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form the fracture extending from the tunnel along the longitudinal axis thereof; and
propagating the initiated fracture to encompass the horizontal wellbore portion.
20. The method of claim 19, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least one and a half (1.5) times a radius of the horizontal wellbore portion.
21. The method of claim 19, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least three (3) times a radius of the horizontal wellbore portion.
22. The method of claim 19, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least six (6) times a radius of the horizontal wellbore portion.
23. The method of claim 19, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises:
inserting a tool in the horizontal wellbore portion; and
orienting the tool into a desired orientation to form the tunnel.
24. The method of claim 19, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with one of a hydrajet, a laser, or a drilling tool.
25. The method of claim 19, wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprising forming a tunnel at two or more different locations along an axial length of the horizontal wellbore portion.
26. The method of claim 19 further comprising isolating a portion of the horizontal wellbore portion at a location of the tunnel before applying the fluid pressure.
US12/558,747 2009-09-14 2009-09-14 Formation of Fractures Within Horizontal Well Abandoned US20110061869A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US12/558,747 US20110061869A1 (en) 2009-09-14 2009-09-14 Formation of Fractures Within Horizontal Well
PCT/US2010/048612 WO2011032083A1 (en) 2009-09-14 2010-09-13 Formation of fractures within horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/558,747 US20110061869A1 (en) 2009-09-14 2009-09-14 Formation of Fractures Within Horizontal Well

Publications (1)

Publication Number Publication Date
US20110061869A1 true US20110061869A1 (en) 2011-03-17

Family

ID=42985443

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/558,747 Abandoned US20110061869A1 (en) 2009-09-14 2009-09-14 Formation of Fractures Within Horizontal Well

Country Status (2)

Country Link
US (1) US20110061869A1 (en)
WO (1) WO2011032083A1 (en)

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110083849A1 (en) * 2006-12-08 2011-04-14 Oleg Medvedev Heterogeneous proppant placement in a fracture with removable channelant fill
US20110114313A1 (en) * 2006-12-08 2011-05-19 Timothy Lesko Heterogeneous proppant placement in a fracture with removable channelant fill
WO2013012772A1 (en) * 2011-07-15 2013-01-24 Schlumberger Canada Limited Heterogeneous proppant placement in a fracture with removable extrametrical material fill
US8424617B2 (en) 2008-08-20 2013-04-23 Foro Energy Inc. Methods and apparatus for delivering high power laser energy to a surface
US20130228372A1 (en) * 2008-08-20 2013-09-05 Foro Energy Inc. High power laser perforating and laser fracturing tools and methods of use
US8571368B2 (en) 2010-07-21 2013-10-29 Foro Energy, Inc. Optical fiber configurations for transmission of laser energy over great distances
US8627901B1 (en) 2009-10-01 2014-01-14 Foro Energy, Inc. Laser bottom hole assembly
US8662160B2 (en) 2008-08-20 2014-03-04 Foro Energy Inc. Systems and conveyance structures for high power long distance laser transmission
US9027668B2 (en) 2008-08-20 2015-05-12 Foro Energy, Inc. Control system for high power laser drilling workover and completion unit
US9074422B2 (en) 2011-02-24 2015-07-07 Foro Energy, Inc. Electric motor for laser-mechanical drilling
US9080425B2 (en) 2008-10-17 2015-07-14 Foro Energy, Inc. High power laser photo-conversion assemblies, apparatuses and methods of use
US9089928B2 (en) 2008-08-20 2015-07-28 Foro Energy, Inc. Laser systems and methods for the removal of structures
US9138786B2 (en) 2008-10-17 2015-09-22 Foro Energy, Inc. High power laser pipeline tool and methods of use
US9244235B2 (en) 2008-10-17 2016-01-26 Foro Energy, Inc. Systems and assemblies for transferring high power laser energy through a rotating junction
US9242309B2 (en) 2012-03-01 2016-01-26 Foro Energy Inc. Total internal reflection laser tools and methods
US9267330B2 (en) 2008-08-20 2016-02-23 Foro Energy, Inc. Long distance high power optical laser fiber break detection and continuity monitoring systems and methods
US9347271B2 (en) 2008-10-17 2016-05-24 Foro Energy, Inc. Optical fiber cable for transmission of high power laser energy over great distances
US9360643B2 (en) 2011-06-03 2016-06-07 Foro Energy, Inc. Rugged passively cooled high power laser fiber optic connectors and methods of use
US9360631B2 (en) 2008-08-20 2016-06-07 Foro Energy, Inc. Optics assembly for high power laser tools
US9562395B2 (en) 2008-08-20 2017-02-07 Foro Energy, Inc. High power laser-mechanical drilling bit and methods of use
US9664012B2 (en) 2008-08-20 2017-05-30 Foro Energy, Inc. High power laser decomissioning of multistring and damaged wells
US9669492B2 (en) 2008-08-20 2017-06-06 Foro Energy, Inc. High power laser offshore decommissioning tool, system and methods of use
WO2018049368A1 (en) * 2016-09-12 2018-03-15 Schlumberger Technology Corporation Wellbore landing methods for reservoir stimulation
US10221687B2 (en) 2015-11-26 2019-03-05 Merger Mines Corporation Method of mining using a laser
US10301912B2 (en) * 2008-08-20 2019-05-28 Foro Energy, Inc. High power laser flow assurance systems, tools and methods
WO2019168885A1 (en) * 2018-02-27 2019-09-06 Schlumberger Technology Corporation Producing disconnected propped fractures
US10815766B2 (en) 2015-02-27 2020-10-27 Schlumberger Technology Corporation Vertical drilling and fracturing methodology
US11193332B2 (en) 2018-09-13 2021-12-07 Schlumberger Technology Corporation Slider compensated flexible shaft drilling system
US11203901B2 (en) 2017-07-10 2021-12-21 Schlumberger Technology Corporation Radial drilling link transmission and flex shaft protective cover
US11448054B2 (en) 2020-05-19 2022-09-20 Saudi Arabian Oil Company Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery
US11466549B2 (en) * 2017-01-04 2022-10-11 Schlumberger Technology Corporation Reservoir stimulation comprising hydraulic fracturing through extended tunnels
US11486214B2 (en) 2017-07-10 2022-11-01 Schlumberger Technology Corporation Controlled release of hose
US11840909B2 (en) 2016-09-12 2023-12-12 Schlumberger Technology Corporation Attaining access to compromised fractured production regions at an oilfield
US11851989B2 (en) 2021-12-03 2023-12-26 Saudi Arabian Oil Company Cooling methodology to improve hydraulic fracturing efficiency and reduce breakdown pressure
US20240052735A1 (en) * 2022-08-10 2024-02-15 Saudi Arabian Oil Company Method of increasing hydrocarbon recovery from a wellbore penetrating a tight hydrocarbon formation by a hydro-jetting tool that jets a thermally controlled fluid

Citations (74)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3878884A (en) * 1973-04-02 1975-04-22 Cecil B Raleigh Formation fracturing method
US4262743A (en) * 1979-09-04 1981-04-21 Halliburton Company Diffuser for wellhead isolation tool
US4797821A (en) * 1987-04-02 1989-01-10 Halliburton Company Method of analyzing naturally fractured reservoirs
US4828028A (en) * 1987-02-09 1989-05-09 Halliburton Company Method for performing fracturing operations
US4836280A (en) * 1987-09-29 1989-06-06 Halliburton Company Method of evaluating subsurface fracturing operations
US5005643A (en) * 1990-05-11 1991-04-09 Halliburton Company Method of determining fracture parameters for heterogenous formations
US5018578A (en) * 1990-08-06 1991-05-28 Halliburton Company Method of arresting hydraulic fracture propagation
US5050674A (en) * 1990-05-07 1991-09-24 Halliburton Company Method for determining fracture closure pressure and fracture volume of a subsurface formation
US5111881A (en) * 1990-09-07 1992-05-12 Halliburton Company Method to control fracture orientation in underground formation
US5226445A (en) * 1992-05-05 1993-07-13 Halliburton Company Valve having convex sealing surface and concave seating surface
US5233863A (en) * 1992-03-30 1993-08-10 Halliburton Company Fluid loss measuring system and method
US5265462A (en) * 1992-05-13 1993-11-30 Halliburton Company Method and apparatus for determining permeability, diffusivity, porosity, and gas storage in gas-containing substrates
US5285683A (en) * 1992-10-01 1994-02-15 Halliburton Company Method and apparatus for determining orientation of a wellbore relative to formation stress fields
US5305211A (en) * 1990-09-20 1994-04-19 Halliburton Company Method for determining fluid-loss coefficient and spurt-loss
US5315864A (en) * 1993-04-06 1994-05-31 Halliburton Company Start/stop method to determine static gel strength
US5325723A (en) * 1992-12-04 1994-07-05 Halliburton Company Core sample test method and apparatus
US5325923A (en) * 1992-09-29 1994-07-05 Halliburton Company Well completions with expandable casing portions
US5360066A (en) * 1992-12-16 1994-11-01 Halliburton Company Method for controlling sand production of formations and for optimizing hydraulic fracturing through perforation orientation
US5361856A (en) * 1992-09-29 1994-11-08 Halliburton Company Well jetting apparatus and met of modifying a well therewith
US5396957A (en) * 1992-09-29 1995-03-14 Halliburton Company Well completions with expandable casing portions
US5396805A (en) * 1993-09-30 1995-03-14 Halliburton Company Force sensor and sensing method using crystal rods and light signals
US5431225A (en) * 1994-09-21 1995-07-11 Halliburton Company Sand control well completion methods for poorly consolidated formations
US5482122A (en) * 1994-12-09 1996-01-09 Halliburton Company Oriented-radial-cores retrieval for measurements of directional properties
US5499678A (en) * 1994-08-02 1996-03-19 Halliburton Company Coplanar angular jetting head for well perforating
US5765642A (en) * 1996-12-23 1998-06-16 Halliburton Energy Services, Inc. Subterranean formation fracturing methods
US5787983A (en) * 1997-01-03 1998-08-04 Halliburton Energy Services, Inc. Methods of delaying well destruction due to subsidence
US5868030A (en) * 1997-07-01 1999-02-09 Halliburton Energy Services, Inc. Core sample test method and apparatus
US5960880A (en) * 1996-08-27 1999-10-05 Halliburton Energy Services, Inc. Unconsolidated formation stimulation with sand filtration
US6283210B1 (en) * 1999-09-01 2001-09-04 Halliburton Energy Services, Inc. Proactive conformance for oil or gas wells
US6347283B1 (en) * 2000-07-10 2002-02-12 Halliburton Energy Services, Inc. Methods for combining well test analysis with wavelet analysis
US6619394B2 (en) * 2000-12-07 2003-09-16 Halliburton Energy Services, Inc. Method and apparatus for treating a wellbore with vibratory waves to remove particles therefrom
US6662874B2 (en) * 2001-09-28 2003-12-16 Halliburton Energy Services, Inc. System and method for fracturing a subterranean well formation for improving hydrocarbon production
US6719054B2 (en) * 2001-09-28 2004-04-13 Halliburton Energy Services, Inc. Method for acid stimulating a subterranean well formation for improving hydrocarbon production
US6719055B2 (en) * 2002-01-23 2004-04-13 Halliburton Energy Services, Inc. Method for drilling and completing boreholes with electro-rheological fluids
US6725933B2 (en) * 2001-09-28 2004-04-27 Halliburton Energy Services, Inc. Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production
US6795773B2 (en) * 2001-09-07 2004-09-21 Halliburton Energy Services, Inc. Well completion method, including integrated approach for fracture optimization
US6805199B2 (en) * 2002-10-17 2004-10-19 Halliburton Energy Services, Inc. Process and system for effective and accurate foam cement generation and placement
US6837523B2 (en) * 2002-12-05 2005-01-04 Halliburton Energy Services, Inc. Piping with integral force absorbing restraining system
US20050161081A1 (en) * 2004-01-22 2005-07-28 Halliburton Energy Services System and method for treating a fluid in a pipe
US6938690B2 (en) * 2001-09-28 2005-09-06 Halliburton Energy Services, Inc. Downhole tool and method for fracturing a subterranean well formation
US6978211B2 (en) * 2003-12-08 2005-12-20 Halliburton Energy Services, Inc. Methods and systems for using wavelet analysis in subterranean applications
US20060102343A1 (en) * 2004-11-12 2006-05-18 Skinner Neal G Drilling, perforating and formation analysis
US7066265B2 (en) * 2003-09-24 2006-06-27 Halliburton Energy Services, Inc. System and method of production enhancement and completion of a well
US20060155473A1 (en) * 2005-01-08 2006-07-13 Halliburton Energy Services, Inc. Method and system for determining formation properties based on fracture treatment
US7090153B2 (en) * 2004-07-29 2006-08-15 Halliburton Energy Services, Inc. Flow conditioning system and method for fluid jetting tools
US7100688B2 (en) * 2002-09-20 2006-09-05 Halliburton Energy Services, Inc. Fracture monitoring using pressure-frequency analysis
US20060201674A1 (en) * 2005-03-10 2006-09-14 Halliburton Energy Services, Inc. Methods of treating subterranean formations using low-temperature fluids
US7150327B2 (en) * 2004-04-07 2006-12-19 Halliburton Energy Services, Inc. Workover unit and method of utilizing same
US7225869B2 (en) * 2004-03-24 2007-06-05 Halliburton Energy Services, Inc. Methods of isolating hydrajet stimulated zones
US7234529B2 (en) * 2004-04-07 2007-06-26 Halliburton Energy Services, Inc. Flow switchable check valve and method
US7237612B2 (en) * 2004-11-17 2007-07-03 Halliburton Energy Services, Inc. Methods of initiating a fracture tip screenout
US7243723B2 (en) * 2004-06-18 2007-07-17 Halliburton Energy Services, Inc. System and method for fracturing and gravel packing a borehole
US7273313B2 (en) * 2004-06-17 2007-09-25 Halliburton Energy Services, Inc. Mixing device for mixing bulk and liquid material
US7287592B2 (en) * 2004-06-11 2007-10-30 Halliburton Energy Services, Inc. Limited entry multiple fracture and frac-pack placement in liner completions using liner fracturing tool
US20070272407A1 (en) * 2006-05-25 2007-11-29 Halliburton Energy Services, Inc. Method and system for development of naturally fractured formations
US7337844B2 (en) * 2006-05-09 2008-03-04 Halliburton Energy Services, Inc. Perforating and fracturing
US7343975B2 (en) * 2005-09-06 2008-03-18 Halliburton Energy Services, Inc. Method for stimulating a well
US20080083538A1 (en) * 2006-10-06 2008-04-10 Halliburton Energy Services, Inc. Methods and systems for well stimulation using multiple angled fracturing
US7370701B2 (en) * 2004-06-30 2008-05-13 Halliburton Energy Services, Inc. Wellbore completion design to naturally separate water and solids from oil and gas
US7398825B2 (en) * 2004-12-03 2008-07-15 Halliburton Energy Services, Inc. Methods of controlling sand and water production in subterranean zones
US7429332B2 (en) * 2004-06-30 2008-09-30 Halliburton Energy Services, Inc. Separating constituents of a fluid mixture
US7431090B2 (en) * 2005-06-22 2008-10-07 Halliburton Energy Services, Inc. Methods and apparatus for multiple fracturing of subterranean formations
US7445045B2 (en) * 2003-12-04 2008-11-04 Halliburton Energy Services, Inc. Method of optimizing production of gas from vertical wells in coal seams
US7503404B2 (en) * 2004-04-14 2009-03-17 Halliburton Energy Services, Inc, Methods of well stimulation during drilling operations
US7506689B2 (en) * 2005-02-22 2009-03-24 Halliburton Energy Services, Inc. Fracturing fluids comprising degradable diverting agents and methods of use in subterranean formations
US20090084189A1 (en) * 2007-09-28 2009-04-02 Halliburton Energy Services, Inc. Measuring mechanical properties
US7520327B2 (en) * 2006-07-20 2009-04-21 Halliburton Energy Services, Inc. Methods and materials for subterranean fluid forming barriers in materials surrounding wells
US7530396B1 (en) * 2008-01-24 2009-05-12 Halliburton Energy Services, Inc. Self repairing cement compositions and methods of using same
US20090125280A1 (en) * 2007-11-13 2009-05-14 Halliburton Energy Services, Inc. Methods for geomechanical fracture modeling
US7543635B2 (en) * 2004-11-12 2009-06-09 Halliburton Energy Services, Inc. Fracture characterization using reservoir monitoring devices
US7549320B2 (en) * 2007-01-11 2009-06-23 Halliburton Energy Services, Inc. Measuring cement properties
US7571766B2 (en) * 2006-09-29 2009-08-11 Halliburton Energy Services, Inc. Methods of fracturing a subterranean formation using a jetting tool and a viscoelastic surfactant fluid to minimize formation damage
US7580796B2 (en) * 2007-07-31 2009-08-25 Halliburton Energy Services, Inc. Methods and systems for evaluating and treating previously-fractured subterranean formations
US20100326659A1 (en) * 2009-06-29 2010-12-30 Schultz Roger L Wellbore laser operations

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5875843A (en) * 1995-07-14 1999-03-02 Hill; Gilman A. Method for vertically extending a well
US7228908B2 (en) * 2004-12-02 2007-06-12 Halliburton Energy Services, Inc. Hydrocarbon sweep into horizontal transverse fractured wells
US7735556B2 (en) * 2007-05-02 2010-06-15 Bj Services Company Method of isolating open perforations in horizontal wellbores using an ultra lightweight proppant

Patent Citations (80)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3878884A (en) * 1973-04-02 1975-04-22 Cecil B Raleigh Formation fracturing method
US4262743A (en) * 1979-09-04 1981-04-21 Halliburton Company Diffuser for wellhead isolation tool
US4828028A (en) * 1987-02-09 1989-05-09 Halliburton Company Method for performing fracturing operations
US4797821A (en) * 1987-04-02 1989-01-10 Halliburton Company Method of analyzing naturally fractured reservoirs
US4836280A (en) * 1987-09-29 1989-06-06 Halliburton Company Method of evaluating subsurface fracturing operations
US5050674A (en) * 1990-05-07 1991-09-24 Halliburton Company Method for determining fracture closure pressure and fracture volume of a subsurface formation
US5005643A (en) * 1990-05-11 1991-04-09 Halliburton Company Method of determining fracture parameters for heterogenous formations
US5018578A (en) * 1990-08-06 1991-05-28 Halliburton Company Method of arresting hydraulic fracture propagation
US5111881A (en) * 1990-09-07 1992-05-12 Halliburton Company Method to control fracture orientation in underground formation
US5305211A (en) * 1990-09-20 1994-04-19 Halliburton Company Method for determining fluid-loss coefficient and spurt-loss
US5233863A (en) * 1992-03-30 1993-08-10 Halliburton Company Fluid loss measuring system and method
US5226445A (en) * 1992-05-05 1993-07-13 Halliburton Company Valve having convex sealing surface and concave seating surface
US5265462A (en) * 1992-05-13 1993-11-30 Halliburton Company Method and apparatus for determining permeability, diffusivity, porosity, and gas storage in gas-containing substrates
US5494103A (en) * 1992-09-29 1996-02-27 Halliburton Company Well jetting apparatus
US5325923A (en) * 1992-09-29 1994-07-05 Halliburton Company Well completions with expandable casing portions
US5361856A (en) * 1992-09-29 1994-11-08 Halliburton Company Well jetting apparatus and met of modifying a well therewith
US5396957A (en) * 1992-09-29 1995-03-14 Halliburton Company Well completions with expandable casing portions
US5285683A (en) * 1992-10-01 1994-02-15 Halliburton Company Method and apparatus for determining orientation of a wellbore relative to formation stress fields
US5325723A (en) * 1992-12-04 1994-07-05 Halliburton Company Core sample test method and apparatus
US5360066A (en) * 1992-12-16 1994-11-01 Halliburton Company Method for controlling sand production of formations and for optimizing hydraulic fracturing through perforation orientation
US5315864A (en) * 1993-04-06 1994-05-31 Halliburton Company Start/stop method to determine static gel strength
US5396805A (en) * 1993-09-30 1995-03-14 Halliburton Company Force sensor and sensing method using crystal rods and light signals
US5499678A (en) * 1994-08-02 1996-03-19 Halliburton Company Coplanar angular jetting head for well perforating
US5431225A (en) * 1994-09-21 1995-07-11 Halliburton Company Sand control well completion methods for poorly consolidated formations
US5547023A (en) * 1994-09-21 1996-08-20 Halliburton Company Sand control well completion methods for poorly consolidated formations
US5482122A (en) * 1994-12-09 1996-01-09 Halliburton Company Oriented-radial-cores retrieval for measurements of directional properties
US5960880A (en) * 1996-08-27 1999-10-05 Halliburton Energy Services, Inc. Unconsolidated formation stimulation with sand filtration
US5765642A (en) * 1996-12-23 1998-06-16 Halliburton Energy Services, Inc. Subterranean formation fracturing methods
US5787983A (en) * 1997-01-03 1998-08-04 Halliburton Energy Services, Inc. Methods of delaying well destruction due to subsidence
US5868030A (en) * 1997-07-01 1999-02-09 Halliburton Energy Services, Inc. Core sample test method and apparatus
US6283210B1 (en) * 1999-09-01 2001-09-04 Halliburton Energy Services, Inc. Proactive conformance for oil or gas wells
US6347283B1 (en) * 2000-07-10 2002-02-12 Halliburton Energy Services, Inc. Methods for combining well test analysis with wavelet analysis
US6619394B2 (en) * 2000-12-07 2003-09-16 Halliburton Energy Services, Inc. Method and apparatus for treating a wellbore with vibratory waves to remove particles therefrom
US6795773B2 (en) * 2001-09-07 2004-09-21 Halliburton Energy Services, Inc. Well completion method, including integrated approach for fracture optimization
US6662874B2 (en) * 2001-09-28 2003-12-16 Halliburton Energy Services, Inc. System and method for fracturing a subterranean well formation for improving hydrocarbon production
US6719054B2 (en) * 2001-09-28 2004-04-13 Halliburton Energy Services, Inc. Method for acid stimulating a subterranean well formation for improving hydrocarbon production
US6725933B2 (en) * 2001-09-28 2004-04-27 Halliburton Energy Services, Inc. Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production
US6779607B2 (en) * 2001-09-28 2004-08-24 Halliburton Energy Services, Inc. Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production
US6938690B2 (en) * 2001-09-28 2005-09-06 Halliburton Energy Services, Inc. Downhole tool and method for fracturing a subterranean well formation
US6719055B2 (en) * 2002-01-23 2004-04-13 Halliburton Energy Services, Inc. Method for drilling and completing boreholes with electro-rheological fluids
US6959773B2 (en) * 2002-01-23 2005-11-01 Halliburton Energy Services, Inc. Method for drilling and completing boreholes with electro-rheological fluids
US7100688B2 (en) * 2002-09-20 2006-09-05 Halliburton Energy Services, Inc. Fracture monitoring using pressure-frequency analysis
US6805199B2 (en) * 2002-10-17 2004-10-19 Halliburton Energy Services, Inc. Process and system for effective and accurate foam cement generation and placement
US6837523B2 (en) * 2002-12-05 2005-01-04 Halliburton Energy Services, Inc. Piping with integral force absorbing restraining system
US7066265B2 (en) * 2003-09-24 2006-06-27 Halliburton Energy Services, Inc. System and method of production enhancement and completion of a well
US7445045B2 (en) * 2003-12-04 2008-11-04 Halliburton Energy Services, Inc. Method of optimizing production of gas from vertical wells in coal seams
US6978211B2 (en) * 2003-12-08 2005-12-20 Halliburton Energy Services, Inc. Methods and systems for using wavelet analysis in subterranean applications
US20050161081A1 (en) * 2004-01-22 2005-07-28 Halliburton Energy Services System and method for treating a fluid in a pipe
US20080110622A1 (en) * 2004-03-24 2008-05-15 Willett Ronald M Methods of Isolating Hydrajet Stimulated Zones
US7225869B2 (en) * 2004-03-24 2007-06-05 Halliburton Energy Services, Inc. Methods of isolating hydrajet stimulated zones
US7150327B2 (en) * 2004-04-07 2006-12-19 Halliburton Energy Services, Inc. Workover unit and method of utilizing same
US7234529B2 (en) * 2004-04-07 2007-06-26 Halliburton Energy Services, Inc. Flow switchable check valve and method
US7503404B2 (en) * 2004-04-14 2009-03-17 Halliburton Energy Services, Inc, Methods of well stimulation during drilling operations
US7287592B2 (en) * 2004-06-11 2007-10-30 Halliburton Energy Services, Inc. Limited entry multiple fracture and frac-pack placement in liner completions using liner fracturing tool
US7273313B2 (en) * 2004-06-17 2007-09-25 Halliburton Energy Services, Inc. Mixing device for mixing bulk and liquid material
US7243723B2 (en) * 2004-06-18 2007-07-17 Halliburton Energy Services, Inc. System and method for fracturing and gravel packing a borehole
US7370701B2 (en) * 2004-06-30 2008-05-13 Halliburton Energy Services, Inc. Wellbore completion design to naturally separate water and solids from oil and gas
US7429332B2 (en) * 2004-06-30 2008-09-30 Halliburton Energy Services, Inc. Separating constituents of a fluid mixture
US7090153B2 (en) * 2004-07-29 2006-08-15 Halliburton Energy Services, Inc. Flow conditioning system and method for fluid jetting tools
US7543635B2 (en) * 2004-11-12 2009-06-09 Halliburton Energy Services, Inc. Fracture characterization using reservoir monitoring devices
US20060102343A1 (en) * 2004-11-12 2006-05-18 Skinner Neal G Drilling, perforating and formation analysis
US7237612B2 (en) * 2004-11-17 2007-07-03 Halliburton Energy Services, Inc. Methods of initiating a fracture tip screenout
US7398825B2 (en) * 2004-12-03 2008-07-15 Halliburton Energy Services, Inc. Methods of controlling sand and water production in subterranean zones
US20060155473A1 (en) * 2005-01-08 2006-07-13 Halliburton Energy Services, Inc. Method and system for determining formation properties based on fracture treatment
US7506689B2 (en) * 2005-02-22 2009-03-24 Halliburton Energy Services, Inc. Fracturing fluids comprising degradable diverting agents and methods of use in subterranean formations
US20060201674A1 (en) * 2005-03-10 2006-09-14 Halliburton Energy Services, Inc. Methods of treating subterranean formations using low-temperature fluids
US7431090B2 (en) * 2005-06-22 2008-10-07 Halliburton Energy Services, Inc. Methods and apparatus for multiple fracturing of subterranean formations
US7343975B2 (en) * 2005-09-06 2008-03-18 Halliburton Energy Services, Inc. Method for stimulating a well
US7337844B2 (en) * 2006-05-09 2008-03-04 Halliburton Energy Services, Inc. Perforating and fracturing
US20070272407A1 (en) * 2006-05-25 2007-11-29 Halliburton Energy Services, Inc. Method and system for development of naturally fractured formations
US7520327B2 (en) * 2006-07-20 2009-04-21 Halliburton Energy Services, Inc. Methods and materials for subterranean fluid forming barriers in materials surrounding wells
US7571766B2 (en) * 2006-09-29 2009-08-11 Halliburton Energy Services, Inc. Methods of fracturing a subterranean formation using a jetting tool and a viscoelastic surfactant fluid to minimize formation damage
US20080083538A1 (en) * 2006-10-06 2008-04-10 Halliburton Energy Services, Inc. Methods and systems for well stimulation using multiple angled fracturing
US7549320B2 (en) * 2007-01-11 2009-06-23 Halliburton Energy Services, Inc. Measuring cement properties
US7580796B2 (en) * 2007-07-31 2009-08-25 Halliburton Energy Services, Inc. Methods and systems for evaluating and treating previously-fractured subterranean formations
US7552648B2 (en) * 2007-09-28 2009-06-30 Halliburton Energy Services, Inc. Measuring mechanical properties
US20090084189A1 (en) * 2007-09-28 2009-04-02 Halliburton Energy Services, Inc. Measuring mechanical properties
US20090125280A1 (en) * 2007-11-13 2009-05-14 Halliburton Energy Services, Inc. Methods for geomechanical fracture modeling
US7530396B1 (en) * 2008-01-24 2009-05-12 Halliburton Energy Services, Inc. Self repairing cement compositions and methods of using same
US20100326659A1 (en) * 2009-06-29 2010-12-30 Schultz Roger L Wellbore laser operations

Cited By (60)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8757259B2 (en) 2006-12-08 2014-06-24 Schlumberger Technology Corporation Heterogeneous proppant placement in a fracture with removable channelant fill
US20110114313A1 (en) * 2006-12-08 2011-05-19 Timothy Lesko Heterogeneous proppant placement in a fracture with removable channelant fill
US10030495B2 (en) 2006-12-08 2018-07-24 Schlumberger Technology Corporation Heterogeneous proppant placement in a fracture with removable extrametrical material fill
US9670764B2 (en) 2006-12-08 2017-06-06 Schlumberger Technology Corporation Heterogeneous proppant placement in a fracture with removable channelant fill
US20110083849A1 (en) * 2006-12-08 2011-04-14 Oleg Medvedev Heterogeneous proppant placement in a fracture with removable channelant fill
US9085727B2 (en) 2006-12-08 2015-07-21 Schlumberger Technology Corporation Heterogeneous proppant placement in a fracture with removable extrametrical material fill
US8763699B2 (en) 2006-12-08 2014-07-01 Schlumberger Technology Corporation Heterogeneous proppant placement in a fracture with removable channelant fill
US9284783B1 (en) 2008-08-20 2016-03-15 Foro Energy, Inc. High power laser energy distribution patterns, apparatus and methods for creating wells
US9562395B2 (en) 2008-08-20 2017-02-07 Foro Energy, Inc. High power laser-mechanical drilling bit and methods of use
US8662160B2 (en) 2008-08-20 2014-03-04 Foro Energy Inc. Systems and conveyance structures for high power long distance laser transmission
US8701794B2 (en) 2008-08-20 2014-04-22 Foro Energy, Inc. High power laser perforating tools and systems
US11060378B2 (en) * 2008-08-20 2021-07-13 Foro Energy, Inc. High power laser flow assurance systems, tools and methods
US8757292B2 (en) 2008-08-20 2014-06-24 Foro Energy, Inc. Methods for enhancing the efficiency of creating a borehole using high power laser systems
US10301912B2 (en) * 2008-08-20 2019-05-28 Foro Energy, Inc. High power laser flow assurance systems, tools and methods
US10036232B2 (en) 2008-08-20 2018-07-31 Foro Energy Systems and conveyance structures for high power long distance laser transmission
US8820434B2 (en) 2008-08-20 2014-09-02 Foro Energy, Inc. Apparatus for advancing a wellbore using high power laser energy
US8826973B2 (en) 2008-08-20 2014-09-09 Foro Energy, Inc. Method and system for advancement of a borehole using a high power laser
US8869914B2 (en) 2008-08-20 2014-10-28 Foro Energy, Inc. High power laser workover and completion tools and systems
US9719302B2 (en) * 2008-08-20 2017-08-01 Foro Energy, Inc. High power laser perforating and laser fracturing tools and methods of use
US8936108B2 (en) 2008-08-20 2015-01-20 Foro Energy, Inc. High power laser downhole cutting tools and systems
US8997894B2 (en) 2008-08-20 2015-04-07 Foro Energy, Inc. Method and apparatus for delivering high power laser energy over long distances
US9027668B2 (en) 2008-08-20 2015-05-12 Foro Energy, Inc. Control system for high power laser drilling workover and completion unit
US9669492B2 (en) 2008-08-20 2017-06-06 Foro Energy, Inc. High power laser offshore decommissioning tool, system and methods of use
US8424617B2 (en) 2008-08-20 2013-04-23 Foro Energy Inc. Methods and apparatus for delivering high power laser energy to a surface
US20130228372A1 (en) * 2008-08-20 2013-09-05 Foro Energy Inc. High power laser perforating and laser fracturing tools and methods of use
US9089928B2 (en) 2008-08-20 2015-07-28 Foro Energy, Inc. Laser systems and methods for the removal of structures
US9664012B2 (en) 2008-08-20 2017-05-30 Foro Energy, Inc. High power laser decomissioning of multistring and damaged wells
US8636085B2 (en) 2008-08-20 2014-01-28 Foro Energy, Inc. Methods and apparatus for removal and control of material in laser drilling of a borehole
US9360631B2 (en) 2008-08-20 2016-06-07 Foro Energy, Inc. Optics assembly for high power laser tools
US9267330B2 (en) 2008-08-20 2016-02-23 Foro Energy, Inc. Long distance high power optical laser fiber break detection and continuity monitoring systems and methods
US8511401B2 (en) 2008-08-20 2013-08-20 Foro Energy, Inc. Method and apparatus for delivering high power laser energy over long distances
US9347271B2 (en) 2008-10-17 2016-05-24 Foro Energy, Inc. Optical fiber cable for transmission of high power laser energy over great distances
US9244235B2 (en) 2008-10-17 2016-01-26 Foro Energy, Inc. Systems and assemblies for transferring high power laser energy through a rotating junction
US9138786B2 (en) 2008-10-17 2015-09-22 Foro Energy, Inc. High power laser pipeline tool and methods of use
US9080425B2 (en) 2008-10-17 2015-07-14 Foro Energy, Inc. High power laser photo-conversion assemblies, apparatuses and methods of use
US9327810B2 (en) 2008-10-17 2016-05-03 Foro Energy, Inc. High power laser ROV systems and methods for treating subsea structures
US8627901B1 (en) 2009-10-01 2014-01-14 Foro Energy, Inc. Laser bottom hole assembly
US8879876B2 (en) 2010-07-21 2014-11-04 Foro Energy, Inc. Optical fiber configurations for transmission of laser energy over great distances
US8571368B2 (en) 2010-07-21 2013-10-29 Foro Energy, Inc. Optical fiber configurations for transmission of laser energy over great distances
US9074422B2 (en) 2011-02-24 2015-07-07 Foro Energy, Inc. Electric motor for laser-mechanical drilling
US9784037B2 (en) 2011-02-24 2017-10-10 Daryl L. Grubb Electric motor for laser-mechanical drilling
US9360643B2 (en) 2011-06-03 2016-06-07 Foro Energy, Inc. Rugged passively cooled high power laser fiber optic connectors and methods of use
WO2013012772A1 (en) * 2011-07-15 2013-01-24 Schlumberger Canada Limited Heterogeneous proppant placement in a fracture with removable extrametrical material fill
CN103781991A (en) * 2011-07-15 2014-05-07 普拉德研究及开发股份有限公司 Heterogeneous proppant placement in a fracture with removable extrametrical material fill
US9242309B2 (en) 2012-03-01 2016-01-26 Foro Energy Inc. Total internal reflection laser tools and methods
US10815766B2 (en) 2015-02-27 2020-10-27 Schlumberger Technology Corporation Vertical drilling and fracturing methodology
US10221687B2 (en) 2015-11-26 2019-03-05 Merger Mines Corporation Method of mining using a laser
EP3510246A4 (en) * 2016-09-12 2020-03-25 Services Pétroliers Schlumberger Wellbore landing methods for reservoir stimulation
WO2018049368A1 (en) * 2016-09-12 2018-03-15 Schlumberger Technology Corporation Wellbore landing methods for reservoir stimulation
US11840909B2 (en) 2016-09-12 2023-12-12 Schlumberger Technology Corporation Attaining access to compromised fractured production regions at an oilfield
US11466549B2 (en) * 2017-01-04 2022-10-11 Schlumberger Technology Corporation Reservoir stimulation comprising hydraulic fracturing through extended tunnels
US11486214B2 (en) 2017-07-10 2022-11-01 Schlumberger Technology Corporation Controlled release of hose
US11203901B2 (en) 2017-07-10 2021-12-21 Schlumberger Technology Corporation Radial drilling link transmission and flex shaft protective cover
WO2019168885A1 (en) * 2018-02-27 2019-09-06 Schlumberger Technology Corporation Producing disconnected propped fractures
US11193332B2 (en) 2018-09-13 2021-12-07 Schlumberger Technology Corporation Slider compensated flexible shaft drilling system
US11643914B2 (en) 2020-05-19 2023-05-09 Saudi Arabian Oil Company Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery
US11448054B2 (en) 2020-05-19 2022-09-20 Saudi Arabian Oil Company Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery
US11846166B2 (en) 2020-05-19 2023-12-19 Saudi Arabian Oil Company Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery
US11851989B2 (en) 2021-12-03 2023-12-26 Saudi Arabian Oil Company Cooling methodology to improve hydraulic fracturing efficiency and reduce breakdown pressure
US20240052735A1 (en) * 2022-08-10 2024-02-15 Saudi Arabian Oil Company Method of increasing hydrocarbon recovery from a wellbore penetrating a tight hydrocarbon formation by a hydro-jetting tool that jets a thermally controlled fluid

Also Published As

Publication number Publication date
WO2011032083A1 (en) 2011-03-17

Similar Documents

Publication Publication Date Title
US20110061869A1 (en) Formation of Fractures Within Horizontal Well
CA2611928C (en) Methods and apparatus for multiple fracturing of subterranean formations
US5765642A (en) Subterranean formation fracturing methods
US4951751A (en) Diverting technique to stage fracturing treatments in horizontal wellbores
RU2375561C2 (en) Method of well completion in underground formation (versions)
US7287592B2 (en) Limited entry multiple fracture and frac-pack placement in liner completions using liner fracturing tool
US20050263284A1 (en) Hydrajet perforation and fracturing tool
US6446727B1 (en) Process for hydraulically fracturing oil and gas wells
US20090178801A1 (en) Methods for injecting a consolidation fluid into a wellbore at a subterranian location
CA2650632A1 (en) Perforating and fracturing
CA2802674C (en) Fracturing method to reduce tortuosity
BR112014002812B1 (en) METHOD FOR FRACTURING MULTIPLE ZONES WITHIN A WELL HOLE FORMED IN AN UNDERGROUND FORMATION
US11643914B2 (en) Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery
RU2591999C1 (en) Orientation method of hydraulic fracturing cracks in underground formation, developed by horizontal shafts
US20080210427A1 (en) Methods Using Fluid Stream for Selective Stimulation of Reservoir Layers
US20210131242A1 (en) Reservoir stimulation comprising hydraulic fracturing through extnded tunnels
US6135205A (en) Apparatus for and method of hydraulic fracturing utilizing controlled azumith perforating
RU2176021C2 (en) Method of forming directed vertical or horizontal fracture in formation fracturing
RU187392U1 (en) The arrangement of underground equipment for hydraulic fracturing
RU2178071C1 (en) Method of formation hydraulic fracturing from cased well and device for method embodiment
US20240052735A1 (en) Method of increasing hydrocarbon recovery from a wellbore penetrating a tight hydrocarbon formation by a hydro-jetting tool that jets a thermally controlled fluid
US10508527B2 (en) Method for creating multi-directional Bernoulli-induced fractures with vertical mini-holes in deviated wellbores
RU2177541C2 (en) Method of directional hydraulic fracturing of formation
US20160290112A1 (en) Processes for hydraulic fracturing
Carpenter New Stimulation Method Significantly Improves Hydrocarbon Recovery

Legal Events

Date Code Title Description
AS Assignment

Owner name: HALLIBURTON ENERGY SERVICES, INC., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SOLIMAN, MOHAMED Y.;MEADOWS, DAVID;REEL/FRAME:025112/0047

Effective date: 20100624

AS Assignment

Owner name: SAUDI ARABIAN OIL COMPANY, SAUDI ARABIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ABASS, HAZIM H.;TAHINI, ASHRAF M.;SIGNING DATES FROM 20100927 TO 20101013;REEL/FRAME:025159/0677

STCB Information on status: application discontinuation

Free format text: ABANDONED -- AFTER EXAMINER'S ANSWER OR BOARD OF APPEALS DECISION