Well drilling and production using a surface blowout preventer Download PDFInfo
- Publication number
- US20060191716A1 US20060191716A1 US11/404,143 US40414306A US2006191716A1 US 20060191716 A1 US20060191716 A1 US 20060191716A1 US 40414306 A US40414306 A US 40414306A US 2006191716 A1 US2006191716 A1 US 2006191716A1
- Authority
- US
- United States
- Prior art keywords
- blowout preventer
- rig
- drilling
- drill string
- rotating head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 50
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 18
- 239000012530 fluid Substances 0.000 claims abstract description 51
- 229930195733 hydrocarbon Natural products 0.000 claims abstract description 7
- 150000002430 hydrocarbons Chemical class 0.000 claims abstract description 7
- 238000000034 method Methods 0.000 claims description 24
- 238000002347 injection Methods 0.000 claims description 7
- 239000007924 injection Substances 0.000 claims description 7
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 229920001971 elastomer Polymers 0.000 abstract description 3
- 230000015572 biosynthetic process Effects 0.000 description 14
- 238000005755 formation reaction Methods 0.000 description 14
- 239000011148 porous material Substances 0.000 description 8
- 230000009977 dual effect Effects 0.000 description 6
- 239000011435 rock Substances 0.000 description 6
- 239000007789 gas Substances 0.000 description 4
- 238000005520 cutting process Methods 0.000 description 3
- 239000013535 sea water Substances 0.000 description 3
- 239000004215 Carbon black (E152) Substances 0.000 description 2
- 239000011324 bead Substances 0.000 description 2
- 239000011521 glass Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000004308 accommodation Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 239000000806 elastomer Substances 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
- E21B21/085—Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/002—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/001—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor specially adapted for underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
- E21B33/038—Connectors used on well heads, e.g. for connecting blow-out preventer and riser
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/08—Wipers; Oil savers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/08—Wipers; Oil savers
- E21B33/085—Rotatable packing means, e.g. rotating blow-out preventers
Definitions
- This invention relates generally to drilling of wells and production from wells.
- Drilling mud is pumped down the drill string to a drill bit and used to lubricate and cool the drill bit and remove drilled cuttings from the hole while it is being drilled.
- the viscous drilling mud carries the drilled cuttings upwardly on the outside and around the drill string.
- the density of the mud going downwardly to the drill bit and the mud passing upwardly from the drill bit is substantially the same. This has the benefit of reducing the likelihood of a so-called kick.
- the downward pressure of the drilling mud column is not sufficient to balance the pore pressure in the rocks being drilled, for example of gas or other fluid, which is encountered in a formation.
- the well may blowout (if an effective blowout preventer (BOP) is not fitted to the well) which is an extremely dangerous condition.
- BOP effective blowout preventer
- the aim is to deliberately create the situation described above. Namely, the density or equivalent circulating density of the upwardly returning mud is below the pore pressure of the rock being drilled, causing gas, oil, or water in the rock to enter the well-bore from the rock being drilled. This may also result in increased drilling rates but also the well to flow if the rock permeability and porosity allowed sufficient fluids to enter the well-bore.
- blowout preventers In this drilling environment it is general practice to provide a variety of blowout preventers to control any loss of control incidents or blowouts that may occur.
- a variety of techniques have been utilized for underbalanced or dual gradient drilling. Generally, they involve providing a density lowering component to the returning drilling mud. Gases, seawater, and glass beads have been injected into the returning mud flow to reduce its density.
- FIG. 1 is a schematic depiction of one embodiment of the present invention
- FIG. 2 is an enlarged schematic depiction of the subsea shut-off assembly shown in FIG. 1 in accordance with one embodiment of the present invention
- FIG. 3 is an enlarged, schematic, cross-sectional view of the spool 34 shown in FIG. 2 in accordance with one embodiment of the present invention
- FIG. 4 is a schematic cross-sectional view of the rotating head shown in FIG. 1 in accordance with one embodiment of the present invention
- FIG. 5 is a schematic depiction of another embodiment of the present invention.
- FIG. 6 is an enlarged, schematic depiction of a subsea shut-off valve shown in FIG. 5 in accordance with another embodiment of the present invention.
- FIG. 7 is an enlarged, schematic, cross-sectional view of the spool 34 shown in FIG. 6 in accordance with one embodiment of the present invention.
- FIG. 8 is a schematic cross-sectional view of the rotating head shown in FIG. 5 in accordance with another embodiment of the present invention.
- both drilling and production of fluids from a formation may occur in an underbalanced condition.
- underbalanced means that the weight of the drilling mud is less than the pore pressure of the formation.
- dual gradient refers to the fact that the density of fluid, at some point along its course, moving away from a drill bit, is lower than the density of the fluid moving towards the drill bit. Dual gradient techniques may be used to implement underbalanced drilling. The creation of a dual-gradient or underbalanced condition may be implemented using any known techniques, including the injection of gases, seawater, and glass beads, to mention a few examples.
- a drilling and production apparatus 11 may include a rotating head 10 which has a sealed bearing 65 and elastomer pack-off 62 that seals off around the drill string 40 while drilling operations take place.
- the return fluids are then diverted to a flow line below the pack-off 62 to a choke assembly 68 that controls the flow of the return fluid and hence the bottom hole pressure created by the mud column.
- the rotating head 10 rotates the string 40 through a surface blowout preventer (BOP) stack 12 .
- BOP surface blowout preventer
- the surface blowout preventer stack 12 may include annular blowout preventers that control the flow of fluid moving upwardly from the wellhead to the overlying apparatus 11 .
- the apparatus 11 may be tensioned using ring tensioners 16 , coupled by a pulleys 54 to hydraulic cylinders 56 to create a tensioning system 50 .
- the pulleys 54 may be connected to the apparatus 11 , be it a rig or ship, so that the tensioners can maintain tension on the riser even when the apparatus is heaving up and down.
- the tensioning system 50 allows the upper portion of the apparatus 11 to move relative to the lower portion, for example in response to sea conditions.
- the system 50 allows this relative movement and adjustment of relative positioning while maintaining tension on the casing 22 , which extends from a riser tension ring 14 downwardly to a subsea shutoff assembly 24 .
- the tension ring 14 takes the weight of the surface blowout preventer 12 and holds the tension on the casing riser 22 .
- the surface portion of the apparatus 11 is coupled by a connector 20 to the casing riser 22 .
- the casing riser 22 is connected to the lower section of the apparatus 11 via a disconnectable latch 72 located below the sea level WL.
- the latch 72 may be hydraulically operated from the surface to disconnect the upper portion of the apparatus 11 from the lower portion including the subsea shutoff assembly 24 .
- the lower density fluid may be provided through the tubing 60 .
- a hanger system includes a tensioner 58 that rests on a support 56 .
- the hanger system tensions the tensioned tubing 26 that extends all the way down to a disconnectable subsea latch 74 above the subsea shutoff assembly 24 .
- the latch 74 may be remotely or surface operated to sever and seal the tubing 26 from the subsea shutoff assembly 24 prior to disconnecting the riser at latches 72 and 74 .
- the support 56 may include hydraulic ram devices that move like shear ram blowout preventers to grip the tubing 26 .
- the rate of lower density fluid flow through the tubing 26 from the surface may be controlled from the surface by remotely controllable valving in the subsea shutoff assembly 24 , in one embodiment. It is advantageous to provide this lower density fluid from the surface as opposed to attempting to provide it from a subsea location, such as within the subsea shutoff assembly 24 , because it is much easier to control and operate large pumps from the apparatus 11 .
- the subsea shutoff assembly 24 operates with the surface blowout preventer stack 12 to prevent blowouts. While the surface blowout preventer stack 12 controls fluid flow, the subsea shutoff assembly 24 is responsible for cutting off or severing the wellhead from the portions of the apparatus 11 thereabove, using shear rams 30 a and 30 b as shown in FIG. 2 .
- the casing 22 may be coupled by connector 28 a to the shear ram 30 a .
- the shear ram 30 a is coupled by a spool 34 with flanges 32 a and 32 b to the shear ram 30 b .
- the shear ram 30 b may be coupled through the flange 38 to a wellhead connector 28 b , in turn connected to the wellhead.
- the tubing 26 connects to a remotely controlled valve 36 that controls the rate of lower density fluid flow through the tubing 26 to the interior of the spool 34 .
- the inlet from the tubing 26 to the spool 34 is between the two shear rams 30 a and 30 b.
- the injection of lower density fluid makes use of the remotely controlled valve 36 on a spool 34 .
- the spool 34 may have drilling mud, indicated as MIN, moving downwardly through the casing 22 .
- the returning mud indicated as M OUT , extends upwardly in the annulus 46 surrounding the string 40 and annulus 44 .
- lower density fluid may be injected, when the valve 36 is opened, into the returning mud/hydrocarbon flow to lower its density.
- An underbalanced situation may be created as a result of the dual densities of mud in one embodiment.
- mud above the valve 36 may be at a lower density than the density of the mud below the valve 36 , as well as the density of the mud moving downwardly to the formation.
- the valve 36 may include a rotating element 37 that allows the valve 36 to be opened or controlled.
- the valve 36 may be a pivoted gate valve with a hydraulic fail safe that automatically closes the valve in the event of a loss of hydraulics.
- the valve 36 may enable the extent of underbalanced drilling to be surface or remotely controlled depending on sensed conditions, including the upward pressure supplied by the formation. For example, the valve 36 may be controlled acoustically from the surface.
- flow control may be done most effectively at the surface, whereas shutoff control is done on the seafloor bed.
- the pumping of the lower density fluid is also done on the surface, but its injection may be done at the subsea shutoff assembly 24 , in one embodiment between the shear rams 30 a and 30 b.
- the rotating head 10 shown in more detail in FIG. 4 , is coupled to the surface blowout preventer stack 12 at a joint 70 .
- Returning fluid, indicated as M OUT is passed through a valve 68 to an appropriate collection area.
- the collection area may collect both mud with entrained debris, as well as production fluids such as hydrocarbons.
- the production fluids may be separated using well known techniques.
- the upward flow of the fluid M OUT is constrained by a pack off 62 .
- the pack off 62 is a rubber or resilient ring that seals the annulus around the string 40 and prevents the further upward flow of the fluids.
- the pack off 62 enables the application of a rotating force in the direction of the circular arrow from the rotating head 66 to the string 40 for purposes of drilling.
- Sealed bearing 65 may be provided between a telescoping joint 64 and the rotating head 66 as both drilling and production may be accomplished in an underbalanced situation.
- a subsea shutoff assembly 24 may be provided to cut off the string in the event of a failure, such as a blowout.
- surface annular blowout preventers control fluid flow.
- Dual gradient drilling may be achieved through the provision of fluid from the surface through a side inlet into the region between the upper and lower ram type shear blowout preventers 30 .
- the tubing 26 for providing the density control fluid may be both tensioned and latched. As a result, dual gradient production and drilling may be achieved in some embodiments of the present invention.
- lower density drilling mud may be injected at an appropriate time. Namely, instead of simply supplying the density lowering fluid on a continuous basis, at the point when production is ready to begin, lower density drilling fluid is pumped downwardly through the top device 76 and the drill string 40 .
- a density lowering fluid lowers the density of the drilling mud moving downwardly into the drill hole towards the drill bit.
- the lower density drilling mud is pumped to the drill bit and then moves upwardly through the drill pipe open hole casing annulus or spool 34 ( FIG. 7 ).
- the drill bit may include at least one one-way check valve.
- the spool 34 need have no accommodation for the injection of density lowering fluid as in the previous embodiment. Instead, the fluid M in2 is already of lowered density when production begins and the fluid reaches the spool 34 . Thus, in some embodiments, prior to the inception of production, the well may be operating in a balanced or overbalanced condition. Upon production, the density of the drilling mud may be reduced by lower density drilling mud through the top drive.
- the upward flow of fluid is of reduced density for two reasons. It contains the density lowering fluid that was pumped downwardly through the drill string 40 . Secondly, it includes the flowing hydrocarbons or fluids which further lower the density of the drilling mud.
- the fluid moving upwardly is of a density lower than the density of the downwardly moving fluid M in2 .
- both M in2 and M out2 are of lower density than the previously pumped drilling mud which was unaccompanied by density lowering fluid added through the top drive 76 .
- the outward flow of drilling fluid may pass outwardly through a choke 78 .
- the choke 78 also shown in FIG. 5 , is positioned between the rotating head 10 and the surface blowout preventer stack 12 to maintain control.
- the choke 78 back pressure controls the egress of the drilling mud to control well pressure and inflow from the wellbore.
- the drill string 40 will have two non-return valves installed above in the drill bit at the bottom of the drill string 40 . These valves will reduce the probability of uncontrolled flow inside the drill string 40 .
- the fluid pressure in the bottom of the hole may be lower than the pore pressure of the surrounding formation.
- managed pressure drilling may be used instead of overbalanced or underbalanced drilling.
- the pressure of the drilling mud exactly balances the pore pressure in the formation. In such case the drilling mud pumped downwardly into the formation exactly matches the formation pore pressure.
- the pressure within the spool 34 and through the drill string 40 may be managed by the choke 78 in some embodiments.
- the pressure within the spool 34 and the remainder of the string 40 may be controlled. In other words, slowing the egress of fluids increases the pressure and opening the choke decreases the pressure.
- the choke 78 may be utilized in conjunction with the valve 76 to control the pressure within the system.
- the pressure may be controlled to set a drilling mud pressure which precisely balances the pore pressure, achieving managed pressure drilling.
- a flex joint and telescopic joint may be used to connect the surface blowout preventer stack 12 to the valve 76 in other components.
Abstract
Production and drilling may be achieved by a system which uses a rotating head coupled to surface blowout preventer stack for fluid flow control. A casing connects these surface components to a subsea shutoff assembly with a pair of ram shear devices to cut off the string to the wellhead. Both the casing and an alternate line may be latched so that they may be released if necessary. The rotating head may include a rubber packer to prevent upward flow of drilling fluid and production hydrocarbons and, at the same time, provide rotation to the drill string. Managed pressure drilling or under balanced drilling may be used in some embodiments.
Description
- This application is a continuation-in-part of U.S. patent application Ser. No. 10/697,204, filed on Oct. 30, 2003.
- This invention relates generally to drilling of wells and production from wells.
- Generally, wells are drilled in a slightly over-balanced condition where the weight of the drilling fluid used is only slightly over the pore pressure of the rocks being drilled.
- Drilling mud is pumped down the drill string to a drill bit and used to lubricate and cool the drill bit and remove drilled cuttings from the hole while it is being drilled. The viscous drilling mud carries the drilled cuttings upwardly on the outside and around the drill string.
- In a balanced situation, the density of the mud going downwardly to the drill bit and the mud passing upwardly from the drill bit is substantially the same. This has the benefit of reducing the likelihood of a so-called kick. In a kick situation, the downward pressure of the drilling mud column is not sufficient to balance the pore pressure in the rocks being drilled, for example of gas or other fluid, which is encountered in a formation. As a result, the well may blowout (if an effective blowout preventer (BOP) is not fitted to the well) which is an extremely dangerous condition.
- In underbalanced drilling, the aim is to deliberately create the situation described above. Namely, the density or equivalent circulating density of the upwardly returning mud is below the pore pressure of the rock being drilled, causing gas, oil, or water in the rock to enter the well-bore from the rock being drilled. This may also result in increased drilling rates but also the well to flow if the rock permeability and porosity allowed sufficient fluids to enter the well-bore.
- In this drilling environment it is general practice to provide a variety of blowout preventers to control any loss of control incidents or blowouts that may occur.
- A variety of techniques have been utilized for underbalanced or dual gradient drilling. Generally, they involve providing a density lowering component to the returning drilling mud. Gases, seawater, and glass beads have been injected into the returning mud flow to reduce its density.
- In deep subsea applications, a number of problems may arise. Because of the pressures involved, everything becomes significantly more complicated. The pressure that bears down on the formation includes the weight of the drilling mud, whereas the pressure in the shallow formations is dictated by the weight of seawater above the formation. Because of the higher pressures involved, the drilling mud may actually be injected into the formation, fracture it and may even clog or otherwise foul the formation itself, severely impairing potential hydrocarbon production.
-
FIG. 1 is a schematic depiction of one embodiment of the present invention; -
FIG. 2 is an enlarged schematic depiction of the subsea shut-off assembly shown inFIG. 1 in accordance with one embodiment of the present invention; -
FIG. 3 is an enlarged, schematic, cross-sectional view of thespool 34 shown inFIG. 2 in accordance with one embodiment of the present invention; -
FIG. 4 is a schematic cross-sectional view of the rotating head shown inFIG. 1 in accordance with one embodiment of the present invention; -
FIG. 5 is a schematic depiction of another embodiment of the present invention; -
FIG. 6 is an enlarged, schematic depiction of a subsea shut-off valve shown inFIG. 5 in accordance with another embodiment of the present invention; -
FIG. 7 is an enlarged, schematic, cross-sectional view of thespool 34 shown inFIG. 6 in accordance with one embodiment of the present invention; and -
FIG. 8 is a schematic cross-sectional view of the rotating head shown inFIG. 5 in accordance with another embodiment of the present invention. - In some embodiments of the present invention, both drilling and production of fluids from a formation may occur in an underbalanced condition. As used herein, “underbalanced” means that the weight of the drilling mud is less than the pore pressure of the formation. As used herein, “dual gradient” refers to the fact that the density of fluid, at some point along its course, moving away from a drill bit, is lower than the density of the fluid moving towards the drill bit. Dual gradient techniques may be used to implement underbalanced drilling. The creation of a dual-gradient or underbalanced condition may be implemented using any known techniques, including the injection of gases, seawater, and glass beads, to mention a few examples.
- Referring to
FIGS. 1 and 4 , a drilling andproduction apparatus 11 may include a rotatinghead 10 which has a sealed bearing 65 and elastomer pack-off 62 that seals off around thedrill string 40 while drilling operations take place. The return fluids are then diverted to a flow line below the pack-off 62 to achoke assembly 68 that controls the flow of the return fluid and hence the bottom hole pressure created by the mud column. The rotatinghead 10 rotates thestring 40 through a surface blowout preventer (BOP)stack 12. The surfaceblowout preventer stack 12 may include annular blowout preventers that control the flow of fluid moving upwardly from the wellhead to theoverlying apparatus 11. - The
apparatus 11 may be tensioned usingring tensioners 16, coupled by apulleys 54 tohydraulic cylinders 56 to create atensioning system 50. Thepulleys 54 may be connected to theapparatus 11, be it a rig or ship, so that the tensioners can maintain tension on the riser even when the apparatus is heaving up and down. Thetensioning system 50 allows the upper portion of theapparatus 11 to move relative to the lower portion, for example in response to sea conditions. Thesystem 50 allows this relative movement and adjustment of relative positioning while maintaining tension on thecasing 22, which extends from ariser tension ring 14 downwardly to asubsea shutoff assembly 24. Thetension ring 14 takes the weight of thesurface blowout preventer 12 and holds the tension on thecasing riser 22. - The surface portion of the
apparatus 11 is coupled by aconnector 20 to thecasing riser 22. Thecasing riser 22 is connected to the lower section of theapparatus 11 via adisconnectable latch 72 located below the sea level WL. Thelatch 72 may be hydraulically operated from the surface to disconnect the upper portion of theapparatus 11 from the lower portion including thesubsea shutoff assembly 24. - Also provided on the
ring 14 is a source of fluid that is of a lower density than the density of mud pumped downwardly through thecasing riser 22 from the surface in one embodiment of the present invention. The lower density fluid may be provided through thetubing 60. - A hanger system includes a
tensioner 58 that rests on asupport 56. The hanger system tensions thetensioned tubing 26 that extends all the way down to adisconnectable subsea latch 74 above thesubsea shutoff assembly 24. Like thelatch 72, thelatch 74 may be remotely or surface operated to sever and seal thetubing 26 from thesubsea shutoff assembly 24 prior to disconnecting the riser atlatches support 56 may include hydraulic ram devices that move like shear ram blowout preventers to grip thetubing 26. - The rate of lower density fluid flow through the
tubing 26 from the surface may be controlled from the surface by remotely controllable valving in thesubsea shutoff assembly 24, in one embodiment. It is advantageous to provide this lower density fluid from the surface as opposed to attempting to provide it from a subsea location, such as within thesubsea shutoff assembly 24, because it is much easier to control and operate large pumps from theapparatus 11. - The
subsea shutoff assembly 24 operates with the surfaceblowout preventer stack 12 to prevent blowouts. While the surface blowout preventer stack 12 controls fluid flow, thesubsea shutoff assembly 24 is responsible for cutting off or severing the wellhead from the portions of theapparatus 11 thereabove, usingshear rams FIG. 2 . Thus, thecasing 22 may be coupled byconnector 28 a to theshear ram 30 a. Theshear ram 30 a is coupled by aspool 34 withflanges shear ram 30 b. Theshear ram 30 b may be coupled through theflange 38 to awellhead connector 28 b, in turn connected to the wellhead. - As shown in
FIG. 2 , thetubing 26 connects to a remotely controlledvalve 36 that controls the rate of lower density fluid flow through thetubing 26 to the interior of thespool 34. The inlet from thetubing 26 to thespool 34 is between the twoshear rams - The injection of lower density fluid, as shown in
FIG. 3 , makes use of the remotely controlledvalve 36 on aspool 34. Thespool 34 may have drilling mud, indicated as MIN, moving downwardly through thecasing 22. The returning mud, indicated as MOUT, extends upwardly in theannulus 46 surrounding thestring 40 andannulus 44. Thus, lower density fluid may be injected, when thevalve 36 is opened, into the returning mud/hydrocarbon flow to lower its density. - An underbalanced situation may be created as a result of the dual densities of mud in one embodiment. Namely, mud above the
valve 36 may be at a lower density than the density of the mud below thevalve 36, as well as the density of the mud moving downwardly to the formation. Thevalve 36 may include arotating element 37 that allows thevalve 36 to be opened or controlled. As an additional example, thevalve 36 may be a pivoted gate valve with a hydraulic fail safe that automatically closes the valve in the event of a loss of hydraulics. Thevalve 36 may enable the extent of underbalanced drilling to be surface or remotely controlled depending on sensed conditions, including the upward pressure supplied by the formation. For example, thevalve 36 may be controlled acoustically from the surface. - Thus, in some embodiments of the present invention, flow control may be done most effectively at the surface, whereas shutoff control is done on the seafloor bed. The pumping of the lower density fluid is also done on the surface, but its injection may be done at the
subsea shutoff assembly 24, in one embodiment between the shear rams 30 a and 30 b. - The rotating
head 10, shown in more detail inFIG. 4 , is coupled to the surfaceblowout preventer stack 12 at a joint 70. Returning fluid, indicated as MOUT, is passed through avalve 68 to an appropriate collection area. The collection area may collect both mud with entrained debris, as well as production fluids such as hydrocarbons. The production fluids may be separated using well known techniques. - The upward flow of the fluid MOUT is constrained by a pack off 62. In one embodiment, the pack off 62 is a rubber or resilient ring that seals the annulus around the
string 40 and prevents the further upward flow of the fluids. At the same time, the pack off 62 enables the application of a rotating force in the direction of the circular arrow from the rotatinghead 66 to thestring 40 for purposes of drilling. Sealed bearing 65 may be provided between a telescoping joint 64 and the rotatinghead 66 as both drilling and production may be accomplished in an underbalanced situation. - Thus, in some embodiments of the present invention, a
subsea shutoff assembly 24 may be provided to cut off the string in the event of a failure, such as a blowout. At the same time, surface annular blowout preventers control fluid flow. Dual gradient drilling may be achieved through the provision of fluid from the surface through a side inlet into the region between the upper and lower ram type shear blowout preventers 30. Through the provision of theseparate tubing 26 with a remotelyoperable latch 74, appropriate volumes of fluid can be achieved that would not be available with conventional kill and choke lines. Thetubing 26 for providing the density control fluid may be both tensioned and latched. As a result, dual gradient production and drilling may be achieved in some embodiments of the present invention. - Referring to
FIG. 5 , in accordance with another embodiment of the present invention, lower density drilling mud may be injected at an appropriate time. Namely, instead of simply supplying the density lowering fluid on a continuous basis, at the point when production is ready to begin, lower density drilling fluid is pumped downwardly through thetop device 76 and thedrill string 40. - A density lowering fluid lowers the density of the drilling mud moving downwardly into the drill hole towards the drill bit. The lower density drilling mud is pumped to the drill bit and then moves upwardly through the drill pipe open hole casing annulus or spool 34 (
FIG. 7 ). The drill bit may include at least one one-way check valve. - Thus, referring to
FIGS. 5 and 6 , there is no need for any down hole injection of density lowering fluid since that fluid is pumped down thedrill string 40. - Similarly, referring to
FIG. 7 , thespool 34 need have no accommodation for the injection of density lowering fluid as in the previous embodiment. Instead, the fluid Min2 is already of lowered density when production begins and the fluid reaches thespool 34. Thus, in some embodiments, prior to the inception of production, the well may be operating in a balanced or overbalanced condition. Upon production, the density of the drilling mud may be reduced by lower density drilling mud through the top drive. - Finally, referring to
FIG. 8 , the upward flow of fluid, first shown inFIG. 7 and indicated as Mout2 is of reduced density for two reasons. It contains the density lowering fluid that was pumped downwardly through thedrill string 40. Secondly, it includes the flowing hydrocarbons or fluids which further lower the density of the drilling mud. - Therefore, the fluid moving upwardly, indicated as Mout2 is of a density lower than the density of the downwardly moving fluid Min2. Moreover, both Min2 and Mout2 are of lower density than the previously pumped drilling mud which was unaccompanied by density lowering fluid added through the
top drive 76. - The outward flow of drilling fluid, indicated as Mout in
FIG. 8 , may pass outwardly through achoke 78. Thechoke 78, also shown inFIG. 5 , is positioned between the rotatinghead 10 and the surfaceblowout preventer stack 12 to maintain control. Thechoke 78 back pressure controls the egress of the drilling mud to control well pressure and inflow from the wellbore. - In addition, in some embodiments, the
drill string 40 will have two non-return valves installed above in the drill bit at the bottom of thedrill string 40. These valves will reduce the probability of uncontrolled flow inside thedrill string 40. - Thus, the fluid pressure in the bottom of the hole may be lower than the pore pressure of the surrounding formation. As a result, an underbalanced drilling situation is established when production begins.
- In accordance with still another embodiment, managed pressure drilling (MPD) may be used instead of overbalanced or underbalanced drilling. In managed pressure drilling, the pressure of the drilling mud exactly balances the pore pressure in the formation. In such case the drilling mud pumped downwardly into the formation exactly matches the formation pore pressure.
- The pressure within the
spool 34 and through thedrill string 40 may be managed by thechoke 78 in some embodiments. By controlling the rate of egress of fluids indicated as Mout, the pressure within thespool 34 and the remainder of thestring 40 may be controlled. In other words, slowing the egress of fluids increases the pressure and opening the choke decreases the pressure. In this way, thechoke 78 may be utilized in conjunction with thevalve 76 to control the pressure within the system. In one embodiment, the pressure may be controlled to set a drilling mud pressure which precisely balances the pore pressure, achieving managed pressure drilling. - In some embodiments, a flex joint and telescopic joint may be used to connect the surface
blowout preventer stack 12 to thevalve 76 in other components. - While the present invention has been described with respect to a limited number of embodiments, those skilled in the art will appreciate numerous modifications and variations therefrom. It is intended that the appended claims cover all such modifications and variations as fall within the true spirit and scope of this present invention.
Claims (29)
1. A method comprising:
producing hydrocarbons from a subsea well using a rotating head mounted on a surface blowout preventer and injecting a density lowering fluid through the drill string and the surface blowout preventer.
2. The method of claim 1 including using the surface blowout preventer to provide surface flow control.
3. The method of claim 2 including providing a subsea shutoff assembly in addition to said surface blowout preventer.
4. The method of claim 3 including providing shear and emergency disconnect capability in the event the well control is lost.
5. The method of claim 1 including coupling said surface blowout preventer to a wellhead using a connector and providing a remotely operable subsurface latch to sever the connection between said wellhead and said surface blowout preventers.
6. The method of claim 5 including tensioning said casing.
7. The method of claim 5 including providing a flow of mud through a casing to a drill bit.
8. The method of claim 7 including lowering the density of mud by beginning the injection of said density lowering fluid when production begins.
9. The method of claim 1 including providing a rotating head that transfers rotational energy to said drill string through a packer.
10. The method of claim 9 including providing said rotational energy through a resilient packer.
11. The method of claim 1 including drilling under-balanced.
12. The method of claim 1 including using managed pressure drilling.
13. A drilling rig comprising:
a rotating head;
a drill string coupled to said rotating head;
a surface blowout preventer mounted under said rotating head on said rig; and
an apparatus to pump lower density drilling mud to the bottom of a hole through said drill string and drill bit.
14. The rig of claim 13 including a connector coupled from said surface blowout preventer to a subsea shutoff assembly.
15. The rig of claim 14 wherein said subsea shutoff assembly includes a pair of shear blowout preventers.
16. The rig of claim 15 including a remotely operable latch to disconnect a connector from said subsea shutoff assembly in the event of an emergency.
17. The rig of claim 16 wherein said connector is tensioned.
18. The rig of claim 17 wherein said subsea shutoff assembly includes a pair of shear ram subsurface blowout preventers and said connector on top of said pair of shear ram subsurface blowout preventers.
19. The rig of claim 13 including a riser coupled to said surface blowout preventer.
20. The rig of claim 19 including a choke coupled to said surface blowout preventer to control the pressure in said riser.
21. The rig of claim 13 wherein said rotating head includes a resilient packer and a drill string and tubing, said resilient packer to seal the region between said drill string and said tubing and to transfer rotational energy from said tubing to said drill string.
22. A method comprising:
operating a subsea wellhead in an underbalanced or balanced condition;
providing mud at a first density to said wellhead; and
injecting, from the sea surface, a first density lowering fluid, into mud returning from said wellhead, through a drill string.
23. The method of claim 22 including producing hydrocarbons from a subsea well in an underbalanced condition using a rotating head mounted on a surface blowout preventer.
24. The method of claim 23 including using the surface blowout preventer to provide surface flow control.
25. The method of claim 24 including providing a subsurface blowout preventer in addition to said surface blowout preventer.
26. The method of claim 25 including providing subsurface shear blowout preventers.
27. The method of claim 23 including providing a rotating head that transfers rotational energy to said drill string through a packer.
28. The method of claim 27 including providing said rotational energy through a resilient packer.
29. The method of claim 28 including operating a valve to begin the injection of the first density lowering fluid when production is ready to begin.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/404,143 US20060191716A1 (en) | 2003-10-30 | 2006-04-13 | Well drilling and production using a surface blowout preventer |
US12/553,208 US8176985B2 (en) | 2003-10-30 | 2009-09-03 | Well drilling and production using a surface blowout preventer |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/697,204 US7032691B2 (en) | 2003-10-30 | 2003-10-30 | Underbalanced well drilling and production |
US11/404,143 US20060191716A1 (en) | 2003-10-30 | 2006-04-13 | Well drilling and production using a surface blowout preventer |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/697,204 Continuation-In-Part US7032691B2 (en) | 2003-10-30 | 2003-10-30 | Underbalanced well drilling and production |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/553,208 Division US8176985B2 (en) | 2003-10-30 | 2009-09-03 | Well drilling and production using a surface blowout preventer |
Publications (1)
Publication Number | Publication Date |
---|---|
US20060191716A1 true US20060191716A1 (en) | 2006-08-31 |
Family
ID=34550303
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/697,204 Active 2024-07-26 US7032691B2 (en) | 2003-10-30 | 2003-10-30 | Underbalanced well drilling and production |
US11/404,143 Abandoned US20060191716A1 (en) | 2003-10-30 | 2006-04-13 | Well drilling and production using a surface blowout preventer |
US12/553,208 Expired - Lifetime US8176985B2 (en) | 2003-10-30 | 2009-09-03 | Well drilling and production using a surface blowout preventer |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/697,204 Active 2024-07-26 US7032691B2 (en) | 2003-10-30 | 2003-10-30 | Underbalanced well drilling and production |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/553,208 Expired - Lifetime US8176985B2 (en) | 2003-10-30 | 2009-09-03 | Well drilling and production using a surface blowout preventer |
Country Status (10)
Country | Link |
---|---|
US (3) | US7032691B2 (en) |
EP (3) | EP1808569B1 (en) |
AU (1) | AU2004286103B2 (en) |
BR (1) | BRPI0416064A (en) |
DK (3) | DK1808569T3 (en) |
EG (1) | EG24344A (en) |
ES (3) | ES2349789T3 (en) |
NO (2) | NO338633B1 (en) |
TN (1) | TNSN06119A1 (en) |
WO (1) | WO2005042917A1 (en) |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070284113A1 (en) * | 2004-04-16 | 2007-12-13 | Vetco Gray Scandinavia As | System And Method For Rigging Up Well Workover Equipment |
US20100018715A1 (en) * | 2006-11-07 | 2010-01-28 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US7836946B2 (en) | 2002-10-31 | 2010-11-23 | Weatherford/Lamb, Inc. | Rotating control head radial seal protection and leak detection systems |
US7926593B2 (en) | 2004-11-23 | 2011-04-19 | Weatherford/Lamb, Inc. | Rotating control device docking station |
US20110139509A1 (en) * | 2009-12-15 | 2011-06-16 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US7997345B2 (en) | 2007-10-19 | 2011-08-16 | Weatherford/Lamb, Inc. | Universal marine diverter converter |
US20110290495A1 (en) * | 2010-05-28 | 2011-12-01 | Smith David R | Method and apparatus to conrol fluid flow from subsea wells |
US8201628B2 (en) | 2010-04-27 | 2012-06-19 | Halliburton Energy Services, Inc. | Wellbore pressure control with segregated fluid columns |
US8286734B2 (en) | 2007-10-23 | 2012-10-16 | Weatherford/Lamb, Inc. | Low profile rotating control device |
US8322432B2 (en) | 2009-01-15 | 2012-12-04 | Weatherford/Lamb, Inc. | Subsea internal riser rotating control device system and method |
US8347983B2 (en) | 2009-07-31 | 2013-01-08 | Weatherford/Lamb, Inc. | Drilling with a high pressure rotating control device |
US8347982B2 (en) | 2010-04-16 | 2013-01-08 | Weatherford/Lamb, Inc. | System and method for managing heave pressure from a floating rig |
US8820405B2 (en) | 2010-04-27 | 2014-09-02 | Halliburton Energy Services, Inc. | Segregating flowable materials in a well |
US8826988B2 (en) | 2004-11-23 | 2014-09-09 | Weatherford/Lamb, Inc. | Latch position indicator system and method |
US8833488B2 (en) | 2011-04-08 | 2014-09-16 | Halliburton Energy Services, Inc. | Automatic standpipe pressure control in drilling |
US8844652B2 (en) | 2007-10-23 | 2014-09-30 | Weatherford/Lamb, Inc. | Interlocking low profile rotating control device |
US8881829B2 (en) * | 2010-10-07 | 2014-11-11 | David B. Redden | Backup wellhead blowout prevention system and method |
US20140360731A1 (en) * | 2011-11-10 | 2014-12-11 | Cameron International Corporation | Blowout Preventer Shut-In Assembly of Last Resort |
US20150083429A1 (en) * | 2012-04-27 | 2015-03-26 | Smith International, Inc. | Wellbore annular pressure control system and method using gas lift in drilling fluid return line |
US9080407B2 (en) | 2011-05-09 | 2015-07-14 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US9175542B2 (en) | 2010-06-28 | 2015-11-03 | Weatherford/Lamb, Inc. | Lubricating seal for use with a tubular |
US9249637B2 (en) * | 2012-10-15 | 2016-02-02 | National Oilwell Varco, L.P. | Dual gradient drilling system |
US9249638B2 (en) | 2011-04-08 | 2016-02-02 | Halliburton Energy Services, Inc. | Wellbore pressure control with optimized pressure drilling |
US9359853B2 (en) | 2009-01-15 | 2016-06-07 | Weatherford Technology Holdings, Llc | Acoustically controlled subsea latching and sealing system and method for an oilfield device |
US20160230492A1 (en) * | 2013-03-15 | 2016-08-11 | Cameron International Corporation | Riser gas handling system |
US9605507B2 (en) | 2011-09-08 | 2017-03-28 | Halliburton Energy Services, Inc. | High temperature drilling with lower temperature rated tools |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7487837B2 (en) * | 2004-11-23 | 2009-02-10 | Weatherford/Lamb, Inc. | Riser rotating control device |
US7237623B2 (en) * | 2003-09-19 | 2007-07-03 | Weatherford/Lamb, Inc. | Method for pressurized mud cap and reverse circulation drilling from a floating drilling rig using a sealed marine riser |
US7032691B2 (en) * | 2003-10-30 | 2006-04-25 | Stena Drilling Ltd. | Underbalanced well drilling and production |
EP2813664B1 (en) * | 2005-10-20 | 2018-08-22 | Transocean Sedco Forex Ventures Ltd. | Apparatus and method for managed pressure drilling |
US8459361B2 (en) * | 2007-04-11 | 2013-06-11 | Halliburton Energy Services, Inc. | Multipart sliding joint for floating rig |
US9567843B2 (en) * | 2009-07-30 | 2017-02-14 | Halliburton Energy Services, Inc. | Well drilling methods with event detection |
US8471560B2 (en) * | 2009-09-18 | 2013-06-25 | Schlumberger Technology Corporation | Measurements in non-invaded formations |
CA2782168A1 (en) * | 2009-12-02 | 2011-06-09 | Stena Drilling Limited | Assembly and method for subsea well drilling and intervention |
US8403059B2 (en) * | 2010-05-12 | 2013-03-26 | Sunstone Technologies, Llc | External jet pump for dual gradient drilling |
US20120006559A1 (en) * | 2010-07-09 | 2012-01-12 | Brite Alan D | Submergible oil well sealing device with valves and method for installing a submergible oil well sealing device and resuming oil production |
GB2482181B (en) * | 2010-07-23 | 2015-07-29 | Peter Robert Goodall | Preventing and ameliorating leakage from a subsea well in the event of failure |
US20120045285A1 (en) * | 2010-08-23 | 2012-02-23 | Oil Well Closure And Protection As | Offshore structure |
US8783359B2 (en) | 2010-10-05 | 2014-07-22 | Chevron U.S.A. Inc. | Apparatus and system for processing solids in subsea drilling or excavation |
US8746345B2 (en) * | 2010-12-09 | 2014-06-10 | Cameron International Corporation | BOP stack with a universal intervention interface |
US8820412B2 (en) * | 2011-09-16 | 2014-09-02 | Chevron U.S.A. Inc. | Methods, systems and apparatus for circulating fluid within the annulus of a flexible pipe riser |
US9328575B2 (en) * | 2012-01-31 | 2016-05-03 | Weatherford Technology Holdings, Llc | Dual gradient managed pressure drilling |
BR112014020207A8 (en) | 2012-02-14 | 2017-07-11 | Chevron Usa Inc | SYSTEMS AND METHODS FOR PRESSURE MANAGEMENT IN A WELLHOLE |
US9140080B2 (en) * | 2012-06-21 | 2015-09-22 | Superior Energy Services—North America Services, Inc. | Transportable single operator rig apparatus and method for optimizing drilling and/or completion |
MX2016005483A (en) * | 2013-11-27 | 2016-07-26 | Landmark Graphics Corp | Method and apparatus for optimized underbalanced drilling. |
GB201501477D0 (en) * | 2015-01-29 | 2015-03-18 | Norwegian Univ Sci & Tech Ntnu | Drill apparatus for a floating drill rig |
US10087716B2 (en) * | 2015-02-13 | 2018-10-02 | Conocophillips Company | Method and apparatus for filling an annulus between casing and rock in an oil or gas well |
GB2555313A (en) * | 2015-07-13 | 2018-04-25 | Landmark Graphics Corp | Underbalanced drilling through formations with varying lithologies |
US11208862B2 (en) * | 2017-05-30 | 2021-12-28 | Trendsetter Vulcan Offshore, Inc. | Method of drilling and completing a well |
CN108180012A (en) * | 2017-12-21 | 2018-06-19 | 黄明道 | Deepwater drilling platform IBOP valves and preventer joint pressure test tool and pressure-measuring method |
CA3123190C (en) * | 2019-01-18 | 2023-08-01 | Halliburton Energy Services, Inc. | Pressure switch |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3324017A (en) * | 1958-06-12 | 1967-06-06 | Sinclair Research Inc | Method for copolymerizing an alkylidene bisacrylamide and an ethylenic monomer employing radiation |
US5014789A (en) * | 1986-07-07 | 1991-05-14 | Neville Clarke | Method for startup of production in an oil well |
US5662181A (en) * | 1992-09-30 | 1997-09-02 | Williams; John R. | Rotating blowout preventer |
US5848656A (en) * | 1995-04-27 | 1998-12-15 | Moeksvold; Harald | Device for controlling underwater pressure |
US5873420A (en) * | 1997-05-27 | 1999-02-23 | Gearhart; Marvin | Air and mud control system for underbalanced drilling |
US6263982B1 (en) * | 1998-03-02 | 2001-07-24 | Weatherford Holding U.S., Inc. | Method and system for return of drilling fluid from a sealed marine riser to a floating drilling rig while drilling |
US6273193B1 (en) * | 1997-12-16 | 2001-08-14 | Transocean Sedco Forex, Inc. | Dynamically positioned, concentric riser, drilling method and apparatus |
US6325159B1 (en) * | 1998-03-27 | 2001-12-04 | Hydril Company | Offshore drilling system |
US20030070840A1 (en) * | 2001-02-15 | 2003-04-17 | Boer Luc De | Method and apparatus for varying the density of drilling fluids in deep water oil drilling applications |
US20030127230A1 (en) * | 2001-12-03 | 2003-07-10 | Von Eberstein, William Henry | Method for formation pressure control while drilling |
US6672390B2 (en) * | 2001-06-15 | 2004-01-06 | Shell Oil Company | Systems and methods for constructing subsea production wells |
US6913092B2 (en) * | 1998-03-02 | 2005-07-05 | Weatherford/Lamb, Inc. | Method and system for return of drilling fluid from a sealed marine riser to a floating drilling rig while drilling |
US20060021755A1 (en) * | 2004-07-28 | 2006-02-02 | Amin Radi | Underbalanced marine drilling riser |
US7021402B2 (en) * | 2003-12-15 | 2006-04-04 | Itrec B.V. | Method for using a multipurpose unit with multipurpose tower and a surface blow out preventer |
US7032691B2 (en) * | 2003-10-30 | 2006-04-25 | Stena Drilling Ltd. | Underbalanced well drilling and production |
US7237623B2 (en) * | 2003-09-19 | 2007-07-03 | Weatherford/Lamb, Inc. | Method for pressurized mud cap and reverse circulation drilling from a floating drilling rig using a sealed marine riser |
US20070289746A1 (en) * | 2001-09-10 | 2007-12-20 | Ocean Riser Systems As | Arrangement and method for controlling and regulating bottom hole pressure when drilling deepwater offshore wells |
US20080060846A1 (en) * | 2005-10-20 | 2008-03-13 | Gary Belcher | Annulus pressure control drilling systems and methods |
US20080105434A1 (en) * | 2006-11-07 | 2008-05-08 | Halliburton Energy Services, Inc. | Offshore Universal Riser System |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4091881A (en) * | 1977-04-11 | 1978-05-30 | Exxon Production Research Company | Artificial lift system for marine drilling riser |
NO305138B1 (en) * | 1994-10-31 | 1999-04-06 | Mercur Slimhole Drilling And I | Device for use in drilling oil / gas wells |
US6065550A (en) * | 1996-02-01 | 2000-05-23 | Gardes; Robert | Method and system for drilling and completing underbalanced multilateral wells utilizing a dual string technique in a live well |
US6216799B1 (en) | 1997-09-25 | 2001-04-17 | Shell Offshore Inc. | Subsea pumping system and method for deepwater drilling |
WO2000052299A1 (en) * | 1999-03-02 | 2000-09-08 | Weatherford/Lamb, Inc. | Internal riser rotating control head |
US6668943B1 (en) * | 1999-06-03 | 2003-12-30 | Exxonmobil Upstream Research Company | Method and apparatus for controlling pressure and detecting well control problems during drilling of an offshore well using a gas-lifted riser |
US6450262B1 (en) | 1999-12-09 | 2002-09-17 | Stewart & Stevenson Services, Inc. | Riser isolation tool |
US6484816B1 (en) * | 2001-01-26 | 2002-11-26 | Martin-Decker Totco, Inc. | Method and system for controlling well bore pressure |
US6966392B2 (en) * | 2001-02-15 | 2005-11-22 | Deboer Luc | Method for varying the density of drilling fluids in deep water oil and gas drilling applications |
US7090036B2 (en) * | 2001-02-15 | 2006-08-15 | Deboer Luc | System for drilling oil and gas wells by varying the density of drilling fluids to achieve near-balanced, underbalanced, or overbalanced drilling conditions |
US6536540B2 (en) * | 2001-02-15 | 2003-03-25 | De Boer Luc | Method and apparatus for varying the density of drilling fluids in deep water oil drilling applications |
US6802379B2 (en) * | 2001-02-23 | 2004-10-12 | Exxonmobil Upstream Research Company | Liquid lift method for drilling risers |
AU2002253976A1 (en) | 2001-02-23 | 2002-09-12 | Exxonmobil Upstream Research Company | Method and apparatus for controlling bottom-hole pressure during dual-gradient drilling |
CA2344627C (en) * | 2001-04-18 | 2007-08-07 | Northland Energy Corporation | Method of dynamically controlling bottom hole circulating pressure in a wellbore |
AU2002320329A1 (en) | 2001-07-09 | 2003-01-29 | Baker Hughes Incorporated | Drilling system and method for controlling equivalent circulating density during drilling of wellbores |
US6745857B2 (en) * | 2001-09-21 | 2004-06-08 | National Oilwell Norway As | Method of drilling sub-sea oil and gas production wells |
US6904981B2 (en) * | 2002-02-20 | 2005-06-14 | Shell Oil Company | Dynamic annular pressure control apparatus and method |
NO318220B1 (en) * | 2003-03-13 | 2005-02-21 | Ocean Riser Systems As | Method and apparatus for performing drilling operations |
US7658228B2 (en) * | 2005-03-15 | 2010-02-09 | Ocean Riser System | High pressure system |
-
2003
- 2003-10-30 US US10/697,204 patent/US7032691B2/en active Active
-
2004
- 2004-10-25 BR BRPI0416064-9A patent/BRPI0416064A/en not_active IP Right Cessation
- 2004-10-25 EP EP07008662A patent/EP1808569B1/en not_active Expired - Fee Related
- 2004-10-25 WO PCT/IB2004/004372 patent/WO2005042917A1/en active IP Right Grant
- 2004-10-25 AU AU2004286103A patent/AU2004286103B2/en not_active Ceased
- 2004-10-25 ES ES07008662T patent/ES2349789T3/en active Active
- 2004-10-25 EP EP09015250A patent/EP2161404B1/en not_active Expired - Fee Related
- 2004-10-25 DK DK07008662.4T patent/DK1808569T3/en active
- 2004-10-25 DK DK09015250.5T patent/DK2161404T3/en active
- 2004-10-25 EP EP04806532A patent/EP1700000B1/en not_active Expired - Fee Related
- 2004-10-25 ES ES04806532T patent/ES2305892T3/en active Active
- 2004-10-25 DK DK04806532T patent/DK1700000T3/en active
- 2004-10-25 ES ES09015250T patent/ES2393434T3/en active Active
-
2006
- 2006-04-13 US US11/404,143 patent/US20060191716A1/en not_active Abandoned
- 2006-04-24 TN TNP2006000119A patent/TNSN06119A1/en unknown
- 2006-04-30 EG EGNA2006000408 patent/EG24344A/en active
- 2006-05-19 NO NO20062254A patent/NO338633B1/en not_active IP Right Cessation
-
2009
- 2009-09-03 US US12/553,208 patent/US8176985B2/en not_active Expired - Lifetime
-
2016
- 2016-05-12 NO NO20160812A patent/NO339557B1/en not_active IP Right Cessation
Patent Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3324017A (en) * | 1958-06-12 | 1967-06-06 | Sinclair Research Inc | Method for copolymerizing an alkylidene bisacrylamide and an ethylenic monomer employing radiation |
US5014789A (en) * | 1986-07-07 | 1991-05-14 | Neville Clarke | Method for startup of production in an oil well |
US5662181A (en) * | 1992-09-30 | 1997-09-02 | Williams; John R. | Rotating blowout preventer |
US5848656A (en) * | 1995-04-27 | 1998-12-15 | Moeksvold; Harald | Device for controlling underwater pressure |
US5873420A (en) * | 1997-05-27 | 1999-02-23 | Gearhart; Marvin | Air and mud control system for underbalanced drilling |
US6273193B1 (en) * | 1997-12-16 | 2001-08-14 | Transocean Sedco Forex, Inc. | Dynamically positioned, concentric riser, drilling method and apparatus |
US6263982B1 (en) * | 1998-03-02 | 2001-07-24 | Weatherford Holding U.S., Inc. | Method and system for return of drilling fluid from a sealed marine riser to a floating drilling rig while drilling |
US6913092B2 (en) * | 1998-03-02 | 2005-07-05 | Weatherford/Lamb, Inc. | Method and system for return of drilling fluid from a sealed marine riser to a floating drilling rig while drilling |
US6325159B1 (en) * | 1998-03-27 | 2001-12-04 | Hydril Company | Offshore drilling system |
US20030070840A1 (en) * | 2001-02-15 | 2003-04-17 | Boer Luc De | Method and apparatus for varying the density of drilling fluids in deep water oil drilling applications |
US6672390B2 (en) * | 2001-06-15 | 2004-01-06 | Shell Oil Company | Systems and methods for constructing subsea production wells |
US20070289746A1 (en) * | 2001-09-10 | 2007-12-20 | Ocean Riser Systems As | Arrangement and method for controlling and regulating bottom hole pressure when drilling deepwater offshore wells |
US20030127230A1 (en) * | 2001-12-03 | 2003-07-10 | Von Eberstein, William Henry | Method for formation pressure control while drilling |
US7237623B2 (en) * | 2003-09-19 | 2007-07-03 | Weatherford/Lamb, Inc. | Method for pressurized mud cap and reverse circulation drilling from a floating drilling rig using a sealed marine riser |
US7032691B2 (en) * | 2003-10-30 | 2006-04-25 | Stena Drilling Ltd. | Underbalanced well drilling and production |
US7021402B2 (en) * | 2003-12-15 | 2006-04-04 | Itrec B.V. | Method for using a multipurpose unit with multipurpose tower and a surface blow out preventer |
US20060021755A1 (en) * | 2004-07-28 | 2006-02-02 | Amin Radi | Underbalanced marine drilling riser |
US7237613B2 (en) * | 2004-07-28 | 2007-07-03 | Vetco Gray Inc. | Underbalanced marine drilling riser |
US20080060846A1 (en) * | 2005-10-20 | 2008-03-13 | Gary Belcher | Annulus pressure control drilling systems and methods |
US20080105434A1 (en) * | 2006-11-07 | 2008-05-08 | Halliburton Energy Services, Inc. | Offshore Universal Riser System |
Cited By (63)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8714240B2 (en) | 2002-10-31 | 2014-05-06 | Weatherford/Lamb, Inc. | Method for cooling a rotating control device |
US7836946B2 (en) | 2002-10-31 | 2010-11-23 | Weatherford/Lamb, Inc. | Rotating control head radial seal protection and leak detection systems |
US8353337B2 (en) | 2002-10-31 | 2013-01-15 | Weatherford/Lamb, Inc. | Method for cooling a rotating control head |
US7934545B2 (en) | 2002-10-31 | 2011-05-03 | Weatherford/Lamb, Inc. | Rotating control head leak detection systems |
US8113291B2 (en) | 2002-10-31 | 2012-02-14 | Weatherford/Lamb, Inc. | Leak detection method for a rotating control head bearing assembly and its latch assembly using a comparator |
US8127854B2 (en) * | 2004-04-16 | 2012-03-06 | Vetco Gray Scandinavia As | System and method for rigging up well workover equipment |
US20070284113A1 (en) * | 2004-04-16 | 2007-12-13 | Vetco Gray Scandinavia As | System And Method For Rigging Up Well Workover Equipment |
US7926593B2 (en) | 2004-11-23 | 2011-04-19 | Weatherford/Lamb, Inc. | Rotating control device docking station |
US8701796B2 (en) | 2004-11-23 | 2014-04-22 | Weatherford/Lamb, Inc. | System for drilling a borehole |
US8826988B2 (en) | 2004-11-23 | 2014-09-09 | Weatherford/Lamb, Inc. | Latch position indicator system and method |
US8939235B2 (en) | 2004-11-23 | 2015-01-27 | Weatherford/Lamb, Inc. | Rotating control device docking station |
US9784073B2 (en) | 2004-11-23 | 2017-10-10 | Weatherford Technology Holdings, Llc | Rotating control device docking station |
US9404346B2 (en) | 2004-11-23 | 2016-08-02 | Weatherford Technology Holdings, Llc | Latch position indicator system and method |
US8408297B2 (en) | 2004-11-23 | 2013-04-02 | Weatherford/Lamb, Inc. | Remote operation of an oilfield device |
US9376870B2 (en) | 2006-11-07 | 2016-06-28 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US8033335B2 (en) | 2006-11-07 | 2011-10-11 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US8881831B2 (en) | 2006-11-07 | 2014-11-11 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US9127511B2 (en) | 2006-11-07 | 2015-09-08 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US9051790B2 (en) | 2006-11-07 | 2015-06-09 | Halliburton Energy Services, Inc. | Offshore drilling method |
US9085940B2 (en) | 2006-11-07 | 2015-07-21 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US9127512B2 (en) | 2006-11-07 | 2015-09-08 | Halliburton Energy Services, Inc. | Offshore drilling method |
US9157285B2 (en) | 2006-11-07 | 2015-10-13 | Halliburton Energy Services, Inc. | Offshore drilling method |
US20100018715A1 (en) * | 2006-11-07 | 2010-01-28 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US8887814B2 (en) | 2006-11-07 | 2014-11-18 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US8776894B2 (en) | 2006-11-07 | 2014-07-15 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US7997345B2 (en) | 2007-10-19 | 2011-08-16 | Weatherford/Lamb, Inc. | Universal marine diverter converter |
US10087701B2 (en) | 2007-10-23 | 2018-10-02 | Weatherford Technology Holdings, Llc | Low profile rotating control device |
US8286734B2 (en) | 2007-10-23 | 2012-10-16 | Weatherford/Lamb, Inc. | Low profile rotating control device |
US8844652B2 (en) | 2007-10-23 | 2014-09-30 | Weatherford/Lamb, Inc. | Interlocking low profile rotating control device |
US9004181B2 (en) | 2007-10-23 | 2015-04-14 | Weatherford/Lamb, Inc. | Low profile rotating control device |
US8281875B2 (en) | 2008-12-19 | 2012-10-09 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US8770297B2 (en) | 2009-01-15 | 2014-07-08 | Weatherford/Lamb, Inc. | Subsea internal riser rotating control head seal assembly |
US9359853B2 (en) | 2009-01-15 | 2016-06-07 | Weatherford Technology Holdings, Llc | Acoustically controlled subsea latching and sealing system and method for an oilfield device |
US8322432B2 (en) | 2009-01-15 | 2012-12-04 | Weatherford/Lamb, Inc. | Subsea internal riser rotating control device system and method |
US8636087B2 (en) | 2009-07-31 | 2014-01-28 | Weatherford/Lamb, Inc. | Rotating control system and method for providing a differential pressure |
US9334711B2 (en) | 2009-07-31 | 2016-05-10 | Weatherford Technology Holdings, Llc | System and method for cooling a rotating control device |
US8347983B2 (en) | 2009-07-31 | 2013-01-08 | Weatherford/Lamb, Inc. | Drilling with a high pressure rotating control device |
US20110139509A1 (en) * | 2009-12-15 | 2011-06-16 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US8286730B2 (en) | 2009-12-15 | 2012-10-16 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US8863858B2 (en) | 2010-04-16 | 2014-10-21 | Weatherford/Lamb, Inc. | System and method for managing heave pressure from a floating rig |
US9260927B2 (en) | 2010-04-16 | 2016-02-16 | Weatherford Technology Holdings, Llc | System and method for managing heave pressure from a floating rig |
US8347982B2 (en) | 2010-04-16 | 2013-01-08 | Weatherford/Lamb, Inc. | System and method for managing heave pressure from a floating rig |
US8201628B2 (en) | 2010-04-27 | 2012-06-19 | Halliburton Energy Services, Inc. | Wellbore pressure control with segregated fluid columns |
US8261826B2 (en) | 2010-04-27 | 2012-09-11 | Halliburton Energy Services, Inc. | Wellbore pressure control with segregated fluid columns |
US8820405B2 (en) | 2010-04-27 | 2014-09-02 | Halliburton Energy Services, Inc. | Segregating flowable materials in a well |
US20110290495A1 (en) * | 2010-05-28 | 2011-12-01 | Smith David R | Method and apparatus to conrol fluid flow from subsea wells |
US8807223B2 (en) * | 2010-05-28 | 2014-08-19 | David Randolph Smith | Method and apparatus to control fluid flow from subsea wells |
US9206664B2 (en) | 2010-05-28 | 2015-12-08 | Red Desert Enterprise, Llc | Method and apparatus to control fluid flow from subsea wells |
US9175542B2 (en) | 2010-06-28 | 2015-11-03 | Weatherford/Lamb, Inc. | Lubricating seal for use with a tubular |
US8881829B2 (en) * | 2010-10-07 | 2014-11-11 | David B. Redden | Backup wellhead blowout prevention system and method |
US9249638B2 (en) | 2011-04-08 | 2016-02-02 | Halliburton Energy Services, Inc. | Wellbore pressure control with optimized pressure drilling |
US8833488B2 (en) | 2011-04-08 | 2014-09-16 | Halliburton Energy Services, Inc. | Automatic standpipe pressure control in drilling |
US9080407B2 (en) | 2011-05-09 | 2015-07-14 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US9605507B2 (en) | 2011-09-08 | 2017-03-28 | Halliburton Energy Services, Inc. | High temperature drilling with lower temperature rated tools |
US20140360731A1 (en) * | 2011-11-10 | 2014-12-11 | Cameron International Corporation | Blowout Preventer Shut-In Assembly of Last Resort |
US9976375B2 (en) * | 2011-11-10 | 2018-05-22 | Cameron International Corporation | Blowout preventer shut-in assembly of last resort |
US10233708B2 (en) | 2012-04-10 | 2019-03-19 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US9376875B2 (en) * | 2012-04-27 | 2016-06-28 | Smith International, Inc. | Wellbore annular pressure control system and method using gas lift in drilling fluid return line |
US20150083429A1 (en) * | 2012-04-27 | 2015-03-26 | Smith International, Inc. | Wellbore annular pressure control system and method using gas lift in drilling fluid return line |
US9249637B2 (en) * | 2012-10-15 | 2016-02-02 | National Oilwell Varco, L.P. | Dual gradient drilling system |
US20160230492A1 (en) * | 2013-03-15 | 2016-08-11 | Cameron International Corporation | Riser gas handling system |
US9765587B2 (en) * | 2013-03-15 | 2017-09-19 | Cameron International Corporation | Riser gas handling system |
US10294746B2 (en) * | 2013-03-15 | 2019-05-21 | Cameron International Corporation | Riser gas handling system |
Also Published As
Publication number | Publication date |
---|---|
WO2005042917A1 (en) | 2005-05-12 |
NO339557B1 (en) | 2017-01-02 |
NO338633B1 (en) | 2016-09-19 |
US8176985B2 (en) | 2012-05-15 |
US7032691B2 (en) | 2006-04-25 |
TNSN06119A1 (en) | 2007-11-15 |
BRPI0416064A (en) | 2007-01-02 |
US20090314544A1 (en) | 2009-12-24 |
ES2393434T3 (en) | 2012-12-21 |
EP2161404B1 (en) | 2012-08-29 |
DK2161404T3 (en) | 2012-12-17 |
DK1808569T3 (en) | 2010-11-08 |
EG24344A (en) | 2009-02-11 |
US20050092522A1 (en) | 2005-05-05 |
EP1808569A3 (en) | 2009-06-17 |
EP1700000B1 (en) | 2008-04-23 |
ES2305892T3 (en) | 2008-11-01 |
DK1700000T3 (en) | 2008-07-28 |
EP1808569B1 (en) | 2010-07-28 |
EP1700000A1 (en) | 2006-09-13 |
ES2349789T3 (en) | 2011-01-11 |
NO20062254L (en) | 2006-07-28 |
EP2161404A2 (en) | 2010-03-10 |
AU2004286103B2 (en) | 2008-02-14 |
EP1808569A2 (en) | 2007-07-18 |
EP2161404A3 (en) | 2010-04-14 |
AU2004286103A1 (en) | 2005-05-12 |
NO20160812L (en) | 2006-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8176985B2 (en) | Well drilling and production using a surface blowout preventer | |
US8978774B2 (en) | System and method for drilling a subsea well | |
US6470975B1 (en) | Internal riser rotating control head | |
US9816323B2 (en) | Systems and methods for subsea drilling | |
US6536540B2 (en) | Method and apparatus for varying the density of drilling fluids in deep water oil drilling applications | |
US7258171B2 (en) | Internal riser rotating control head | |
US6328107B1 (en) | Method for installing a well casing into a subsea well being drilled with a dual density drilling system | |
US7134498B2 (en) | Well drilling and completions system | |
US20070289746A1 (en) | Arrangement and method for controlling and regulating bottom hole pressure when drilling deepwater offshore wells | |
NO338632B1 (en) | Apparatus and method for controlling formation fluid flow into a borehole production tube | |
GB2423100A (en) | Displacement annular swivel | |
AU2008201481B2 (en) | Underbalanced well drilling and production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: STENA DRILLING LTD., UNITED KINGDOM Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HUMPHREYS, GAVIN;REEL/FRAME:017774/0172 Effective date: 20060331 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |