US20070159746A1 - Centrally controlled protection systems having reduced energy let-through mode - Google Patents
Centrally controlled protection systems having reduced energy let-through mode Download PDFInfo
- Publication number
- US20070159746A1 US20070159746A1 US11/323,932 US32393205A US2007159746A1 US 20070159746 A1 US20070159746 A1 US 20070159746A1 US 32393205 A US32393205 A US 32393205A US 2007159746 A1 US2007159746 A1 US 2007159746A1
- Authority
- US
- United States
- Prior art keywords
- breakers
- protection system
- protection
- centrally controlled
- central computer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000004891 communication Methods 0.000 claims abstract description 26
- 230000006870 function Effects 0.000 claims description 24
- 238000000034 method Methods 0.000 claims description 13
- 230000001934 delay Effects 0.000 claims description 8
- 238000005315 distribution function Methods 0.000 claims description 7
- 230000004044 response Effects 0.000 description 19
- 238000012544 monitoring process Methods 0.000 description 8
- 230000008569 process Effects 0.000 description 6
- 230000005540 biological transmission Effects 0.000 description 5
- 230000001360 synchronised effect Effects 0.000 description 4
- 238000012545 processing Methods 0.000 description 3
- 238000005070 sampling Methods 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 230000002950 deficient Effects 0.000 description 2
- 230000007935 neutral effect Effects 0.000 description 2
- 101100172132 Mus musculus Eif3a gene Proteins 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000001427 coherent effect Effects 0.000 description 1
- 230000001143 conditioned effect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 230000004907 flux Effects 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003607 modifier Substances 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
- H02H7/261—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H9/00—Emergency protective circuit arrangements for limiting excess current or voltage without disconnection
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/006—Calibration or setting of parameters
Definitions
- This disclosure relates to centrally controlled protection systems. More particularly, this disclosure relates to centrally controlled protection systems having a reduced energy let-through mode.
- circuit protective devices e.g., circuit breakers
- Circuit breakers typically function automatically to prevent or minimize damage. In some prior systems, the circuit breakers minimize the extent and duration of electrical service interruption.
- a centrally controlled protection system includes a plurality of circuit breakers, a plurality of modules, and a central computer. Each of the plurality of breakers is in electrical communication with a respective one of the plurality of modules.
- the central computer is in communication with each of the plurality of modules via a network. The central computer controls the plurality of circuit breakers in either a normal mode or a reduced energy let-through mode.
- a centrally controlled protection system includes main breakers at a first level of a power distribution system, tie-breakers at a second level of the power distribution system, and feeder breakers at a third level of the power distribution system.
- the main, tie, and feeder breakers are divided into zones of protection.
- Each of the main, tie, and feeder breakers is in electrical communication with a respective module.
- the system also includes a central computer in communication with each of the modules via a network so that the central computer controls the main, tie, and feeder breakers.
- the central computer includes normal settings groups that based upon a state of the main, tie, and feeder breakers within each respective zone of protection.
- the central computer also includes a forced settings group.
- the forced settings group includes at least one parameter adjusted, with respect to parameters of the normal settings groups, to reduce energy let-though the respective zone of protection.
- a method of controlling a centrally controlled protection system includes using a central controller to control a plurality of circuit breakers in a first zone of protection by automatically selecting from a plurality of normal settings groups based on a state of the plurality of circuit breakers in the first zone of protection, and forcing the central computer to control the plurality of circuit breakers in the first zone of protection using a forced settings group, the forced settings group having at least one parameter for reducing energy let through the zone of protection as compared to the normal settings groups.
- FIG. 1 is a schematic illustration of a centrally controlled protection system
- FIG. 2 is a schematic illustration of a module of the protection system of FIG. 1 ;
- FIG. 3 is a schematic illustration of a response time for the protection system of FIG. 1 ;
- FIG. 4 illustrates an exemplary embodiment of a reduced energy let-through mode of the present disclosure
- FIG. 5 illustrates an exemplary embodiment of a settings group for the reduced energy let-through mode of FIG. 4 .
- Power distribution system 10 distributes power from at least one power bus 12 through a number or plurality of power switching devices or circuit breakers 14 to branch circuits 16 .
- Power bus 12 is illustrated by way of example as a three-phase power system having a first phase 18 , a second phase 20 , and a third phase 22 . Power bus 12 can also include a neutral phase (not shown). Power distribution system 10 is illustrated for purposes of clarity distributing power from power bus 12 to four circuits 16 by four feeder breakers 14 . Of course, it is contemplated by the present disclosure for power bus 12 to have any desired number of phases and/or for power distribution system 10 to have any desired number of circuit breakers 14 and any topology of circuit breakers, e.g., in series, or in parallel, or other combinations.
- Each circuit breaker 14 has a set of separable contacts 24 (illustrated schematically). Contacts 24 selectively place power bus 12 in communication with at least one load (also illustrated schematically) on circuit 16 .
- the load can include devices, such as, but not limited to, motors, welding machinery, computers, heaters, lighting, and/or other electrical equipment.
- Power distribution system 10 is illustrated in FIG. 1 with an exemplary embodiment of a centrally controlled and fully integrated protection, monitoring, and control system 26 (hereinafter “protection system”).
- protection system a centrally controlled and fully integrated protection, monitoring, and control system 26
- protection system 26 can include a reduced energy let-through mode, which reduces the amount of energy that is let through portions of the power distribution system 10 as needed.
- protection system 26 can be placed into the reduced energy let-through mode during activities such as maintenance or when an operator is in close proximity to various components in the power distribution system 10 .
- protection system 26 while in the reduced energy let-through mode, can set the time delay between a particular zone function and a backup function to zero.
- protection system 26 can trip all of the circuit breakers 14 that can potentially feed a fault within the initial delay.
- the reduced energy let-through mode allows the delay in the each zone function to be changed to 0.024 seconds so that all zone faults can be cleared in 6 cycles, while not compromising out of zone selectivity.
- the reduced energy let-through mode allows the current pickup values in the particular zone functions to be reduced to minimize the current of these zone functions. As such, protection system 26 , when in the reduced energy let-through mode, can reduce the energy let-through power distribution system 10 .
- the protection system is configured to control and monitor power distribution system 10 from a central control processing unit 28 (hereinafter “CCPU”).
- CCPU 28 communicates with a number or plurality of data sample and transmission modules 30 (hereinafter “module”) over a data network 32 .
- Network 32 communicates all of the information from all of the modules 30 substantially simultaneously to CCPU 28 .
- protection system 26 can include protection and control schemes that consider the value of electrical signals, such as current magnitude and phase, at one or all the circuit breakers 14 . Further, protection system 26 integrates the protection, control, and monitoring functions of the individual breakers 14 of power distribution system 10 in a single, centralized control processor (e.g., CCPU 28 ). Protection system 26 provides CCPU 28 with all of a synchronized set of information available through digital communication with modules 30 and circuit breakers 14 on network 32 and provides the CCPU with the ability to operate these devices based on this complete set of data.
- CCPU 28 centralized control processor
- CCPU 28 performs all primary power distribution functions for power distribution system 10 .
- CCPU 28 may performs some or all of instantaneous overcurrent protection (IOC), short time overcurrent, longtime overcurrent, relay protection, and logic control as well as digital signal processing functions of protection system 26 .
- IOC instantaneous overcurrent protection
- protection system 26 enables settings to be changed and data to be logged in a single, central location, i.e., CCPU 28 .
- CCPU 28 is described herein by way of example as a central processing unit.
- CCPU 28 may include any programmable circuit, such as, but not limited to, computers, processors, microcontrollers, microcomputers, programmable logic controllers, application specific integrated circuits, and other programmable circuits.
- each module 30 is in communication with one of the circuit breakers 14 .
- Each module 30 is also in communication with at least one sensor 34 sensing a condition or electrical parameter of the power in each phase (e.g., first phase 18 , second phase 20 , third phase 22 , and neutral) of bus 12 and/or circuit 16 .
- Sensors 34 can include current transformers (CTs), potential transformers (PTs), and any combination thereof.
- Sensors 34 monitor a condition or electrical parameter of the incoming power in circuits 16 and provide a first or parameter signal 36 representative of the condition of the power to module 30 .
- sensors 34 can be current transformers that generate a secondary current proportional to the current in circuit 16 so that first signals 36 are the secondary current.
- Module 30 sends and receives one or more second signals 38 to and/or from circuit breaker 14 .
- Second signals 38 can be representative of one or more conditions of breaker 14 , such as, but not limited to, a position or state of separable contacts 24 , a spring charge switch status, a lockout state or condition, and others.
- module 30 is configured to operate or actuate circuit breaker 14 by sending one or more third signals 40 to the breaker to open/close separable contacts 24 as desired, such as open/close commands or signals.
- circuit breakers 14 cannot open separable contacts 24 unless instructed to do so by protection system 26 .
- Protection system 26 utilizes data network 32 for data acquisition from modules 30 and data communication to the modules. Accordingly, network 32 is configured to provide a desired level of communication capacity and traffic management between CCPU 28 and modules 30 . In an exemplary embodiment, network 32 can be configured to not enable communication between modules 30 (i.e., no module-to-module communication).
- protection system 26 can be configured to provide a consistent fault response time.
- the fault response time of protection system 26 is defined as the time between when a fault condition occurs and the time module 30 issues an trip command to its associated breaker 14 .
- protection system 26 has a fault response time that is less than a single cycle of the 60 Hz (hertz) waveform.
- protection system 26 can have a maximum fault response time of about three milliseconds.
- network 32 can be an Ethernet network having a star topology as illustrated in FIG. 1 .
- network 32 is a full duplex network having the collision-detection multiple-access (CSMA/CD) protocols typically employed by Ethernet networks removed and/or disabled. Rather, network 32 is a switched Ethernet for preventing collisions.
- CSMA/CD collision-detection multiple-access
- network 32 provides a data transfer rate of at least about 100 Mbps (megabits per second).
- the data transfer rate can be about 1 Gbps (gigabits per second).
- communication between CCPU 28 and modules 30 across network 32 can be managed to optimize the use of network 32 .
- network 32 can be optimized by adjusting one or more of a message size, a message frequency, a message content, and/or a network speed.
- network 32 provides for a response time that includes scheduled communications, a fixed message length, full-duplex operating mode, and a switch to prevent collisions so that all messages are moved to memory in CCPU 28 before the next set of messages is scheduled to arrive.
- protection system 26 can perform the desired control, monitoring, and protection functions in a central location and manner.
- data network 32 is described above by way of example only as an Ethernet network having a particular configuration, topography, and data transmission protocols.
- the present disclosure contemplates the use of any data transmission network that ensures the desired data capacity and consistent fault response time necessary to perform the desired range of functionality.
- the exemplary embodiment achieves sub-cycle transmission times between CCPU 28 and modules 30 and full sample data to perform all power distribution functions for multiple modules with the accuracy and speed associated with traditional devices.
- CCPU 28 can perform branch circuit protection, zone protection, and relay protection interdependently because all of the system information is in one central location, namely at the CCPU. In addition, CCPU 28 can perform one or more monitoring functions on the centrally located system information. Accordingly, protection system 26 provides a coherent and integrated protection, control, and monitoring methodology not considered by prior systems. For example, protection system 26 integrates and coordinates load management, feed management, system monitoring, and other system protection functions in a low cost and easy to install system.
- Module 30 has a microprocessor 42 , a data bus 44 , a network interface 46 , a power supply 48 , and one or more memory devices 50 .
- Power supply 48 is configured to receive power from a first source 52 and/or a second source 54 .
- First source 52 can be one or more of an uninterruptible power supply (not shown), a plurality of batteries (not shown), a power bus (not shown), and other sources.
- second source 54 is the secondary current available from sensors 34 .
- Power supply 48 is configured to provide power 56 to module 30 from first and second sources 52 , 54 .
- power supply 48 can provide power 56 to microprocessor 42 , data bus 42 , network interface 44 , and memory devices 50 .
- Power supply 48 is also configured to provide a fourth signal 58 to microprocessor 42 .
- Fourth signal 58 is indicative of what sources are supplying power to power supply 48 .
- fourth signal 58 can indicate whether power supply 48 is receiving power from first source 52 , second source 54 , or both of the first and second sources.
- Network interface 46 and memory devices 50 communicate with microprocessor 42 over data bus 44 .
- Network interface 46 can be connected to network 32 so that microprocessor 42 is in communication with CCPU 28 .
- Microprocessor 42 receives digital representations of first signals 36 and second signals 38 .
- First signals 36 are continuous analog data collected by sensors 34
- second signals 38 are discrete analog data from breaker 14 .
- the data sent from modules 30 to CCPU 28 is a digital representation of the actual voltages, currents, and device status.
- first signals 36 can be analog signals indicative of the current and/or voltage in circuit 16 .
- protection system 26 provides the actual raw parametric or discrete electrical data (i.e., first signals 36 ) and device physical status (i.e., second signal 38 ) to CCPU 28 via network 32 , rather than processed summary information sampled, created, and stored by devices such as trip units, meters, or relays.
- CCPU 28 has complete, raw system-wide data with which to make decisions and can therefore operate any or all breakers 14 on network 32 based on information derived from as many modules 30 as the control and protection algorithms resident in CCPU 28 require.
- Module 30 has a signal conditioner 60 and an analog-digital converter 62 .
- First signals 36 are conditioned by signal conditioner 60 and converted to digital signals 64 by A/D converter 62 .
- module 30 collects first signals 36 and presents digital signals 64 , representative of the raw data in the first signals, to microprocessor 42 .
- signal conditioner 60 can include a filtering circuit (not shown) to improve a signal-to-noise ratio for first signal 36 , a gain circuit (not shown) to amplify the first signal, a level adjustment circuit (not shown) to shift the first signal to a pre-determined range, an impedance match circuit (not shown) to facilitate transfer of the first signal to A/D converter 62 , and any combination thereof.
- A/D converter 62 can be a sample-and-hold converter with external conversion start signal 66 from microprocessor 42 or a clock circuit 68 controlled by microprocessor 42 to facilitate synchronization of digital signals 64 .
- digital signals 64 from all of the modules 30 in protection system 26 are collected at substantially the same time. Specifically, it is desired for digital signals 64 from all of the modules 30 in protection system 26 to be representative of substantially the same time instance of the power in power distribution system 10 .
- Modules 30 sample digital signals 64 based, at least in part, upon a synchronization signal or instruction 70 as illustrated in FIG. 1 .
- Instruction 70 can be generated from a synchronizing clock 72 that is internal or external to CCPU 28 .
- Synchronization instruction 70 is simultaneously communicated from CCPU 28 to modules 30 over network 32 .
- Synchronizing clock 72 sends synchronization instructions 70 at regular intervals to CCPU 28 , which forwards the instructions to all modules 30 on network 32 .
- Modules 30 use synchronization instruction 70 to modify a resident sampling protocol.
- each module 30 can have a synchronization algorithm resident on microprocessor 42 .
- the synchronization algorithm resident on microprocessor 42 can be a software phase-lock-loop algorithm.
- the software phase-lock-loop algorithm adjusts the sample period of module 30 based, in part, on synchronization instructions 70 from CCPU 28 .
- CCPU 28 and modules 30 work together in protection system 26 to ensure that the sampling (i.e., digital signals 64 ) from all of the modules in the system is synchronized.
- protection system 26 is configured to collect digital signals 64 from modules 30 based in part on synchronization instruction 70 so that the digital signals are representative of the same time instance, such as being within a predetermined time-window from one another.
- CCPU 28 can have a set of accurate data representative of the state of each monitored location (e.g., modules 30 ) within the power distribution system 10 .
- the predetermined time-window can be less than about ten microseconds. For example, the predetermined time-window can be about five microseconds.
- the predetermined time-window of protection system 26 can be affected by the port-to port variability of network 32 .
- network 32 has a port-to-port variability of in a range of about 24 nanoseconds to about 720 nanoseconds. In an alternate exemplary embodiment, network 32 has a maximum port-to-port variability of about 2 microseconds.
- control of all of modules 30 to this predetermined time-window by protection system 26 enables a desired level of accuracy in the metering and vector functions across the modules, system waveform capture with coordinated data, accurate event logs, and other features.
- the desired level of accuracy is equal to the accuracy and speed of traditional devices.
- the predetermined time-window of about ten microseconds provides an accuracy of about 99% in metering and vector functions.
- Second signals 38 from each circuit breaker 14 to each module 30 are indicative of one or more conditions of the circuit breaker. Second signals 38 are provided to a discrete I/O circuit 74 of module 30 . Circuit 74 is in communication with circuit breaker 14 and microprocessor 42 . Circuit 74 is configured to ensure that second signals 38 from circuit breaker 14 are provided to microprocessor 42 at a desired voltage and without jitter. For example, circuit 74 can include de-bounce circuitry and a plurality of comparators.
- Microprocessor 42 samples first and second signals 36 , 38 as synchronized by CCPU 28 . Then, converter 62 converts the first and second signals 36 , 38 to digital signals 64 , which is packaged into a first message 76 having a desired configuration by microprocessor 42 .
- First message 76 can include an indicator that indicates which synchronization signal 70 the first message was in response to. Thus, the indicator of which synchronization signal 70 first message 76 is responding to is returned to CCPU 28 for sample time identification.
- CCPU 28 receives first message 76 from each of the modules 30 over network 32 and executes one or more protection and/or monitoring algorithms on the data sent in all of the first messages. Based on first message 76 from one or more modules 30 , CCPU 28 can control the operation of one or more circuit breakers 14 . For example, when CCPU 28 detects a fault from one or more of first messages 76 , the CCPU sends a second message 78 to one or more modules 30 via network 32 , such as open or close commands or signals, or circuit breaker actuation or de-actuation commands or signals.
- microprocessor 42 causes third signal 40 to operate or actuate (e.g., open contacts 24 ) circuit breaker 14 .
- Circuit breaker 14 can include more than one operation or actuation mechanism.
- circuit breaker 14 can have a shunt trip 80 and a magnetically held solenoid 82 .
- Microprocessor 42 is configured to send a first output 84 to operate shunt trip 80 and/or a second output 86 to operate solenoid 82 .
- First output 84 instructs a power control module 88 to provide third signal 40 (i.e., power) to shunt trip 80 , which can separate contacts 24 .
- Second output 86 instructs a gating circuit 90 to provide third signal 40 to solenoid 82 (i.e., flux shifter) to separate contacts 24 .
- solenoid 82 i.e., flux shifter
- shunt trip 80 requires first source 52 to be present, while solenoid 82 can be operated when only second source 54 is present.
- microprocessor 42 can operate circuit breaker 14 in response to a specified condition, such as, for example, a detected overcurrent, regardless of the state of first and second sources 52 , 54 .
- a lockout device can be provided that is operably connected to circuit breaker 14 .
- modules 30 are adapted to sample first signals 36 from sensors 34 as synchronized by the CCPU. Modules 30 then package the digital representations (i.e., digital signals 64 ) of first and second signals 36 , 38 , as well as other information, as required into first message 76 .
- First message 76 from all modules 30 are sent to CCPU 28 via network 32 .
- CCPU 28 processes first message 76 and generates and stores instructions to control the operation of each circuit breaker 14 in second message 78 .
- CCPU 28 sends second message 78 to all of the modules 30 .
- CCPU 28 sends second message 78 to all of the modules 30 in response to synchronization instruction 70 .
- protection system 26 can control each circuit breaker 14 based on the information from that breaker alone, or in combination with the information from one or more of the other breakers in the protection system 26 . Under normal operating conditions, protection system 26 performs all monitoring, protection, and control decisions at CCPU 28 .
- response time 96 for protection system 26 is illustrated with the system operating stably (e.g., not functioning in a start-up mode).
- Response time 96 is shown starting at T 0 and ending at T 1 .
- Response time 96 is the sum of a sample time 98 , a receive/validate time 100 , a process time 102 , a transmit time 104 , and a decode/execute time 106 .
- protection system 26 includes twenty-four modules 30 each connected to a different circuit breaker 14 .
- Each module 30 is scheduled by the phase-lock-loop algorithm and synchronization instruction 70 to sample its first signals 36 at a prescribed rate of 128 samples per cycle.
- Sample time 98 includes four sample intervals 108 of about 0.13 milliseconds (ms) each. Thus, sample time 98 is about 0.27 ms for data sampling and packaging into first message 76 .
- Receive/validate time 100 is preferably initiated at a fixed time delay after the receipt of synchronization instruction 70 .
- receive/validate time 100 is a fixed time that is, for example, the time required to receive all first messages 76 as determined from the latency of data network 32 .
- receive/validate time 100 can be about 0.25 ms where each first message 76 has a size of about 1000 bits, protection system 26 includes twenty-four modules 30 (i.e., 24,000 bits), and network 32 is operating at about 100 Mbps.
- CCPU 28 manages the communications and moving of first messages 76 to the CCPU during receive/validate time 100 .
- the protection processes starts at the end of the fixed receive/validate time 100 regardless of the receipt of first messages 76 . If any modules 30 are not sending first messages 76 , CCPU 28 flags this error and performs all functions that have valid data. Since protection system 26 is responsible for protection and control of multiple modules 30 , CCPU 28 is configured to not stop the entire system due to the loss of data (i.e., first message 76 ) from a single module 30 . In an exemplary embodiment, process time 102 is about 0.52 ms.
- Second message 78 can be twenty-four second messages (i.e., one per module 30 ) each having a size of about 64 bits per module. Alternately, it is contemplated by the present disclosure for second message 78 to be a single, multi-cast or broadcast message. In this embodiment, second message 78 includes instructions for each module 30 and has a size of about 1600 bits.
- Transmit time 104 is the time necessary to transmit second message 78 across network 32 .
- transmit time 104 is about 0.016 ms.
- second message 78 can include a portion of instruction 70 .
- CCPU 28 can be configured to send second message 78 upon receipt of the next synchronization instruction 70 from clock 72 .
- the interval between consecutive second messages 76 can be measured by module 30 and the synchronization information in the second message, if any, can be used by the synchronization algorithm resident on microprocessor 42 .
- each module decodes the message and executes its instructions (i.e., send third signals 40 ), if any, in decode/execute time 106 .
- decode/execute time 106 can be about 0.05 ms.
- response time 96 is about 1.11 ms.
- system response time 96 can be accelerated or decelerated based upon the needs of protection system 26 .
- system response time 96 can be adjusted by changing one or more of the sample period, the number of samples per transmission, the number of modules 30 , the message size, the message frequency, the message content, and/or the network speed.
- protection system 26 It is contemplated by the present disclosure for protection system 26 to have response time 96 of up to about 3 milliseconds. Thus, protection system 26 is configured to open any of its circuit breakers within about 3 milliseconds from the time sensors 34 sense conditions outside of the set parameters.
- protection system 26 can include both a normal mode 130 and reduced energy let-through mode 140 .
- These operational modes 130 , 140 of protection system 26 are described with reference to FIG. 4 , in which power distribution system 10 is illustrated having multiple tiers or levels. Specifically, power distribution system 10 includes main breakers 14 - a at a first level, tie-breakers 14 b at a second level, and feeder breakers 14 c at a third level. For purposes of clarity, certain components of power distribution and protection systems 10 , 26 have been omitted in FIG. 4 .
- Protection system 26 can be divided into a plurality of zones of protection 110 .
- protection system 26 is illustrated having three zones of protection 110 , namely a first zone 110 - 1 , a second zone 110 - 2 , and a third zone 110 - 3 .
- Each of the zones 110 includes one main breaker 14 a , two tie-breakers 14 b , and two feeder breakers 14 c , where each tie breaker 14 b is protected by multiple adjacent zones. Since each zone includes two tie-breakers 14 b , one on the left of the zone and one on the right, the tie- breaker 14 b on the left of each zone acts as a backup breaker to the zone 110 - 2 .
- protection system 26 may have any number of protection zones 110 .
- protection zones 110 in protection system 26 may have any number of breakers 14 a , 14 b , 14 c.
- each zone 110 of protection system 26 includes a unique settings group 112 for each of the possible topologies or states.
- Each settings group 112 includes two primary pickup currents 114 , 118 , two primary time delays 116 , 120 , and one back-up Delta T 122 .
- the backup function will trip the defined backup breakers in the event the fault current does not go to zero within the specified delta time 122 .
- the backup function does not require additional breakers to be in pickup or time delays other than the delta time 122 .
- the pickup currents 114 , 118 are in amperes, while the times 116 , 120 , and 122 are in seconds.
- protection system 26 In the normal mode 130 , protection system 26 automatically switches between normal settings groups 112 - 1 , 112 - 2 , 112 - 3 and 112 - 4 based upon the state of circuit breakers 14 in power distribution system 10 . Protection system 26 attempts to clear a fault condition in each zone 110 with the nearest breaker 14 upstream of the fault condition using the primary parameters 114 , 116 , 118 , 120 . For example, assuming a fault occurs on the bus of zone 110 - 2 or the feeder breaker compartment 14 c of the second zone 110 - 2 , protection system 26 detects the fault in zone 110 - 2 using either set of primary parameters 114 , 116 , 118 , 120 within the appropriate normal settings groups 112 - 1 through 112 - 4 . Protection system 26 temporarily, via delta time 122 , restrains operation of backup main breakers 14 a and/or tie-breaker 14 b to provide the primary main breakers 14 a and tie breakers 14 b sufficient time to clear the fault condition.
- protection system 26 can control the protection within each zone 110 , while maintaining power available in as much of power distribution system 10 as possible.
- any one zone 110 or, preferably, all zones 110 - 1 through 110 - 3 within protection system 26 can be forced to reduced energy mode 140 , which forces that zone to use a forced settings group 112 - 0 .
- an operator can manually force any zone 110 to reduced energy mode 140 via a human-machine interface 92 in communication with CCPU 28 as shown in FIG. 1 .
- zones 110 in protection system 26 can be forced to reduced energy mode 140 via an action of the operator such as, but not limited to, opening a panel that houses one or more breakers 14 in that zone.
- Forcing a zone 110 to forced settings group 112 - 0 blocks protection system 26 from automatically switching among normal settings groups 112 - 1 through 112 - 4 . Rather, protection system 26 controls that zone 110 with forced settings group 112 - 0 until the operator forces that zone back to normal settings groups 112 - 1 through 112 - 4 .
- protection system 26 automatically operates in normal mode 130 using normal settings groups 112 - 1 through 112 - 4 , but is forced by an operator to function in reduced energy let-through mode 140 using force settings group 112 - 0 .
- the parameters in forced settings group 112 - 0 are adjusted to reduce the energy let-though that particular zone 110 as compared the parameters in normal settings groups 112 - 1 through 112 - 4 .
- forced settings group 112 - 0 can have a lower value for first pickup current 114 , first time delay 116 , second pickup current 118 , second time delay 120 , time delta 122 , or any combinations thereof.
- the parameters in forced settings group 112 - 0 can also enable/disable any function and the backup function within protection system 26 .
- forced settings group 112 - 0 has been optimized to minimize the energy let through.
- forced settings group 112 - 0 includes parameters that have been reduced to lower values for maximum protection.
- forced settings group 112 - 0 has primary pickup currents 114 , 118 of about 600 amperes, primary time delays 116 , 120 of about 0.024 milliseconds, and time delta 122 of zero seconds. Setting the delta time 122 to zero allows protection system 26 to trip all of the circuit breakers 14 a , 14 b , 14 c that can potentially feed the fault condition after only clearing delays 116 , 120 . Setting time delays 116 , 120 to 0.024 milliseconds allows fault conditions to be cleared in 6 cycles. Finally, setting pickup currents 114 , 118 to reduced values minimizes the energy at which the fault condition is picked up and, thus, cleared.
- tie breakers 14 b It has been determined by the present disclosure that setting primary time delays 116 , 120 to zero is particularly advantages for tie breakers 14 b . If a defective tie-breaker with a shorted line or load side is “racked in”, namely installed into the system, the defective tie-breaker will cause an arcing fault on the primary connection on that side of the breaker. Because of the close proximity of the line and load sides of the breaker, this will typically cause the opposite bus to fault within several milliseconds. The backup function opens the backup main and tie-breakers immediately when the time delay 116 or 120 is reached. There is no additional delay introduced for fault initiation, additional pickup currents being reached or additional time delays. Thus, tie breaker 14 b can be disconnected from all potential sources in a single step.
- each zone 110 can be separately forced into reduced energy mode 140 , the remaining zones can remain in normal mode 130 . Thus, operation of any zone 110 of protection system 26 in reduced energy mode 140 does not compromise selectivity in the remaining zones. Because reduced energy can be applied to zone functions, it does not cause a reduction in selectivity for feeder load service or feeder fault conditions.
- operational modes 130 , 140 of protection system 26 are described herein by way of example only in use with a tiered power distribution system 10 having a plurality of protection zones. However, it is also contemplated by the present disclosure for protection system 26 having reduced energy let-through 140 to find equal use with non-tiered configurations of power distribution system 10 . Thus, it is contemplated by the present disclosure for reduced energy let-through 140 to find use not only in zone protection, but also in single breaker protection functions. Moreover, it is contemplated by the present disclosure for reduced energy let-through 140 to find use with protection system 26 having dynamic zone selective interlocking.
Abstract
A centrally controlled protection system is provided. The system includes a plurality of circuit breakers, a plurality of modules, and a central computer. Each of the plurality of breakers are in electrical communication with a respective one of the plurality of modules. The central computer is in communication with each of the plurality of modules via a network. The central computer controls the plurality of circuit breakers in either a normal mode or a reduced energy let-through mode.
Description
- This disclosure relates to centrally controlled protection systems. More particularly, this disclosure relates to centrally controlled protection systems having a reduced energy let-through mode.
- In power distribution systems, power is distributed to various loads from one or more feeder circuits. The power is typically divided into branch circuits, which supply power to the specified loads. It is known to provide circuit protective devices, e.g., circuit breakers, to protect the branch and feeder circuits in the event of undesired power conditions in the system.
- Circuit breakers typically function automatically to prevent or minimize damage. In some prior systems, the circuit breakers minimize the extent and duration of electrical service interruption.
- Recently, it has been proposed by the Assignee of the present application to provide centrally controlled protection systems, where all of the circuit breakers in the system are controlled by a centralized computer.
- It has now been determined that there is a need for centrally controlled protection systems having a reduced energy let-through mode.
- A centrally controlled protection system is provided. The system includes a plurality of circuit breakers, a plurality of modules, and a central computer. Each of the plurality of breakers is in electrical communication with a respective one of the plurality of modules. The central computer is in communication with each of the plurality of modules via a network. The central computer controls the plurality of circuit breakers in either a normal mode or a reduced energy let-through mode.
- A centrally controlled protection system is provided. The system includes main breakers at a first level of a power distribution system, tie-breakers at a second level of the power distribution system, and feeder breakers at a third level of the power distribution system. The main, tie, and feeder breakers are divided into zones of protection. Each of the main, tie, and feeder breakers is in electrical communication with a respective module. The system also includes a central computer in communication with each of the modules via a network so that the central computer controls the main, tie, and feeder breakers. The central computer includes normal settings groups that based upon a state of the main, tie, and feeder breakers within each respective zone of protection. The central computer also includes a forced settings group. The forced settings group includes at least one parameter adjusted, with respect to parameters of the normal settings groups, to reduce energy let-though the respective zone of protection.
- A method of controlling a centrally controlled protection system is provided. The method includes using a central controller to control a plurality of circuit breakers in a first zone of protection by automatically selecting from a plurality of normal settings groups based on a state of the plurality of circuit breakers in the first zone of protection, and forcing the central computer to control the plurality of circuit breakers in the first zone of protection using a forced settings group, the forced settings group having at least one parameter for reducing energy let through the zone of protection as compared to the normal settings groups.
- The above-described and other features and advantages of the present disclosure will be appreciated and understood by those skilled in the art from the following detailed description, drawings, and appended claims.
-
FIG. 1 is a schematic illustration of a centrally controlled protection system; -
FIG. 2 is a schematic illustration of a module of the protection system ofFIG. 1 ; -
FIG. 3 is a schematic illustration of a response time for the protection system ofFIG. 1 ; -
FIG. 4 illustrates an exemplary embodiment of a reduced energy let-through mode of the present disclosure; and -
FIG. 5 illustrates an exemplary embodiment of a settings group for the reduced energy let-through mode ofFIG. 4 . - Referring now to the drawings and in particular to
FIG. 1 , an exemplary embodiment of a power distribution system generally referred to byreference numeral 10 is illustrated.Power distribution system 10 distributes power from at least onepower bus 12 through a number or plurality of power switching devices orcircuit breakers 14 tobranch circuits 16. -
Power bus 12 is illustrated by way of example as a three-phase power system having afirst phase 18, asecond phase 20, and athird phase 22.Power bus 12 can also include a neutral phase (not shown).Power distribution system 10 is illustrated for purposes of clarity distributing power frompower bus 12 to fourcircuits 16 by fourfeeder breakers 14. Of course, it is contemplated by the present disclosure forpower bus 12 to have any desired number of phases and/or forpower distribution system 10 to have any desired number ofcircuit breakers 14 and any topology of circuit breakers, e.g., in series, or in parallel, or other combinations. - Each
circuit breaker 14 has a set of separable contacts 24 (illustrated schematically). Contacts 24 selectively placepower bus 12 in communication with at least one load (also illustrated schematically) oncircuit 16. The load can include devices, such as, but not limited to, motors, welding machinery, computers, heaters, lighting, and/or other electrical equipment. -
Power distribution system 10 is illustrated inFIG. 1 with an exemplary embodiment of a centrally controlled and fully integrated protection, monitoring, and control system 26 (hereinafter “protection system”). - Advantageously, it has been determined by the present disclosure that
protection system 26 can include a reduced energy let-through mode, which reduces the amount of energy that is let through portions of thepower distribution system 10 as needed. For example,protection system 26 can be placed into the reduced energy let-through mode during activities such as maintenance or when an operator is in close proximity to various components in thepower distribution system 10. As will be described in greater detail below,protection system 26, while in the reduced energy let-through mode, can set the time delay between a particular zone function and a backup function to zero. Thus,protection system 26 can trip all of thecircuit breakers 14 that can potentially feed a fault within the initial delay. Moreover, the reduced energy let-through mode allows the delay in the each zone function to be changed to 0.024 seconds so that all zone faults can be cleared in 6 cycles, while not compromising out of zone selectivity. Finally, the reduced energy let-through mode allows the current pickup values in the particular zone functions to be reduced to minimize the current of these zone functions. As such,protection system 26, when in the reduced energy let-through mode, can reduce the energy let-throughpower distribution system 10. - Beginning with the general
operation protection system 26, the protection system is configured to control and monitorpower distribution system 10 from a central control processing unit 28 (hereinafter “CCPU”). CCPU 28 communicates with a number or plurality of data sample and transmission modules 30 (hereinafter “module”) over adata network 32.Network 32 communicates all of the information from all of themodules 30 substantially simultaneously to CCPU 28. - Thus,
protection system 26 can include protection and control schemes that consider the value of electrical signals, such as current magnitude and phase, at one or all thecircuit breakers 14. Further,protection system 26 integrates the protection, control, and monitoring functions of theindividual breakers 14 ofpower distribution system 10 in a single, centralized control processor (e.g., CCPU 28).Protection system 26 provides CCPU 28 with all of a synchronized set of information available through digital communication withmodules 30 andcircuit breakers 14 onnetwork 32 and provides the CCPU with the ability to operate these devices based on this complete set of data. - Specifically, CCPU 28 performs all primary power distribution functions for
power distribution system 10. Namely, CCPU 28 may performs some or all of instantaneous overcurrent protection (IOC), short time overcurrent, longtime overcurrent, relay protection, and logic control as well as digital signal processing functions ofprotection system 26. Thus,protection system 26 enables settings to be changed and data to be logged in a single, central location, i.e., CCPU 28. CCPU 28 is described herein by way of example as a central processing unit. Of course, it is contemplated by the present disclosure for CCPU 28 to include any programmable circuit, such as, but not limited to, computers, processors, microcontrollers, microcomputers, programmable logic controllers, application specific integrated circuits, and other programmable circuits. - As shown in
FIG. 1 , eachmodule 30 is in communication with one of thecircuit breakers 14. Eachmodule 30 is also in communication with at least onesensor 34 sensing a condition or electrical parameter of the power in each phase (e.g.,first phase 18,second phase 20,third phase 22, and neutral) ofbus 12 and/orcircuit 16.Sensors 34 can include current transformers (CTs), potential transformers (PTs), and any combination thereof.Sensors 34 monitor a condition or electrical parameter of the incoming power incircuits 16 and provide a first orparameter signal 36 representative of the condition of the power tomodule 30. For example,sensors 34 can be current transformers that generate a secondary current proportional to the current incircuit 16 so that first signals 36 are the secondary current. -
Module 30 sends and receives one or moresecond signals 38 to and/or fromcircuit breaker 14.Second signals 38 can be representative of one or more conditions ofbreaker 14, such as, but not limited to, a position or state ofseparable contacts 24, a spring charge switch status, a lockout state or condition, and others. In addition,module 30 is configured to operate or actuatecircuit breaker 14 by sending one or morethird signals 40 to the breaker to open/closeseparable contacts 24 as desired, such as open/close commands or signals. In a first embodiment,circuit breakers 14 cannot openseparable contacts 24 unless instructed to do so byprotection system 26. -
Protection system 26 utilizesdata network 32 for data acquisition frommodules 30 and data communication to the modules. Accordingly,network 32 is configured to provide a desired level of communication capacity and traffic management betweenCCPU 28 andmodules 30. In an exemplary embodiment,network 32 can be configured to not enable communication between modules 30 (i.e., no module-to-module communication). - In addition,
protection system 26 can be configured to provide a consistent fault response time. As used herein, the fault response time ofprotection system 26 is defined as the time between when a fault condition occurs and thetime module 30 issues an trip command to its associatedbreaker 14. In an exemplary embodiment,protection system 26 has a fault response time that is less than a single cycle of the 60 Hz (hertz) waveform. For example,protection system 26 can have a maximum fault response time of about three milliseconds. - The configuration and operational protocols of
network 32 are configured to provide the aforementioned communication capacity and response time. For example,network 32 can be an Ethernet network having a star topology as illustrated inFIG. 1 . In this embodiment,network 32 is a full duplex network having the collision-detection multiple-access (CSMA/CD) protocols typically employed by Ethernet networks removed and/or disabled. Rather,network 32 is a switched Ethernet for preventing collisions. - In this configuration,
network 32 provides a data transfer rate of at least about 100 Mbps (megabits per second). For example, the data transfer rate can be about 1 Gbps (gigabits per second). Additionally, communication betweenCCPU 28 andmodules 30 acrossnetwork 32 can be managed to optimize the use ofnetwork 32. For example,network 32 can be optimized by adjusting one or more of a message size, a message frequency, a message content, and/or a network speed. - Accordingly,
network 32 provides for a response time that includes scheduled communications, a fixed message length, full-duplex operating mode, and a switch to prevent collisions so that all messages are moved to memory inCCPU 28 before the next set of messages is scheduled to arrive. Thus,protection system 26 can perform the desired control, monitoring, and protection functions in a central location and manner. - It should be recognized that
data network 32 is described above by way of example only as an Ethernet network having a particular configuration, topography, and data transmission protocols. Of course, the present disclosure contemplates the use of any data transmission network that ensures the desired data capacity and consistent fault response time necessary to perform the desired range of functionality. The exemplary embodiment achieves sub-cycle transmission times betweenCCPU 28 andmodules 30 and full sample data to perform all power distribution functions for multiple modules with the accuracy and speed associated with traditional devices. -
CCPU 28 can perform branch circuit protection, zone protection, and relay protection interdependently because all of the system information is in one central location, namely at the CCPU. In addition,CCPU 28 can perform one or more monitoring functions on the centrally located system information. Accordingly,protection system 26 provides a coherent and integrated protection, control, and monitoring methodology not considered by prior systems. For example,protection system 26 integrates and coordinates load management, feed management, system monitoring, and other system protection functions in a low cost and easy to install system. - An exemplary embodiment of
module 30 is illustrated inFIG. 2 .Module 30 has amicroprocessor 42, adata bus 44, anetwork interface 46, apower supply 48, and one ormore memory devices 50. -
Power supply 48 is configured to receive power from afirst source 52 and/or asecond source 54.First source 52 can be one or more of an uninterruptible power supply (not shown), a plurality of batteries (not shown), a power bus (not shown), and other sources. In the illustrated embodiment,second source 54 is the secondary current available fromsensors 34. -
Power supply 48 is configured to providepower 56 tomodule 30 from first andsecond sources power supply 48 can providepower 56 tomicroprocessor 42,data bus 42,network interface 44, andmemory devices 50.Power supply 48 is also configured to provide afourth signal 58 tomicroprocessor 42.Fourth signal 58 is indicative of what sources are supplying power topower supply 48. For example,fourth signal 58 can indicate whetherpower supply 48 is receiving power fromfirst source 52,second source 54, or both of the first and second sources. -
Network interface 46 andmemory devices 50 communicate withmicroprocessor 42 overdata bus 44.Network interface 46 can be connected to network 32 so thatmicroprocessor 42 is in communication withCCPU 28. -
Microprocessor 42 receives digital representations offirst signals 36 and second signals 38. First signals 36 are continuous analog data collected bysensors 34, whilesecond signals 38 are discrete analog data frombreaker 14. Thus, the data sent frommodules 30 toCCPU 28 is a digital representation of the actual voltages, currents, and device status. For example, first signals 36 can be analog signals indicative of the current and/or voltage incircuit 16. - Accordingly,
protection system 26 provides the actual raw parametric or discrete electrical data (i.e., first signals 36) and device physical status (i.e., second signal 38) toCCPU 28 vianetwork 32, rather than processed summary information sampled, created, and stored by devices such as trip units, meters, or relays. As a result,CCPU 28 has complete, raw system-wide data with which to make decisions and can therefore operate any or allbreakers 14 onnetwork 32 based on information derived from asmany modules 30 as the control and protection algorithms resident inCCPU 28 require. -
Module 30 has asignal conditioner 60 and an analog-digital converter 62. First signals 36 are conditioned bysignal conditioner 60 and converted todigital signals 64 by A/D converter 62. Thus,module 30 collects first signals 36 and presentsdigital signals 64, representative of the raw data in the first signals, tomicroprocessor 42. For example,signal conditioner 60 can include a filtering circuit (not shown) to improve a signal-to-noise ratio forfirst signal 36, a gain circuit (not shown) to amplify the first signal, a level adjustment circuit (not shown) to shift the first signal to a pre-determined range, an impedance match circuit (not shown) to facilitate transfer of the first signal to A/D converter 62, and any combination thereof. Further, A/D converter 62 can be a sample-and-hold converter with externalconversion start signal 66 frommicroprocessor 42 or aclock circuit 68 controlled bymicroprocessor 42 to facilitate synchronization ofdigital signals 64. - It is desired for
digital signals 64 from all of themodules 30 inprotection system 26 to be collected at substantially the same time. Specifically, it is desired fordigital signals 64 from all of themodules 30 inprotection system 26 to be representative of substantially the same time instance of the power inpower distribution system 10. -
Modules 30 sampledigital signals 64 based, at least in part, upon a synchronization signal orinstruction 70 as illustrated inFIG. 1 .Instruction 70 can be generated from a synchronizingclock 72 that is internal or external toCCPU 28.Synchronization instruction 70 is simultaneously communicated fromCCPU 28 tomodules 30 overnetwork 32. Synchronizingclock 72 sendssynchronization instructions 70 at regular intervals toCCPU 28, which forwards the instructions to allmodules 30 onnetwork 32. -
Modules 30use synchronization instruction 70 to modify a resident sampling protocol. For example, eachmodule 30 can have a synchronization algorithm resident onmicroprocessor 42. The synchronization algorithm resident onmicroprocessor 42 can be a software phase-lock-loop algorithm. The software phase-lock-loop algorithm adjusts the sample period ofmodule 30 based, in part, onsynchronization instructions 70 fromCCPU 28. Thus,CCPU 28 andmodules 30 work together inprotection system 26 to ensure that the sampling (i.e., digital signals 64) from all of the modules in the system is synchronized. - Accordingly,
protection system 26 is configured to collectdigital signals 64 frommodules 30 based in part onsynchronization instruction 70 so that the digital signals are representative of the same time instance, such as being within a predetermined time-window from one another. Thus,CCPU 28 can have a set of accurate data representative of the state of each monitored location (e.g., modules 30) within thepower distribution system 10. The predetermined time-window can be less than about ten microseconds. For example, the predetermined time-window can be about five microseconds. - The predetermined time-window of
protection system 26 can be affected by the port-to port variability ofnetwork 32. In an exemplary embodiment,network 32 has a port-to-port variability of in a range of about 24 nanoseconds to about 720 nanoseconds. In an alternate exemplary embodiment,network 32 has a maximum port-to-port variability of about 2 microseconds. - It has been determined that control of all of
modules 30 to this predetermined time-window byprotection system 26 enables a desired level of accuracy in the metering and vector functions across the modules, system waveform capture with coordinated data, accurate event logs, and other features. In an exemplary embodiment, the desired level of accuracy is equal to the accuracy and speed of traditional devices. For example, the predetermined time-window of about ten microseconds provides an accuracy of about 99% in metering and vector functions. -
Second signals 38 from eachcircuit breaker 14 to eachmodule 30 are indicative of one or more conditions of the circuit breaker.Second signals 38 are provided to a discrete I/O circuit 74 ofmodule 30.Circuit 74 is in communication withcircuit breaker 14 andmicroprocessor 42.Circuit 74 is configured to ensure that second signals 38 fromcircuit breaker 14 are provided tomicroprocessor 42 at a desired voltage and without jitter. For example,circuit 74 can include de-bounce circuitry and a plurality of comparators. -
Microprocessor 42 samples first andsecond signals CCPU 28. Then,converter 62 converts the first andsecond signals digital signals 64, which is packaged into a first message 76 having a desired configuration bymicroprocessor 42. First message 76 can include an indicator that indicates whichsynchronization signal 70 the first message was in response to. Thus, the indicator of whichsynchronization signal 70 first message 76 is responding to is returned toCCPU 28 for sample time identification. -
CCPU 28 receives first message 76 from each of themodules 30 overnetwork 32 and executes one or more protection and/or monitoring algorithms on the data sent in all of the first messages. Based on first message 76 from one ormore modules 30,CCPU 28 can control the operation of one ormore circuit breakers 14. For example, whenCCPU 28 detects a fault from one or more of first messages 76, the CCPU sends asecond message 78 to one ormore modules 30 vianetwork 32, such as open or close commands or signals, or circuit breaker actuation or de-actuation commands or signals. - In response to
second message 78,microprocessor 42 causesthird signal 40 to operate or actuate (e.g., open contacts 24)circuit breaker 14.Circuit breaker 14 can include more than one operation or actuation mechanism. For example,circuit breaker 14 can have ashunt trip 80 and a magnetically heldsolenoid 82.Microprocessor 42 is configured to send afirst output 84 to operateshunt trip 80 and/or asecond output 86 to operatesolenoid 82.First output 84 instructs apower control module 88 to provide third signal 40 (i.e., power) to shunttrip 80, which can separatecontacts 24.Second output 86 instructs agating circuit 90 to providethird signal 40 to solenoid 82 (i.e., flux shifter) to separatecontacts 24. It should be noted thatshunt trip 80 requiresfirst source 52 to be present, whilesolenoid 82 can be operated when onlysecond source 54 is present. In this manner,microprocessor 42 can operatecircuit breaker 14 in response to a specified condition, such as, for example, a detected overcurrent, regardless of the state of first andsecond sources circuit breaker 14. - Accordingly,
modules 30 are adapted to sample first signals 36 fromsensors 34 as synchronized by the CCPU.Modules 30 then package the digital representations (i.e., digital signals 64) of first andsecond signals modules 30 are sent toCCPU 28 vianetwork 32.CCPU 28 processes first message 76 and generates and stores instructions to control the operation of eachcircuit breaker 14 insecond message 78.CCPU 28 sendssecond message 78 to all of themodules 30. In an exemplary embodiment,CCPU 28 sendssecond message 78 to all of themodules 30 in response tosynchronization instruction 70. - Accordingly,
protection system 26 can control eachcircuit breaker 14 based on the information from that breaker alone, or in combination with the information from one or more of the other breakers in theprotection system 26. Under normal operating conditions,protection system 26 performs all monitoring, protection, and control decisions atCCPU 28. - Referring now to
FIG. 3 , an exemplary embodiment of aresponse time 96 forprotection system 26 is illustrated with the system operating stably (e.g., not functioning in a start-up mode).Response time 96 is shown starting at T0 and ending at T1.Response time 96 is the sum of asample time 98, a receive/validatetime 100, aprocess time 102, a transmittime 104, and a decode/executetime 106. - In this example,
protection system 26 includes twenty-fourmodules 30 each connected to adifferent circuit breaker 14. Eachmodule 30 is scheduled by the phase-lock-loop algorithm andsynchronization instruction 70 to sample itsfirst signals 36 at a prescribed rate of 128 samples per cycle.Sample time 98 includes foursample intervals 108 of about 0.13 milliseconds (ms) each. Thus,sample time 98 is about 0.27 ms for data sampling and packaging into first message 76. - Receive/validate
time 100 is preferably initiated at a fixed time delay after the receipt ofsynchronization instruction 70. In an exemplary embodiment, receive/validatetime 100 is a fixed time that is, for example, the time required to receive all first messages 76 as determined from the latency ofdata network 32. For example, receive/validatetime 100 can be about 0.25 ms where each first message 76 has a size of about 1000 bits,protection system 26 includes twenty-four modules 30 (i.e., 24,000 bits), andnetwork 32 is operating at about 100 Mbps. Accordingly,CCPU 28 manages the communications and moving of first messages 76 to the CCPU during receive/validatetime 100. - The protection processes (i.e., process time 102) starts at the end of the fixed receive/validate
time 100 regardless of the receipt of first messages 76. If anymodules 30 are not sending first messages 76,CCPU 28 flags this error and performs all functions that have valid data. Sinceprotection system 26 is responsible for protection and control ofmultiple modules 30,CCPU 28 is configured to not stop the entire system due to the loss of data (i.e., first message 76) from asingle module 30. In an exemplary embodiment,process time 102 is about 0.52 ms. -
CCPU 28 generatessecond message 78 duringprocess time 102.Second message 78 can be twenty-four second messages (i.e., one per module 30) each having a size of about 64 bits per module. Alternately, it is contemplated by the present disclosure forsecond message 78 to be a single, multi-cast or broadcast message. In this embodiment,second message 78 includes instructions for eachmodule 30 and has a size of about 1600 bits. - Transmit
time 104 is the time necessary to transmitsecond message 78 acrossnetwork 32. In the example wherenetwork 32 is operating at about 100 Mbps andsecond message 78 is about 1600 bits, transmittime 104 is about 0.016 ms. - It is also contemplated for
second message 78 to include a portion ofinstruction 70. For example,CCPU 28 can be configured to sendsecond message 78 upon receipt of thenext synchronization instruction 70 fromclock 72. In this example, the interval between consecutive second messages 76 can be measured bymodule 30 and the synchronization information in the second message, if any, can be used by the synchronization algorithm resident onmicroprocessor 42. - Once
modules 30 receivesecond message 78, each module decodes the message and executes its instructions (i.e., send third signals 40), if any, in decode/executetime 106. For example, decode/executetime 106 can be about 0.05 ms. - In this example,
response time 96 is about 1.11 ms. Of course, it should be recognized thatsystem response time 96 can be accelerated or decelerated based upon the needs ofprotection system 26. For example,system response time 96 can be adjusted by changing one or more of the sample period, the number of samples per transmission, the number ofmodules 30, the message size, the message frequency, the message content, and/or the network speed. - It is contemplated by the present disclosure for
protection system 26 to haveresponse time 96 of up to about 3 milliseconds. Thus,protection system 26 is configured to open any of its circuit breakers within about 3 milliseconds from thetime sensors 34 sense conditions outside of the set parameters. - As discussed briefly above, it has been determined by the present application that
protection system 26 can include both anormal mode 130 and reduced energy let-throughmode 140. Theseoperational modes protection system 26 are described with reference toFIG. 4 , in whichpower distribution system 10 is illustrated having multiple tiers or levels. Specifically,power distribution system 10 includes main breakers 14-a at a first level, tie-breakers 14 b at a second level, andfeeder breakers 14 c at a third level. For purposes of clarity, certain components of power distribution andprotection systems FIG. 4 . -
Protection system 26 can be divided into a plurality of zones of protection 110. In the embodiment illustrated,protection system 26 is illustrated having three zones of protection 110, namely a first zone 110-1, a second zone 110-2, and a third zone 110-3. Each of the zones 110 includes one main breaker 14 a, two tie-breakers 14 b, and twofeeder breakers 14 c, where each tie breaker 14 b is protected by multiple adjacent zones. Since each zone includes two tie-breakers 14 b, one on the left of the zone and one on the right, the tie- breaker 14 b on the left of each zone acts as a backup breaker to the zone 110-2. - Of course, it is contemplated by the present disclosure for
protection system 26 to have any number of protection zones 110. In addition, it is contemplated by the present disclosure for the protection zones 110 inprotection system 26 to have any number ofbreakers 14 a, 14 b, 14 c. - The state (i.e., open or closed) of
circuit breakers 14 a, 14 b, 14 c at a given time define the topology of zone 110 at that time. Thus, each zone 110 ofprotection system 26 includes a unique settings group 112 for each of the possible topologies or states. - Referring to
FIG. 5 , five of the possible settings groups 112 for any of the zones 110-1, 110-2, 110-3 withinprotection system 10 are shown. Each settings group 112 includes twoprimary pickup currents primary time delays Delta T 122. This allows setting a longer delay for lower energy events to minimize nuisance operations and a short delay to limit the “on time” of high energy events. The backup function will trip the defined backup breakers in the event the fault current does not go to zero within the specifieddelta time 122. The backup function does not require additional breakers to be in pickup or time delays other than thedelta time 122. In the illustrated settings groups 112, thepickup currents times - In the
normal mode 130,protection system 26 automatically switches between normal settings groups 112-1, 112-2, 112-3 and 112-4 based upon the state ofcircuit breakers 14 inpower distribution system 10.Protection system 26 attempts to clear a fault condition in each zone 110 with thenearest breaker 14 upstream of the fault condition using theprimary parameters feeder breaker compartment 14 c of the second zone 110-2,protection system 26 detects the fault in zone 110-2 using either set ofprimary parameters Protection system 26 temporarily, viadelta time 122, restrains operation of backup main breakers 14 a and/or tie-breaker 14 b to provide the primary main breakers 14 a and tie breakers 14 b sufficient time to clear the fault condition. - In this manner,
protection system 26 can control the protection within each zone 110, while maintaining power available in as much ofpower distribution system 10 as possible. - Advantageously, any one zone 110 or, preferably, all zones 110-1 through 110-3 within
protection system 26 can be forced to reducedenergy mode 140, which forces that zone to use a forced settings group 112-0. For example, an operator can manually force any zone 110 to reducedenergy mode 140 via a human-machine interface 92 in communication withCCPU 28 as shown inFIG. 1 . In another example, zones 110 inprotection system 26 can be forced to reducedenergy mode 140 via an action of the operator such as, but not limited to, opening a panel that houses one ormore breakers 14 in that zone. - Forcing a zone 110 to forced settings group 112-0
blocks protection system 26 from automatically switching among normal settings groups 112-1 through 112-4. Rather,protection system 26 controls that zone 110 with forced settings group 112-0 until the operator forces that zone back to normal settings groups 112-1 through 112-4. - Thus,
protection system 26 automatically operates innormal mode 130 using normal settings groups 112-1 through 112-4, but is forced by an operator to function in reduced energy let-throughmode 140 using force settings group 112-0. - The parameters in forced settings group 112-0 are adjusted to reduce the energy let-though that particular zone 110 as compared the parameters in normal settings groups 112-1 through 112-4. For example, forced settings group 112-0 can have a lower value for first pickup current 114,
first time delay 116, second pickup current 118,second time delay 120,time delta 122, or any combinations thereof.—In some embodiments, the parameters in forced settings group 112-0 can also enable/disable any function and the backup function withinprotection system 26. - As seen in the embodiment illustrated in
FIG. 5 , the parameters in forced settings group 112-0 have been optimized to minimize the energy let through. Specifically, forced settings group 112-0 includes parameters that have been reduced to lower values for maximum protection. Thus, forced settings group 112-0 hasprimary pickup currents primary time delays time delta 122 of zero seconds. Setting thedelta time 122 to zero allowsprotection system 26 to trip all of thecircuit breakers 14 a, 14 b, 14 c that can potentially feed the fault condition after only clearingdelays time delays pickup currents - It has been determined by the present disclosure that setting
primary time delays time delay - Since each zone 110 can be separately forced into reduced
energy mode 140, the remaining zones can remain innormal mode 130. Thus, operation of any zone 110 ofprotection system 26 in reducedenergy mode 140 does not compromise selectivity in the remaining zones. Because reduced energy can be applied to zone functions, it does not cause a reduction in selectivity for feeder load service or feeder fault conditions. - It should be recognized that
operational modes protection system 26 are described herein by way of example only in use with a tieredpower distribution system 10 having a plurality of protection zones. However, it is also contemplated by the present disclosure forprotection system 26 having reduced energy let-through 140 to find equal use with non-tiered configurations ofpower distribution system 10. Thus, it is contemplated by the present disclosure for reduced energy let-through 140 to find use not only in zone protection, but also in single breaker protection functions. Moreover, it is contemplated by the present disclosure for reduced energy let-through 140 to find use withprotection system 26 having dynamic zone selective interlocking. - It should also be noted that the terms “first”, “second”, “third”, “upper”, “lower”, and the like may be used herein to modify various elements. These modifiers do not imply a spatial; sequential, or hierarchical order to the modified elements unless specifically stated.
- While the instant disclosure has been described with reference to one or more exemplary embodiments, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the scope thereof. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the disclosure without departing from the scope thereof. Therefore, it is intended that the disclosure not be limited to the particular embodiment(s) disclosed as the best mode contemplated for carrying out this invention, but that the invention will include all embodiments falling within the scope of the appended claims.
Claims (18)
1. A centrally controlled protection system, comprising:
a plurality of circuit breakers;
a plurality of modules, each of said plurality of breakers being in electrical communication with a respective one of said plurality of modules; and
a central computer in communication with each of said plurality of modules via a network, said central computer controlling said plurality of circuit breakers in either a normal mode or a reduced energy let-through mode.
2. The centrally controlled protection system as in claim 1 , wherein said central computer performs all primary power distribution functions in said normal mode and said reduced energy let-through mode.
3. The centrally controlled protection system as in claim 2 , wherein said primary power distribution functions comprises functions selected from the group consisting of instantaneous overcurrent protection, short time overcurrent, longtime overcurrent, relay protection, logic control, and any combinations thereof.
4. The centrally controlled protection system as in claim 1 , wherein said central computer operates in said normal mode until forced to said reduced energy let-through mode by an operator.
5. The centrally controlled protection system as in claim 1 , wherein said reduced energy let-through mode comprises at least one parameter that lets reduced energy through said plurality of breakers as compared to said normal mode.
6. The centrally controlled protection system as in claim 5 , wherein said at least one parameter is selected from the group consisting of primary pickup currents, primary time delays, a time delta, and any combinations thereof.
7. The centrally controlled protection system as in claim 1 , wherein said plurality of circuit breakers are arranged in a tiered power distribution system or a non-tiered power distribution system.
8. The centrally controlled protection system as in claim 1 , wherein said plurality of circuit breakers are arranged in a plurality of protection zones.
9. A centrally controlled protection system, comprising:
a plurality of main breakers at a first level of a power distribution system;
a plurality of tie-breakers at a second level of the power distribution system;
a plurality of feeder breakers at a third level of the power distribution system, said plurality of main, tie, and feeder breakers being divided into a plurality of zones of protection;
a plurality of modules, each of said plurality of main, tie, and feeder breakers being in electrical communication with a respective one of said plurality of modules;
a central computer in communication with each of said plurality of modules via a network so that said central computer controls said plurality of main, tie, and feeder breakers;
a plurality of normal settings groups resident in said central computer based upon a state of said main, tie, and feeder breakers within each respective zone of protection; and
a forced settings group resident in said central computer, said forced settings group comprising at least one parameter adjusted, with respect to parameters of said plurality of normal settings groups, to reduce energy let-though said respective zone of protection.
10. The centrally controlled protection system as in claim 9 , wherein said at least one parameter in said forced settings group comprises a parameter selected from the group consisting a first pickup current, a first time delay, a second pickup current, a second time delay, a time delta and any combinations thereof.
11. The centrally controlled protection system as in claim 9 , wherein said central computer performs all primary power distribution functions for said plurality of main, tie, and feeder breakers.
12. The centrally controlled protection system as in claim 11 , wherein said primary power distribution functions comprises functions selected from the group consisting of instantaneous overcurrent protection, short time overcurrent, longtime overcurrent, relay protection, logic control, and any combinations thereof.
13. The centrally controlled protection system as in claim 11 , wherein said central computer performs said primary power distribution functions for said plurality of main, tie, and feeder breakers based on said plurality of normal settings groups until forced to use said forced of settings group by an operator.
14. The centrally controlled protection system as in claim 9 , wherein said central computer operates in a normal mode using said plurality of normal settings groups and in a reduced energy let-through mode using said forced settings group.
15. A method of controlling a centrally controlled protection system, comprising:
using a central controller to control a plurality of circuit breakers by automatically selecting from a plurality of normal settings groups based on a state of said plurality of circuit breakers; and
forcing said central computer to control at least one of said plurality of circuit breakers using a forced settings group, said forced settings group having at least one parameter for reducing energy let as compared to said normal settings groups.
16. A method of controlling a centrally controlled protection system, comprising:
using a central controller to control a plurality of circuit breakers in a first zone of protection by automatically selecting from a plurality of normal settings groups based on a state of said plurality of circuit breakers in said first zone of protection; and
forcing said central computer to control said plurality of circuit breakers in said first zone of protection using a forced settings group, said forced settings group having at least one parameter for reducing energy let through said zone of protection as compared to said normal settings groups.
17. The method as in claim 16 , wherein said at least one parameter comprises a parameter selected from the group consisting a first pickup current, a first time delay, a second pickup current, a second time delay, a time delta and any combinations thereof.
18. The method as in claim 16 , wherein forcing said central computer to control said plurality of circuit breakers in said first zone of protection using said forced settings group comprises:
selecting a reduced energy let-through mode for said first zone of protection from an interface in communication with said central computer.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/323,932 US20070159746A1 (en) | 2005-12-30 | 2005-12-30 | Centrally controlled protection systems having reduced energy let-through mode |
US12/005,245 US7751165B2 (en) | 2005-11-30 | 2007-12-26 | Centrally controlled protection systems having reduced energy let-through mode |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/323,932 US20070159746A1 (en) | 2005-12-30 | 2005-12-30 | Centrally controlled protection systems having reduced energy let-through mode |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/290,008 Continuation US8032260B2 (en) | 2005-11-30 | 2005-11-30 | Method and system for controlling a power distribution system |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/005,245 Continuation US7751165B2 (en) | 2005-11-30 | 2007-12-26 | Centrally controlled protection systems having reduced energy let-through mode |
Publications (1)
Publication Number | Publication Date |
---|---|
US20070159746A1 true US20070159746A1 (en) | 2007-07-12 |
Family
ID=38232506
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/323,932 Abandoned US20070159746A1 (en) | 2005-11-30 | 2005-12-30 | Centrally controlled protection systems having reduced energy let-through mode |
US12/005,245 Active 2026-02-01 US7751165B2 (en) | 2005-11-30 | 2007-12-26 | Centrally controlled protection systems having reduced energy let-through mode |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/005,245 Active 2026-02-01 US7751165B2 (en) | 2005-11-30 | 2007-12-26 | Centrally controlled protection systems having reduced energy let-through mode |
Country Status (1)
Country | Link |
---|---|
US (2) | US20070159746A1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090262471A1 (en) * | 2008-04-18 | 2009-10-22 | Colorado Vnet Llc | Arc Fault Circuit Interrupter (AFCI) Support |
CN101937032A (en) * | 2010-07-14 | 2011-01-05 | 江苏金智科技股份有限公司 | Method for implementing fault playback of wave recording file in relay protection device |
US20110063202A1 (en) * | 2009-09-11 | 2011-03-17 | General Electric Company | Reduced Energy Let Through Mode Indication and Delay in Switching Devices |
US8385035B2 (en) | 2010-07-16 | 2013-02-26 | General Electric Company | Protection system having reduced energy let-through mode and zone selectivity |
CN104318404A (en) * | 2014-11-19 | 2015-01-28 | 国网河南省电力公司濮阳供电公司 | Relay protection equipment standing book managing method and system |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008023385A1 (en) * | 2005-11-30 | 2008-02-28 | Mukundlal Madhavlal Joshi | Electrical fault restricting system |
GB2527534A (en) * | 2014-06-24 | 2015-12-30 | Eaton Ind Netherlands Bv | Selective circuit breaker |
US9488689B2 (en) | 2014-08-28 | 2016-11-08 | General Electric Company | Systems and methods for identifying fault location using distributed communication |
EP3026771B1 (en) | 2014-11-27 | 2021-11-24 | Siemens Aktiengesellschaft | Electrical energy distributor |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070121265A1 (en) * | 2005-11-30 | 2007-05-31 | Hill Theodore D Iii | Method and system for controlling a power distribution system |
US7254001B2 (en) * | 2002-02-25 | 2007-08-07 | General Electric Company | Circuit protection system |
Family Cites Families (43)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3903807A (en) | 1973-01-12 | 1975-09-09 | Averette T Lee | Mass rapid system |
US4073000A (en) | 1976-06-30 | 1978-02-07 | S & C Electric Company | Electrical interlock apparatus for electrical equipment |
US4752853A (en) | 1987-02-20 | 1988-06-21 | Westinghouse Electric Corp. | Circuit interrupter apparatus with an integral trip curve display |
AU9102191A (en) | 1990-11-30 | 1992-06-25 | Square D Company | Display for a circuit breaker trip unit |
US5164875A (en) | 1990-12-19 | 1992-11-17 | Square D Company | Addressable relay module for circuit breakers |
US5455760A (en) | 1991-06-28 | 1995-10-03 | Square D Company | Computer-controlled circuit breaker arrangement with circuit breaker having identification circuit |
US5253159A (en) | 1991-06-28 | 1993-10-12 | Square D Company | Electrical distribution system having controller responsive to multiple command paths |
US5892449A (en) | 1991-06-28 | 1999-04-06 | Square D Company | Electrical distribution system with an external multiple input and status unit |
FR2679039B1 (en) | 1991-07-09 | 1993-11-26 | Merlin Gerin | ELECTRICAL ENERGY DISTRIBUTION DEVICE WITH INSULATION CONTROL. |
CA2101849A1 (en) | 1991-12-18 | 1993-06-19 | Andy A. Haun | Remotely programmable electronic trip system |
US5343192A (en) | 1992-09-10 | 1994-08-30 | At&T Bell Laboratories | Fuse or circuit breaker status indicator |
US6055144A (en) | 1993-02-26 | 2000-04-25 | Square D Company | Electrical power distribution system utilizing circuit breakers with internal control and communication circuitry |
US5825643A (en) | 1993-08-25 | 1998-10-20 | Square D Company | Programming device for a circuit breaker |
US5581433A (en) | 1994-04-22 | 1996-12-03 | Unitrode Corporation | Electronic circuit breaker |
IT1271772B (en) | 1994-12-16 | 1997-06-09 | Bticino Spa | MODULAR AUXILIARY MODULAR EQUIPMENT OF AUTOMATIC MODULAR PROTECTION SWITCHES |
US5596473A (en) | 1995-02-06 | 1997-01-21 | Eaton Corporation | Electrical switches with current protection interfaced with a remote station and a portable local unit |
US5872722A (en) | 1996-09-04 | 1999-02-16 | Eaton Corporation | Apparatus and method for adjustment and coordination of circuit breaker trip curves through graphical manipulation |
EP0933859A1 (en) | 1998-01-29 | 1999-08-04 | ABB ADDA S.p.A. | Electronic on-line control and monitoring system for high-voltage circuit breakers |
US6038516A (en) | 1998-03-19 | 2000-03-14 | Siemens Energy & Automation, Inc. | Method for graphically displaying a menu for selection and viewing of the load related parameters of a load connected to an AC load control device |
US20020032535A1 (en) | 1998-03-19 | 2002-03-14 | James O. Alexander | Energy information management method for use with a circuit breaker |
US5982596A (en) | 1998-05-05 | 1999-11-09 | George Authur Spencer | Load center monitor and digitally enhanced circuit breaker system for monitoring electrical power lines |
US6005757A (en) | 1998-05-11 | 1999-12-21 | Eaton Corporation | Electrical switching device or trip unit acquiring predetermined settings from another electrical switching device or trip unit |
KR20010071284A (en) | 1998-05-19 | 2001-07-28 | 추후제출 | Power System |
FR2786919B1 (en) | 1998-12-07 | 2001-01-12 | Schneider Electric Ind Sa | CONTROL DEVICE FOR AN ELECTRO-MAGNET FOR OPENING OR CLOSING A CIRCUIT BREAKER, WITH LOCAL CONTROL AND REMOTE CONTROL |
US6127882A (en) | 1999-02-23 | 2000-10-03 | Maxim Integrated Products, Inc. | Current monitors with independently adjustable dual level current thresholds |
US6411865B1 (en) | 2000-06-26 | 2002-06-25 | Schweitzer Engineering Laboratories, Inc. | System for protection zone selection in microprocessor-based relays in an electric power system |
JP4443025B2 (en) | 2000-12-08 | 2010-03-31 | 三菱電機株式会社 | Electric circuit breaker operation device |
AU763276B2 (en) | 2001-02-07 | 2003-07-17 | Hitachi Limited | Gas insulated switchgear |
US7718889B2 (en) | 2001-03-20 | 2010-05-18 | American Power Conversion Corporation | Adjustable scalable rack power system and method |
US6992247B2 (en) * | 2002-01-02 | 2006-01-31 | American Power Conversion Corporation | Toolless mounting system and method for an adjustable scalable rack power system |
US6967283B2 (en) * | 2001-03-20 | 2005-11-22 | American Power Conversion Corporation | Adjustable scalable rack power system and method |
US20030009302A1 (en) | 2001-07-09 | 2003-01-09 | Leslie David S. | Method and apparatus for multi-function generator protective relay system |
US7324876B2 (en) * | 2001-07-10 | 2008-01-29 | Yingco Electronic Inc. | System for remotely controlling energy distribution at local sites |
US20030063723A1 (en) | 2001-09-28 | 2003-04-03 | Derek Booth | Interactive system for managing and remotely connecting customer utility loads |
KR20030058755A (en) | 2001-12-31 | 2003-07-07 | 엘지산전 주식회사 | Remote control apparatus for circuit breaker |
US6810069B2 (en) * | 2002-07-12 | 2004-10-26 | Mcgraw-Edison Company | Electrical arc furnace protection system |
US7180717B2 (en) * | 2002-07-12 | 2007-02-20 | Cooper Technologies Company | Electrical network protection system |
US6744260B2 (en) | 2002-07-17 | 2004-06-01 | Eaton Corporation | Tester for a plurality of circuit breakers having a range of rated currents and multiple trip functions |
AU2003287223A1 (en) | 2002-10-24 | 2004-05-13 | Michael Johnson | Apparatus and method for simultaneously detecting the power state of a plurality of circuit breaker switches |
US7122916B2 (en) * | 2003-01-16 | 2006-10-17 | General Electric Company | Multi-unit power generation system for stand-alone and grid connected operation |
US20050047045A1 (en) | 2003-08-29 | 2005-03-03 | Puskar Michael P. | Circuit breaker and trip unit employing multiple function time selector switch |
US7262943B2 (en) * | 2003-09-15 | 2007-08-28 | General Electric Company | Configuration unit and methods for configuring centrally controlled power distribution systems |
US7203040B2 (en) * | 2004-03-31 | 2007-04-10 | Gaton Corporation | Method and circuit breaker for reducing arc flash during maintenance in a low voltage power circuit |
-
2005
- 2005-12-30 US US11/323,932 patent/US20070159746A1/en not_active Abandoned
-
2007
- 2007-12-26 US US12/005,245 patent/US7751165B2/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7254001B2 (en) * | 2002-02-25 | 2007-08-07 | General Electric Company | Circuit protection system |
US20070121265A1 (en) * | 2005-11-30 | 2007-05-31 | Hill Theodore D Iii | Method and system for controlling a power distribution system |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090262471A1 (en) * | 2008-04-18 | 2009-10-22 | Colorado Vnet Llc | Arc Fault Circuit Interrupter (AFCI) Support |
US20110063202A1 (en) * | 2009-09-11 | 2011-03-17 | General Electric Company | Reduced Energy Let Through Mode Indication and Delay in Switching Devices |
CN102024588A (en) * | 2009-09-11 | 2011-04-20 | 通用电气公司 | Reduced energy let through mode indication and delay in switching devices |
US8344994B2 (en) * | 2009-09-11 | 2013-01-01 | General Electric Company | Reduced energy let through mode indication and delay in switching devices |
EP2296245A3 (en) * | 2009-09-11 | 2015-08-05 | General Electric Company | Reduced energy let through mode indication and delay in switching devices |
CN101937032A (en) * | 2010-07-14 | 2011-01-05 | 江苏金智科技股份有限公司 | Method for implementing fault playback of wave recording file in relay protection device |
US8385035B2 (en) | 2010-07-16 | 2013-02-26 | General Electric Company | Protection system having reduced energy let-through mode and zone selectivity |
CN104318404A (en) * | 2014-11-19 | 2015-01-28 | 国网河南省电力公司濮阳供电公司 | Relay protection equipment standing book managing method and system |
Also Published As
Publication number | Publication date |
---|---|
US20080106838A1 (en) | 2008-05-08 |
US7751165B2 (en) | 2010-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7043340B2 (en) | Protection system for power distribution systems | |
US7751165B2 (en) | Centrally controlled protection systems having reduced energy let-through mode | |
US7012421B2 (en) | Energy calculation methods in power distribution systems | |
US7058482B2 (en) | Data sample and transmission modules for power distribution systems | |
US7986503B2 (en) | Circuit protection system | |
US7747354B2 (en) | Circuit protection system | |
US6847297B2 (en) | Locator devices and methods for centrally controlled power distribution systems | |
US20070002506A1 (en) | Circuit protection system | |
US20030212473A1 (en) | Processing system for a power distribution system | |
US7532955B2 (en) | Distributed protection system for power distribution systems | |
US7262943B2 (en) | Configuration unit and methods for configuring centrally controlled power distribution systems | |
EP0948111B1 (en) | Fault protection arrangements and methods for electric power distribution systems | |
EP0554553B1 (en) | Method of and system for disconnecting faulty distribution line section from power distribution line | |
CN101227081A (en) | Method for coordination study for protective devices with dynamic settings, multiple functions and multiple setting groups | |
JPH07250441A (en) | Distributing-line monitoring and controlling system and control method thereof | |
JPH03215119A (en) | Separation of faulty section of distribution line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: GENERAL ELECTRIC COMPANY, NEW YORK Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SIRIVELLA, ANAND S.V.;PAPALLO, THOMAS;LAVOIE, GREGORY P.;REEL/FRAME:018113/0546;SIGNING DATES FROM 20060411 TO 20060630 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |