US20050038667A1 - System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities - Google Patents

System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities Download PDF

Info

Publication number
US20050038667A1
US20050038667A1 US10/913,728 US91372804A US2005038667A1 US 20050038667 A1 US20050038667 A1 US 20050038667A1 US 91372804 A US91372804 A US 91372804A US 2005038667 A1 US2005038667 A1 US 2005038667A1
Authority
US
United States
Prior art keywords
facility
target variable
determining
category
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/913,728
Inventor
Michael Hileman
Robert Broadfoot
Richard Jones
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HSB SOLOMON ASSOCATES LLC
HSB Solomon Assoc LLC
Original Assignee
HSB Solomon Assoc LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HSB Solomon Assoc LLC filed Critical HSB Solomon Assoc LLC
Priority to US10/913,728 priority Critical patent/US20050038667A1/en
Assigned to HSB SOLOMON ASSOCATES, LLC reassignment HSB SOLOMON ASSOCATES, LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BROADFOOT, ROBERT, HILEMAN, MICHAEL J., JONES, RICHARD B.
Publication of US20050038667A1 publication Critical patent/US20050038667A1/en
Priority to US11/075,626 priority patent/US7693725B2/en
Priority to US11/488,266 priority patent/US7233910B2/en
Priority to US11/732,037 priority patent/US20080201181A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/84Greenhouse gas [GHG] management systems
    • Y02P90/845Inventory and reporting systems for greenhouse gases [GHG]

Definitions

  • the present invention relates to comparing the performance of manufacturing, refining, petrochemical, pipeline, power generating, distribution, and other industrial facilities. More specifically, the invention relates to determining the equivalency factors that enable the conversion of production and other data from a facility to a form that can be directly compared to the production and other data from a another facility that has different characteristics.
  • the present invention provides a new and unique system and method for determining equivalency factors for use in comparative performance analysis of industrial facilities by determining a target variable, and a plurality of characteristics of the target variable.
  • the characteristics are sorted and a data collection classification system is developed.
  • the data classification system is used to quantitatively measure the differences in characteristics.
  • Data is collected according to the data collection classification system.
  • the data is validated, and based on the data, an analysis model is developed to compare predicted target variable to actual target variable for a set of industrial facilities.
  • the model is used to then find the best set of complexity factors to minimize the difference in predicted versus actual target variable values in the model.
  • FIG. 1 is a flowchart illustrating the operation of an embodiment of the invention.
  • FIG. 2 is a flowchart illustrating the operation of another embodiment of the invention.
  • FIG. 3 is a flowchart illustrating the operation of another embodiment of the invention.
  • FIG. 4 is an example implementation of an embodiment of the invention.
  • FIG. 5 is another example implementation of an embodiment of the invention using example data.
  • FIG. 6 is another example implementation of an embodiment of the invention using example data.
  • FIG. 7 is a flowchart illustrating an example implementation of an embodiment of the invention.
  • FIG. 8 is a graph depicting an example use of equivalency factors to compare performance of facilities using equivalency factors.
  • FIG. 9 is an illustrative node for implementing a method of the invention.
  • a target variable (“Target Variable”) is selected.
  • the target variable is a quantifiable attribute (such as total operating expense, financial result, capital cost, operating cost, staffing, product yield, emissions, energy consumption, or any other quantifiable attribute of performance).
  • Target Variables could be in manufacturing, refining, chemical (including (petrochemicals, organic and inorganic chemicals, plastics, agricultural chemicals, and pharmaceuticals), Olefins plant, chemical manufacturing, pipeline, power generating, distribution, and other industrial facilities.
  • the Target Variables could also be for different environmental aspects.
  • Target Variables could also be in other forms and types of industrial and commercial industries.
  • First principle characteristics are the physical or fundamental characteristics of a facility or process that are expected to determine the Target Variable. Common brainstorming or team knowledge management techniques can be used to develop the first list of possible characteristics for the Target Variable. In one embodiment, all of the characteristics of an industrial facility that may cause variation in the Target Variable when comparing different manufacturing facilities are identified as first principle characteristics.
  • the primary first principle characteristics are determined. As will be understood by those skilled in the art, many different options are available to determine the primary first principle characteristics. One such option is shown in FIG. 2 .
  • the primary characteristics are classified.
  • Potential classifications include discrete, continuous, or ordinal.
  • Discrete characteristics are those characteristics that can be measured using a selection between two or more states, for example a binary determination, such as “yes” or “no.”
  • An example discrete characteristic could be “Duplicate Equipment.” The determination of “Duplicate Equipment” is “yes, the facility has duplicate equipment” or “no, there is no duplicate equipment.”
  • Continuous characteristics are directly measurable.
  • An example of a continuous characteristic could be the “Feed Capacity,” since it is directly measured as a continuous variable.
  • Ordinal characteristics are characteristics that are not readily measurable. Instead, ordinal characteristics can be scored along an ordinal scale reflecting physical differences that are not directly measurable. It is also possible to create ordinal characteristics for variables that are measurable or binary. An example of an ordinal characteristic would be refinery configuration between three typical major industry options. These are presented in ordinal scale by unit complexity:
  • Variables placed in an ordinal scale may be converted to an interval scale for development of equivalency factors.
  • To convert ordinal variables to interval variables requires the development of a scale upon which the differences between units are on a measurable scale.
  • the process to develop an interval scale for ordinal characteristic data can rely on the understanding of a team of experts of the characteristic's scientific drivers.
  • the team of experts can first determine, based on their understanding of the process being measured and scientific principle, the type of relationship between different physical characteristics and the Target Variable.
  • the relationship may be linear, logarithmic, a power function, a quadratic function or any other mathematical relationship.
  • the experts can optionally estimate a complexity factor to reflect the relationship between characteristics and variation in Target Variable.
  • Complexity factors are the exponential power used to make the relationship linear between the ordinal variable to the target variable resulting in an interval variable scale.
  • a data collection classification system is developed. For those characteristics categorized as continuous, a data collection system that allows a quantification of the characteristics is needed. A system of definitions will need to be developed to ensure data is collected in a consistent manner. For characteristics categorized as binary, a simple yes/no questionnaire is used to collect data. A system of definitions may need to be developed to ensure data is collected in a consistent manner. For characteristics categorized as ordinal, a measurement scale can be developed as described above.
  • At least four methods to develop a consensus function can be employed.
  • an expert or team of experts can be used to determine the type of relationship that exists between the characteristics and the variation in Target Variable.
  • the ordinal characteristics can be scaled (for example 1,2,3 . . . n for n configurations). By plotting the target value versus the configuration, the configurations are placed in progressive order of influence.
  • the determination of the Target Variable value relationship to the ordinal characteristic is forced into the optimization analysis, as described in more detail below.
  • the general optimization model described in Equation 1.0 can be modified to accommodate a potential non-linear relationship.
  • the ordinal measurement can be scaled as discussed above, and then regressed against the data to make a plot of Target Variable versus the ordinal characteristic to be as nearly linear as possible.
  • a combination of the foregoing embodiments can be utilized to make use of the available expert experience, and available data quality and data quantity of data.
  • a measurement scale is developed. For instance, a single characteristic may take the form of five different physical configurations. The characteristics with the physical characteristics resulting in the lowest impact on variation in Target Variable will be given a scale setting score. This value may be assigned to any non-zero value. In this example, the value assigned is 1.0. The characteristics with the second largest impact on variation in Target Variable will be a function of the scale setting value, as determined by a consensus function. The consensus function is arrived at by using the measurement scale for ordinal characteristics as described above. This is repeated until a scale for the applicable physical configurations is developed.
  • the classification system is used to collect data.
  • the data collection process can begin with the development of data input forms and instructions.
  • data collection training seminars are conducted to assist in data collection. Training seminars may improve the consistency and accuracy of data submissions.
  • a consideration in data collection is the definition of the industrial facility boundaries being analyzed.
  • Data input instructions will provide definitions of what facilities, costs and staffing are to be included in data collection.
  • the data collection input forms may provide worksheets for many of the reporting categories to aid in the preparation of data for entry.
  • the data that is collected can come for several sources, including existing historical data, newly gathered historical data from existing facilities and processes, simulation data from model(s), or synthesized experiential data derived from experts in the field. Additionally, no data at all can be used, in which case the determination of primary characteristics may be based on expert experience.
  • the data is validated.
  • Many data checks can be programmed into an interactive data collection system.
  • the interactive data collection system should only accept data that passes the validation check or the check is over-ridden with appropriate authority.
  • Validation routines may be developed to validate the data as it is collected.
  • the validation routines can take many forms, including:
  • constraints may be developed for use in solving the analysis model. These constraints could include constraints on the equivalence factor values. These can be minimum or maximum values, or constraints on groupings of values, or any other mathematical constraint forms. One method of determining the constraints is shown in FIG. 3 .
  • the analysis model is solved by applying optimization methods of choice with the collected data to determine the optimum set of complexity factors relating the Target Variable to the characteristics.
  • the generalized reduced gradient non-linear optimization method can be used. However, many other optimization methods could be utilized.
  • developed characteristics may be determined. Developed characteristics are the result of any mathematical relationship that exists between one or more first principle characteristics and may be used to express the information represented by that mathematical relationship. In addition, if a linear general optimization model is utilized, then nonlinear information in the characteristics can be captured in developed characteristics. Determination of the developed characteristics form is accomplished by discussion with experts, modeling expertise, and by trial and refinement.
  • step 122 the optimization model is applied to the primary first principle characteristics and the developed characteristics to determine the equivalency factors. In one embodiment, if developed characteristics are utilized, step 116 through step 122 may be repeated in an iterative fashion until the level of model accuracy desired is achieved.
  • each characteristic is ranked from highest to lowest based on its effect on the Target Variable. It will be understood by those skilled in the art that other ranking criteria could be used.
  • the characteristics may be grouped into one or more categories.
  • the characteristics are grouped into three categories.
  • the first category contains characteristics that effect a Target Variable at a percentage less than a lower threshold (for example, 5%).
  • the second category are those characteristics with a percentage between the lower percentage and a second threshold (for example, 5% and 20%).
  • the third category are those characteristics with a percentage over the second threshold (for example, 20%). Additional or fewer categories and different ranges are also possible.
  • those characteristics with Target Variable average variation below a specific threshold may be removed from the list of characteristics. For example, this could include those characteristics in the first category (e.g., those characteristics with a percentage of less than 5%). It will be understood by those skilled in the art that other thresholds could be used, and multiple categories could be removed from the list of characteristics.
  • the process is repeated starting at step 202 above. In another embodiment, no characteristics are removed from the list until determining whether another co-variant relationships exist, as described in step 212 below.
  • Mid-level characteristics are characteristics that have a certain level of effect on the Target Variable, but individually do not influence the Target Variable in a significant manner.
  • those characteristics in the second category are mid-level characteristics.
  • Example relationships between the characteristics are co-variant, dependent, and independent.
  • a co-variant relationship occurs when modifying one characteristic causes the Target Variable to vary, but only when another characteristic is present. For instance, in the scenario where characteristic “A” is varied, which causes the Target Variable to vary, but only when characteristic “B” is present, then “A” and “B” have a co-variant relationship.
  • a dependent relationship occurs when a characteristic is a derivative of or directly related to another characteristic. For instance, when the characteristic “A” is only present when characteristic “B” is present, then A and B have a dependent relationship. For those characteristics that are not co-variant or dependent, they are categorized as having independent relationships.
  • characteristics displaying dependence on each other may be resolved to remove dependencies and high correlations.
  • the process may be repeated from step 202 . In one embodiment, if the difference variable is insignificant it can be removed from the analysis in the repeated step 208 .
  • the characteristics are analyzed to determine the extent of the inter-relationships. In one embodiment, if any of the previous steps resulted in repeating the process, the repetition should be conducted prior to step 214 . In some embodiments, the process may be repeated multiple times before continuing to step 214 .
  • the characteristics that result in less than a minimum threshold change in the impact on Target Variable variation caused by another characteristic are dropped from the list of potential characteristics.
  • An illustrative threshold could be 10%. For instance, if the variation in Target Variable caused by characteristic “A” is increased when characteristic “B” is present; the percent increase in the Target Variable variation caused by the presence of characteristic “B” must be estimated. If the variation of characteristic “B” is estimated to increase the variation in the Target Variable by less than 10% of the increase caused by characteristic “A” alone, characteristic “B” can be eliminated from the list of potential characteristics. Characteristic “A” can also be deemed then to have an insignificant impact on the Target Variable. The remaining characteristics are deemed to be the primary characteristics.
  • constraints are developed on the equivalency factors, step 302 .
  • the objective function as described below, is optimized to determine an initial set of equivalency factors, step. 304 .
  • the percent contribution of each characteristic to the target variable is calculated.
  • One method is the “Average Method,” which is a two step process where the Total Average Impact is calculated and then the percent contribution of each characteristic is calculated.
  • the Summation of Records Method may be used if non-linearity exists in the impacts. It is contemplated that other methods to calculate impacts may be used.
  • step 308 each percent contribution is compared against expert knowledge. Domain experts will have an intuitive or empirical feel for the relative impacts of key characteristics to the overall target value. The contribution of each characteristic is judged against this expert knowledge.
  • step 310 a decision is made about the acceptability of the individual contributions. If the contribution are found to be unacceptable the process continues to step 312 . If they are found to be acceptable the process continues to step 316 .
  • a decision is made to address how the unacceptable results of the individual contributions are to be handled.
  • the options are to adjust the constraints on the equivalency factors to affect a solution, or to decide that the characteristic set chosen can not be helped through constraint adjustment. If the developer gives up on constraint adjustment then the process proceeds to step 316 . If the decision is made to achieve acceptable results through constraint adjustment then the process continues to step 314 .
  • step 314 the constraints are adjusted to increase or decrease the impact of individual characteristics in an effort to obtain acceptable results from the individual contributions.
  • the process continues to step 302 with the revised constraints.
  • step 316 peer and expert review of the equivalency factors developed may be performed to determine the acceptability of the equivalency factors developed. If the factors pass the expert and peer review, the process continues to step 326 . If the equivalency factors are found to be unacceptable, the process continues to step 318 .
  • step 318 new approaches and suggestions for modification of the characteristics are developed by working with experts in the particular domain. This may include the creation of new developed characteristics, or the addition of new first principle to the analysis data set.
  • step 320 a determination is made as to whether data exists to support the investigation of the approaches and suggestions for modification of the characteristics. If the data exists, the process proceeds to step 324 . If the data does not exist, the process proceeds to step 322 .
  • step 322 additional data is collected and obtained in an effort to attempt the corrections required to obtain a satisfactory solution.
  • step 324 the set of characteristics are revised in view of the new approaches and suggestions.
  • step 326 the reasoning behind the selection of characteristics used is documented. This documentation can be used in explaining results for use of the equivalency factors.
  • matrix 10 of a system for determining equivalency factors is illustrated. While matrix 10 can be expressed in many configurations, in this particular example, matrix 10 is constructed with the first principle characteristics 12 and developed characteristics 14 on one axis, and the different facilities 16 for which data has been collected on the other axis. For each first principle characteristic 12 at each facility 16 , there is the actual data value 18 . For each first principle characteristic 12 and developed characteristic 14 , there is the equivalency factor 22 that will be computed with the optimization model.
  • the constraints 20 limit the range of the equivalency factors 22 . Constraints can be minimum or maximum values, or other mathematical functions or algebraic relationships. Moreover, constraints can be grouped and further constrained. Additional constraints on facility data, and relationships between data points similar to those used in the data validation step, and constraints of any mathematical relationship on the input data can also be employed. In one embodiment, the constraints to be satisfied during optimization apply only to the equivalency factors.
  • the target variable (actual) column 24 are the actual values of the target variable as measured for each facility.
  • the target variable (predicted) column 26 are the values for the target value as calculated using the determined equivalency factors.
  • the error column 28 are the error values for each facility as determined by the optimization model.
  • the error sum 30 is the summation of the errors in error column 28 .
  • the optimization analysis which comprises the Target Variable equation and an objection function, solves for the equivalency factors to minimize the error sum 30 .
  • the equivalency factors ( ⁇ j ) are computed to minimize the error ( ⁇ i ) over all facilities.
  • the non-linear optimization process determines the set of equivalency factors that minimizes this equation for a given set of first principle characteristics, constraints, and a selected value.
  • the Target Variable is computed as a function of the characteristics and the yet to be determined equivalency factors.
  • the analysis results are not dependent on the specific value of p.
  • a third form of the objective function is to solve for the simple sum of errors squared as given in Equation 5 below.
  • the determined equivalency factors are those equivalency factors that result in the least difference between the summation and the actual value of the Target Variable after the model iteratively moves through each facility and characteristic such that each potential equivalency factor, subject to the constraints, is multiplied against the data value for the corresponding characteristic and summed for the particular facility.
  • FIGS. 1-3 For illustrative purposes, a more specific example of the system and method for determining equivalency factors for use in comparative performance analysis as illustrated in FIGS. 1-3 is shown.
  • the example will be shown with respect to a major process unit in most petroleum refineries, known as a Fluidized Catalytic Cracking Unit (Cat Cracker).
  • Cat Cracker cracks long molecules into shorter molecules in the gasoline boiling range and lighter. The process in conducted at very high temperatures in the presence of a catalyst. In the process of cracking the feed, coke is produced and deposited on the catalyst. The coke is burned off the catalyst to recover heat and to reactivate the catalyst.
  • the Cat Cracker has several main sections: Reactor, Regenerator, Main Fractionator, and Emission Control Equipment.
  • Cat Cracker example is for illustrative purposes and may not represent the actual results of applying this methodology to Cat Crackers, or any other industrial facility. Moreover, the Cat Cracker example is but one example of many potential applications of the used of this invention in the refining industry.
  • the desired Target Variable will be “Cash Operating Costs” or “Cash OPEX” in a Cat Cracker facility.
  • the first principle characteristics that may affect Cash Operating Costs for a Cat Cracker might be: Feed Quality Feed Capacity Emission Control Equipment Regenerator Staff Training Main Fractionator Design Design Staff Experience Trade Union Maintenance Practices Location Reactor Temperature Regenerator Temperature Age of Unit Duplicate Equipment Degree of Feed Preheat Catalyst Type Reactor Design
  • step 106 this example has determined the effect of the first characteristics.
  • the embodiment for determining primary characteristics as shown in FIG. 2 will be used.
  • each characteristic is given an variation percentage.
  • the characteristics from the Cat Cracker Example are rated and ranked.
  • the categories are as follows: Percent of Average Variation in the Target Variable Between Facilities Category 1 (Major Characteristics) >20% Category 2 (Midlevel Characteristics) 5-20% Category 3 (Minor Characteristics) ⁇ 5%
  • the characteristics are grouped according to category, step 206 .
  • those characteristics in Category 3 are discarded as being minor.
  • Characteristics in Category 2 must be analyzed further to determine the type of relationship they exhibit with other characteristics, step 210 . Each is classified as exhibiting either co-variance, dependence or independence, step 212 .
  • a co-variance, dependence or independence step 212 .
  • the degree of the relationship of these characteristics is analyzed.
  • Staffing levels classified as having an Independent relationship, stays in the analysis process.
  • Age of Unit is classified as having a dependent relationship with Staff Training.
  • a dependent relationship means Age of Unit is a derivative of Staff Experience or vice versa.
  • Age of Unit can be dropped from the analysis and the broader characteristic of Staff Training will remain in the analysis process.
  • the three characteristics classified as having a co-variant relationship, Staff Training, Emission Equipment, Maintenance Practices, must be examined to determine the degree of co-variance.
  • the remaining characteristics are categorized as continuous, ordinal or binary type measurement, step 108 .
  • the complexity factor is often estimated to follow a power curve relationship.
  • a data collection classification system is developed.
  • a questionnaire is developed to measure how many of ten key Maintenance Practices are in regular use at each facility.
  • a system of definitions are used so that data is collected in a consistent manner.
  • the data in terms of number of Maintenance Practices in regular use is converted to a Maintenance Practices Score using the 0.6 factor and “economy of scale” relationship as illustrated in the following table.
  • step 112 data was collected and, at step 114 , validated as follows:
  • Constraint ranges were developed for each characteristics by the expert team to control the model so that the results are within a reasonable range of solutions.
  • step 116 the results of the model optimization runs are shown below.
  • the model indicates Emission Equipment and Maintenance Practices are not significant drivers of variations in Cash Operating Costs between different Cat Crackers. This is indicated by the model finding zero values for equivalency factors for these two characteristics. Reactor Design, Staff Training, and Emission Equipment are found to be significant drivers.
  • FIG. 5 A sample model configuration for the illustrative Cat Cracker example is shown in FIG. 5 .
  • the data 18 , actual values 24 , and the resulting equivalency factors 22 are shown.
  • the error sum 30 is minimal, so developed characteristics are not necessary in this instance.
  • an error sum of differing values may be significant, and result in having to determine developed characteristics.
  • FIGS. 1-3 For additional illustrative purposes, a more specific example of the system and method for determining equivalency factors for use in comparative performance analysis as illustrated in FIGS. 1-3 is shown. The example will be shown with respect to pipelines and tank farms terminals. Pipelines and tank farms are assets used by industry to store and distribute liquid and gaseous feedstocks and products. The example is illustrative for development of equivalence factors for:
  • the desired Target Variable will be “Cash Operating Costs” or “Cash OPEX” in a pipeline asset.
  • the first principle characteristics that may affect Cash Operating Costs might be: Pipeline Related Characteristics Tank Terminal Characteristics Type of Fluid Transported Fluid Class Average Fluid Density Number of Tanks Number of Input and Output Total Number of Valves in Terminal Stations Total Installed Capacity Total Nominal Tank Capacity Total main pump driver KW Annual Number of Tank Turnovers Length of pipeline Tank Terminal Replacement Value Altitude change in pipeline Total Utilized Capacity Pipeline Replacement Value Pump Station Replacement Value
  • step 106 this example has determined the effect of the first characteristics.
  • the embodiment for determining primary characteristics as shown in FIG. 2 will be used.
  • each characteristic is given an impact percentage.
  • This analysis shows that the pipeline replacement value and tank terminal replacement value that are used widely in the industry are characteristics that are dependent on more fundamental characteristics. Accordingly, in this instance, those values are removed from consideration for primary first principle characteristics.
  • the characteristics from are rated and ranked.
  • the categories are as follows: Percent of Average Variation in the Target Variable Between Facilities Category 1 (Major Characteristics) >15% Category 2 (Midlevel Characteristics) 7-15% Category 3 (Minor Characteristics) ⁇ 7% It is understood that other embodiments could have any number of categories and that the percentage values that delineate between the categories may be altered in any manner.
  • the characteristics are grouped according to category, step 206 .
  • those characteristics in Category 3 are discarded as being minor.
  • Characteristics in Category 2 must be analyzed further to determine the type of relationship they exhibit with other characteristics, step 210 . Each is classified as exhibiting either co-variance, dependence or independence as show below:
  • the dependent characteristics are resolved. In this example, there are no dependent characteristics that need to be resolved.
  • the degree of the co-variance of the remaining characteristics are analyzed and no characteristics are dropped.
  • the remaining characteristics are categorized as continuous, ordinal or binary type measurement, step 108 .
  • a data collection classification system is developed.
  • a questionnaire is developed to collect information from participating facilities on the measurements above.
  • step 112 data was collected and, at step 114 , validated as follows:
  • Step 116 constraints were also developed on the equivalency factors by the expert as given below.
  • step 116 the results of the model optimization runs are shown below.
  • step 118 it was determined that there was no need for developed characteristics for this example.
  • the final equivalency factors are those determined in the analysis model step above.
  • FIG. 6 shows the analysis performed on the pipeline and tank farm example. This example shows but one of many potential applications of this invention to the pipeline and tank farm industry.
  • this methodology could be applied to many different industries and facilities.
  • this methodology could be applied to the power generation industry (such as developing equivalency factors for predicting operating expense for single cycle and combined cycle generating stations that generate electrical power from any combination of boilers, steam turbine generators, combustion turbine generators and heat recovery steam generators).
  • this methodology could be applied to develop equivalency factors for predicting the annual cost for ethylene manufacturers of compliance with environmental regulations associated with continuous emissions monitoring and reporting from ethylene furnaces.
  • the equivalency factors would apply to both environmental applications and chemical industry applications.
  • equivalency factors Once equivalency factors have been developed, the factors can be utilized to allow comparison of any one facility's data to another or to compare data across multiple facilities in an industry segment. Referring now to FIG. 7 , an example embodiment 700 for using equivalency factors to establish a standard to be used for comparison between facilities is shown.
  • the gap for all facilities are calculated.
  • the gap is calculated by first determining the predicted value using the equivalency factors. This predicted value may be referred to as the “Equivalent Value” or “EV”.
  • the ratio of target variable to equivalent is calculated and plotted.
  • a piano chart can be used for analysis of comparative performance.
  • An example piano chart for the generation example is given in FIG. 8 .
  • the equations below are used to develop this information.
  • PR i TV i /EV i
  • the rank ordered list of ratios is used to determine membership in performance subgroups.
  • Subgroups can be established as any fraction of the total participants. Typical subgroups include:
  • a customized set of one or more facilities can optionally be selected as the standard for a comparison of all records to be included in the analysis.
  • the facilities to be selected for the measurement standard group for this analysis are arbitrary. Typical value selections include:
  • the set of facilities selected as the benchmark are combined into one single benchmark point. In one embodiment, this can be accomplished by taking the average of the target value of the facilities selected as the benchmark and the average of each characteristic as the single benchmark facility.
  • C2 (a developed characteristic) HRSG + STG + BOIL NDC net dependable capacity SVC Factor fraction of hours in the year that the facility is operated
  • C3 (a developed characteristic) NCF-NOF
  • Target SVC Variable C2 NDC Factor C3 Facility 1 $6,690 7.0 470 1.00 0.0 Facility 2 $2,082 1.0 97 0.979 ⁇ 1.92
  • the first step is to pick one of the facilities as the standard.
  • Facility 1 will be used.
  • Facility 2's values are modified to place it on the same basis as Facility 1. This is done by multiplying the Facility 2 data by the ratio of predicted target variable values.
  • Facility 1's target value can now be compared to that of Facility 2.
  • Facility 1 is operating at a lower OPEX than Facility 2.
  • the difference may represent a gap closure opportunity for Facility 2, if the reasons for the lower OPEX in Facility 1 can be determined.
  • the gap of each facility to the analysis set average performance can also be determined from the equation below.
  • This procedure can be expanded to the entire population of 2 or more facilities to be included in the study.
  • Node 40 can be any form of computing device, including computers, workstations, hand helds, mainframes, embedded computing device, holographic computing device, biological computing device, nanotechnology computing device, virtual computing device and or distributed systems.
  • Node 40 includes a microprocessor 42 , an input device 44 , a storage device 46 , a video controller 48 , a system memory 50 , and a display 54 , and a communication device 56 all interconnected by one or more buses or wires or other communications pathway 52 .
  • the storage device 46 could be a floppy drive, hard drive, CD-ROM, optical drive, bubble memory or any other form of storage device.
  • the storage device 42 may be capable of receiving a floppy disk, CD-ROM, DVD-ROM, memory stick, or any other form of computer-readable medium that may contain computer-executable instructions or data.
  • Further communication device 56 could be a modem, network card, or any other device to enable the node to communicate with humans or other nodes.

Abstract

The present invention provides a system and method for determining equivalency factors for use in comparative performance analysis of industrial facilities by determining a target variable and a plurality of characteristics of the target variable. Each of the plurality of characteristics is ranked according to value. Based on ranking value, the characteristics are divided into categories. Based on the sorted and ranked characteristics, a data collection classification system is developed. Data is collected according to the data collection classification system. The data is validated, and based on the data, an analysis model is developed. The analysis model then calculates the equivalency factors.

Description

  • This application claims the benefit of U.S. Provisional Application No. 60/493,150, filed Aug. 7, 2003.
  • The present invention relates to comparing the performance of manufacturing, refining, petrochemical, pipeline, power generating, distribution, and other industrial facilities. More specifically, the invention relates to determining the equivalency factors that enable the conversion of production and other data from a facility to a form that can be directly compared to the production and other data from a another facility that has different characteristics.
  • SUMMARY
  • The present invention provides a new and unique system and method for determining equivalency factors for use in comparative performance analysis of industrial facilities by determining a target variable, and a plurality of characteristics of the target variable. The characteristics are sorted and a data collection classification system is developed. The data classification system is used to quantitatively measure the differences in characteristics. Data is collected according to the data collection classification system. The data is validated, and based on the data, an analysis model is developed to compare predicted target variable to actual target variable for a set of industrial facilities. The model is used to then find the best set of complexity factors to minimize the difference in predicted versus actual target variable values in the model.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a flowchart illustrating the operation of an embodiment of the invention.
  • FIG. 2 is a flowchart illustrating the operation of another embodiment of the invention.
  • FIG. 3 is a flowchart illustrating the operation of another embodiment of the invention.
  • FIG. 4 is an example implementation of an embodiment of the invention.
  • FIG. 5 is another example implementation of an embodiment of the invention using example data.
  • FIG. 6 is another example implementation of an embodiment of the invention using example data.
  • FIG. 7 is a flowchart illustrating an example implementation of an embodiment of the invention.
  • FIG. 8 is a graph depicting an example use of equivalency factors to compare performance of facilities using equivalency factors.
  • FIG. 9 is an illustrative node for implementing a method of the invention.
  • DETAILED DESCRIPTION
  • The following disclosure provides many different embodiments, or examples, for implementing different features of a system and method for accessing and managing structured content. Specific examples of components, processes, and implementations are described to help clarify the invention. These are, of course, merely examples and are not intended to limit the invention from that described in the claims. Well-known elements are presented without detailed description in order not to obscure the present invention in unnecessary detail. For the most part, details unnecessary to obtain a complete understanding of the present invention have been omitted inasmuch as such details are within the skills of persons of ordinary skill in the relevant art.
  • Referring now to FIG. 1, an example 100 of the operation of one embodiment of a method for determining equivalency factors for use in comparative performance analysis of industrial facilities is shown. At step 102, a target variable (“Target Variable”) is selected. The target variable is a quantifiable attribute (such as total operating expense, financial result, capital cost, operating cost, staffing, product yield, emissions, energy consumption, or any other quantifiable attribute of performance). Target Variables could be in manufacturing, refining, chemical (including (petrochemicals, organic and inorganic chemicals, plastics, agricultural chemicals, and pharmaceuticals), Olefins plant, chemical manufacturing, pipeline, power generating, distribution, and other industrial facilities. The Target Variables could also be for different environmental aspects. Target Variables could also be in other forms and types of industrial and commercial industries.
  • At step 104, the first principle characteristics are identified. First principle characteristics are the physical or fundamental characteristics of a facility or process that are expected to determine the Target Variable. Common brainstorming or team knowledge management techniques can be used to develop the first list of possible characteristics for the Target Variable. In one embodiment, all of the characteristics of an industrial facility that may cause variation in the Target Variable when comparing different manufacturing facilities are identified as first principle characteristics.
  • At step 106, the primary first principle characteristics are determined. As will be understood by those skilled in the art, many different options are available to determine the primary first principle characteristics. One such option is shown in FIG. 2.
  • At step 108, the primary characteristics are classified. Potential classifications include discrete, continuous, or ordinal. Discrete characteristics are those characteristics that can be measured using a selection between two or more states, for example a binary determination, such as “yes” or “no.” An example discrete characteristic could be “Duplicate Equipment.” The determination of “Duplicate Equipment” is “yes, the facility has duplicate equipment” or “no, there is no duplicate equipment.” Continuous characteristics are directly measurable. An example of a continuous characteristic could be the “Feed Capacity,” since it is directly measured as a continuous variable. Ordinal characteristics are characteristics that are not readily measurable. Instead, ordinal characteristics can be scored along an ordinal scale reflecting physical differences that are not directly measurable. It is also possible to create ordinal characteristics for variables that are measurable or binary. An example of an ordinal characteristic would be refinery configuration between three typical major industry options. These are presented in ordinal scale by unit complexity:
  • 1.0 Atmospheric Distillation
  • 2.0 Catalytic Cracking Unit
  • 3.0 Coking Unit
  • Ordinal variables are in rank order, and generally do not contain information about any useful quality of measurement. In the above example, the difference between the complexity of the 1.0 unit and the 2.0 unit, does not necessarily equal the complexity difference between the 3.0 unit and the 2.0 unit.
  • Variables placed in an ordinal scale may be converted to an interval scale for development of equivalency factors. To convert ordinal variables to interval variables requires the development of a scale upon which the differences between units are on a measurable scale. The process to develop an interval scale for ordinal characteristic data can rely on the understanding of a team of experts of the characteristic's scientific drivers. The team of experts can first determine, based on their understanding of the process being measured and scientific principle, the type of relationship between different physical characteristics and the Target Variable. The relationship may be linear, logarithmic, a power function, a quadratic function or any other mathematical relationship. Then the experts can optionally estimate a complexity factor to reflect the relationship between characteristics and variation in Target Variable. Complexity factors are the exponential power used to make the relationship linear between the ordinal variable to the target variable resulting in an interval variable scale.
  • At step 110, a data collection classification system is developed. For those characteristics categorized as continuous, a data collection system that allows a quantification of the characteristics is needed. A system of definitions will need to be developed to ensure data is collected in a consistent manner. For characteristics categorized as binary, a simple yes/no questionnaire is used to collect data. A system of definitions may need to be developed to ensure data is collected in a consistent manner. For characteristics categorized as ordinal, a measurement scale can be developed as described above.
  • To develop a measurement scale for ordinal characteristics, at least four methods to develop a consensus function can be employed. In one embodiment, an expert or team of experts can be used to determine the type of relationship that exists between the characteristics and the variation in Target Variable. In another embodiment, the ordinal characteristics can be scaled (for example 1,2,3 . . . n for n configurations). By plotting the target value versus the configuration, the configurations are placed in progressive order of influence. In utilizing the arbitrary scaling method, the determination of the Target Variable value relationship to the ordinal characteristic is forced into the optimization analysis, as described in more detail below. In this case, the general optimization model described in Equation 1.0 can be modified to accommodate a potential non-linear relationship.
  • In yet another embodiment, the ordinal measurement can be scaled as discussed above, and then regressed against the data to make a plot of Target Variable versus the ordinal characteristic to be as nearly linear as possible. In a further embodiment, a combination of the foregoing embodiments can be utilized to make use of the available expert experience, and available data quality and data quantity of data.
  • Once a relationship is agreed, a measurement scale is developed. For instance, a single characteristic may take the form of five different physical configurations. The characteristics with the physical characteristics resulting in the lowest impact on variation in Target Variable will be given a scale setting score. This value may be assigned to any non-zero value. In this example, the value assigned is 1.0. The characteristics with the second largest impact on variation in Target Variable will be a function of the scale setting value, as determined by a consensus function. The consensus function is arrived at by using the measurement scale for ordinal characteristics as described above. This is repeated until a scale for the applicable physical configurations is developed.
  • At step 112, the classification system is used to collect data. The data collection process can begin with the development of data input forms and instructions. In many cases, data collection training seminars are conducted to assist in data collection. Training seminars may improve the consistency and accuracy of data submissions. A consideration in data collection is the definition of the industrial facility boundaries being analyzed. Data input instructions will provide definitions of what facilities, costs and staffing are to be included in data collection. The data collection input forms may provide worksheets for many of the reporting categories to aid in the preparation of data for entry.
  • The data that is collected can come for several sources, including existing historical data, newly gathered historical data from existing facilities and processes, simulation data from model(s), or synthesized experiential data derived from experts in the field. Additionally, no data at all can be used, in which case the determination of primary characteristics may be based on expert experience.
  • At step 114, the data is validated. Many data checks can be programmed into an interactive data collection system. The interactive data collection system should only accept data that passes the validation check or the check is over-ridden with appropriate authority. Validation routines may be developed to validate the data as it is collected. The validation routines can take many forms, including:
      • Range of acceptable data is specified
      • Ratio of one data point to another is specified where applicable
      • Data is cross checked against all other similar data submitted to determine outlier data points for further investigation
      • Data is cross referenced to any previous data submission
      • Judgment of experts
  • After all input data validation is satisfied, the data is examined relative to all the data collected in a broad “cross-study” validation. This “cross-study” validation may highlight further areas requiring examination and may result in changes to input data.
  • At step 116, constraints may be developed for use in solving the analysis model. These constraints could include constraints on the equivalence factor values. These can be minimum or maximum values, or constraints on groupings of values, or any other mathematical constraint forms. One method of determining the constraints is shown in FIG. 3.
  • At step 118, the analysis model is solved by applying optimization methods of choice with the collected data to determine the optimum set of complexity factors relating the Target Variable to the characteristics. In one embodiment, the generalized reduced gradient non-linear optimization method can be used. However, many other optimization methods could be utilized.
  • At step 120, developed characteristics may be determined. Developed characteristics are the result of any mathematical relationship that exists between one or more first principle characteristics and may be used to express the information represented by that mathematical relationship. In addition, if a linear general optimization model is utilized, then nonlinear information in the characteristics can be captured in developed characteristics. Determination of the developed characteristics form is accomplished by discussion with experts, modeling expertise, and by trial and refinement.
  • At step 122, the optimization model is applied to the primary first principle characteristics and the developed characteristics to determine the equivalency factors. In one embodiment, if developed characteristics are utilized, step 116 through step 122 may be repeated in an iterative fashion until the level of model accuracy desired is achieved.
  • Referring now to FIG. 2, one embodiment 200 of determining primary first principle characteristics 106 is shown. At step 202, the effect of each characteristic on the variation in the Target Variable between industrial facilities is determined. In one embodiment, the method is iteratively repeated, and an analysis model can be used to determine the effect of each characteristic. In another embodiment, a correlation matrix can be used. The effect of each characteristic may be expressed as a percentage of the total variation in the Target Variable in the initial data set. At step 204, each characteristic is ranked from highest to lowest based on its effect on the Target Variable. It will be understood by those skilled in the art that other ranking criteria could be used.
  • At step 206, the characteristics may be grouped into one or more categories. In one embodiment, the characteristics are grouped into three categories. The first category contains characteristics that effect a Target Variable at a percentage less than a lower threshold (for example, 5%). The second category are those characteristics with a percentage between the lower percentage and a second threshold (for example, 5% and 20%). The third category are those characteristics with a percentage over the second threshold (for example, 20%). Additional or fewer categories and different ranges are also possible.
  • At step 208, those characteristics with Target Variable average variation below a specific threshold may be removed from the list of characteristics. For example, this could include those characteristics in the first category (e.g., those characteristics with a percentage of less than 5%). It will be understood by those skilled in the art that other thresholds could be used, and multiple categories could be removed from the list of characteristics. In one embodiment, if characteristics are removed, the process is repeated starting at step 202 above. In another embodiment, no characteristics are removed from the list until determining whether another co-variant relationships exist, as described in step 212 below.
  • At step 210, the relationships between the mid-level characteristics are determined. Mid-level characteristics are characteristics that have a certain level of effect on the Target Variable, but individually do not influence the Target Variable in a significant manner. Using the illustrative categories, those characteristics in the second category are mid-level characteristics. Example relationships between the characteristics are co-variant, dependent, and independent. A co-variant relationship occurs when modifying one characteristic causes the Target Variable to vary, but only when another characteristic is present. For instance, in the scenario where characteristic “A” is varied, which causes the Target Variable to vary, but only when characteristic “B” is present, then “A” and “B” have a co-variant relationship. A dependent relationship occurs when a characteristic is a derivative of or directly related to another characteristic. For instance, when the characteristic “A” is only present when characteristic “B” is present, then A and B have a dependent relationship. For those characteristics that are not co-variant or dependent, they are categorized as having independent relationships.
  • At step 212, characteristics displaying dependence on each other may be resolved to remove dependencies and high correlations. There are several potential methods for resolving dependencies. Some examples include: (i) grouping multiple dependent characteristics into a single characteristic, (ii) removing all but one of the dependent characteristics, and (iii) keeping one of the dependent characteristics, and creating a new characteristic that is the difference between the kept characteristic and the other characteristics. After the dependencies are removed, the process may be repeated from step 202. In one embodiment, if the difference variable is insignificant it can be removed from the analysis in the repeated step 208.
  • At step 214, the characteristics are analyzed to determine the extent of the inter-relationships. In one embodiment, if any of the previous steps resulted in repeating the process, the repetition should be conducted prior to step 214. In some embodiments, the process may be repeated multiple times before continuing to step 214.
  • At 216, the characteristics that result in less than a minimum threshold change in the impact on Target Variable variation caused by another characteristic are dropped from the list of potential characteristics. An illustrative threshold could be 10%. For instance, if the variation in Target Variable caused by characteristic “A” is increased when characteristic “B” is present; the percent increase in the Target Variable variation caused by the presence of characteristic “B” must be estimated. If the variation of characteristic “B” is estimated to increase the variation in the Target Variable by less than 10% of the increase caused by characteristic “A” alone, characteristic “B” can be eliminated from the list of potential characteristics. Characteristic “A” can also be deemed then to have an insignificant impact on the Target Variable. The remaining characteristics are deemed to be the primary characteristics.
  • Referring now to FIG. 3, an example embodiment 300 for developing constraints for equivalency factors is shown. Constraints are developed on the equivalency factors, step 302. The objective function, as described below, is optimized to determine an initial set of equivalency factors, step. 304.
  • At step 306 the percent contribution of each characteristic to the target variable is calculated. There are several methods of calculating the percent contribution of each characteristic. One method is the “Average Method,” which is a two step process where the Total Average Impact is calculated and then the percent contribution of each characteristic is calculated. To calculate the Total Average Impact, the absolute values of the equivalency factors times the average value of each characteristic are summed as shown below:
    Average Method Equation: TAI=Σ jj *avg j(F ij)
      • TAI=Total Average Impact
      • i=individual record referring to the facility
      • j=individual first principle or developed characteristic
      • αj=equivalency faction for the jth characteristic
      • F=is a function of the measured first principle characteristics or developed characteristic for a facility. In the case where the first principle characteristic is used directly, F may be 1 * characteristics. In the case of a developed characteristic, F can be any function of the first principle characteristic(s) and other developed characteristic(s).
      • avgj (Fij)=the average value of the measured first principle characteristics or developed characteristic over all facilities (over all j) in the analysis dataset
  • Following the calculation of the Total Average Impact, the percent contribution of each characteristic is then calculated as shown below: Percent Contribution Equation : AI j = α j * avg j ( F ij ) TAI
      • AIj=Average Impact of jth first principle or developed characteristic
  • An alternate method is the “Summation of Records Method,” which calculates the percent contribution of each characteristic by calculating the individual impacts from a summation of the impacts at each individual data record in the analysis dataset of facilities as shown below:
    Summation of Records Equation: AIj=average over all i [|αj *F ij|/Σkk *F ik|)
      • AIj=Average Impact of jth first principle or developed characteristic
      • i=the individual record referring to the facility
      • j=individual first principle or developed characteristic
      • k=individual first principle or developed characteristic
      • αj=equivalency faction for the jth characteristic
      • F=is a function of the measured first principle characteristics or developed characteristic for a facility.
  • The Summation of Records Method may be used if non-linearity exists in the impacts. It is contemplated that other methods to calculate impacts may be used.
  • With the individual percent contributions developed, the method proceeds to step 308, where each percent contribution is compared against expert knowledge. Domain experts will have an intuitive or empirical feel for the relative impacts of key characteristics to the overall target value. The contribution of each characteristic is judged against this expert knowledge.
  • At step 310 a decision is made about the acceptability of the individual contributions. If the contribution are found to be unacceptable the process continues to step 312. If they are found to be acceptable the process continues to step 316.
  • At step 312, a decision is made to address how the unacceptable results of the individual contributions are to be handled. The options are to adjust the constraints on the equivalency factors to affect a solution, or to decide that the characteristic set chosen can not be helped through constraint adjustment. If the developer gives up on constraint adjustment then the process proceeds to step 316. If the decision is made to achieve acceptable results through constraint adjustment then the process continues to step 314.
  • At step 314, the constraints are adjusted to increase or decrease the impact of individual characteristics in an effort to obtain acceptable results from the individual contributions. The process continues to step 302 with the revised constraints.
  • At step 316, peer and expert review of the equivalency factors developed may be performed to determine the acceptability of the equivalency factors developed. If the factors pass the expert and peer review, the process continues to step 326. If the equivalency factors are found to be unacceptable, the process continues to step 318.
  • At step 318, new approaches and suggestions for modification of the characteristics are developed by working with experts in the particular domain. This may include the creation of new developed characteristics, or the addition of new first principle to the analysis data set. At step 320, a determination is made as to whether data exists to support the investigation of the approaches and suggestions for modification of the characteristics. If the data exists, the process proceeds to step 324. If the data does not exist, the process proceeds to step 322.
  • At step 322, additional data is collected and obtained in an effort to attempt the corrections required to obtain a satisfactory solution. At step 324, the set of characteristics are revised in view of the new approaches and suggestions.
  • At step 326, the reasoning behind the selection of characteristics used is documented. This documentation can be used in explaining results for use of the equivalency factors.
  • Referring to FIG. 4, an example matrix 10 of a system for determining equivalency factors is illustrated. While matrix 10 can be expressed in many configurations, in this particular example, matrix 10 is constructed with the first principle characteristics 12 and developed characteristics 14 on one axis, and the different facilities 16 for which data has been collected on the other axis. For each first principle characteristic 12 at each facility 16, there is the actual data value 18. For each first principle characteristic 12 and developed characteristic 14, there is the equivalency factor 22 that will be computed with the optimization model. The constraints 20 limit the range of the equivalency factors 22. Constraints can be minimum or maximum values, or other mathematical functions or algebraic relationships. Moreover, constraints can be grouped and further constrained. Additional constraints on facility data, and relationships between data points similar to those used in the data validation step, and constraints of any mathematical relationship on the input data can also be employed. In one embodiment, the constraints to be satisfied during optimization apply only to the equivalency factors.
  • The target variable (actual) column 24 are the actual values of the target variable as measured for each facility. The target variable (predicted) column 26 are the values for the target value as calculated using the determined equivalency factors. The error column 28 are the error values for each facility as determined by the optimization model. The error sum 30 is the summation of the errors in error column 28. The optimization analysis, which comprises the Target Variable equation and an objection function, solves for the equivalency factors to minimize the error sum 30. In the optimization analysis, the equivalency factors (αj) are computed to minimize the error (εi) over all facilities. The non-linear optimization process determines the set of equivalency factors that minimizes this equation for a given set of first principle characteristics, constraints, and a selected value.
  • The Target Variable is computed as a function of the characteristics and the yet to be determined equivalency factors. The Target Variable equation is expressed as: Target Variable equation : TV i = j α j f ( characteristic ) ij + ɛ i
      • TVi is the measured Target Variable for facility i
      • characteristic is a first principle characteristic
      • i is the facility number
      • j is the characteristic number
      • αj is the jth equivalency factor
      • εi is the error of the model's TV prediction as defined by: Actual TV value—Predicted TV value for facility i
  • The objective function has the general form: Objective Function : Min [ i = 1 m ɛ i p ] 1 / p , p 1
      • i is the facility
      • m is the total number of facilities
      • p is a selected value
  • One common usage of the general form of objective function is for minimization of the absolute sum of error by using p=1 as shown below: Objective Function : Min [ i = 1 m ɛ i ]
  • Another common usage of the general form of objective function is using the least squares version corresponding to p=2 as shown below: Objective Function : Min [ i = 1 m ɛ i 2 ] 1 / 2
  • Since the analysis involves a finite number of first principle characteristics and the objective function form corresponds to a mathematical norm, the analysis results are not dependent on the specific value of p. The analyst can select a value based on the specific problem being solved or for additional statistical applications of the objective function. For example, p=2 is often used due to its statistical application in measuring data and target variable variation and target variable prediction error.
  • A third form of the objective function is to solve for the simple sum of errors squared as given in Equation 5 below. Objective Function : Min [ i = 1 m ɛ i 2 ]
  • While several forms of the objective function have been shown, other forms of the objective function for use in specialized purposes could also be used. Under the optimization analysis, the determined equivalency factors are those equivalency factors that result in the least difference between the summation and the actual value of the Target Variable after the model iteratively moves through each facility and characteristic such that each potential equivalency factor, subject to the constraints, is multiplied against the data value for the corresponding characteristic and summed for the particular facility.
  • For illustrative purposes, a more specific example of the system and method for determining equivalency factors for use in comparative performance analysis as illustrated in FIGS. 1-3 is shown. The example will be shown with respect to a major process unit in most petroleum refineries, known as a Fluidized Catalytic Cracking Unit (Cat Cracker). A Cat Cracker cracks long molecules into shorter molecules in the gasoline boiling range and lighter. The process in conducted at very high temperatures in the presence of a catalyst. In the process of cracking the feed, coke is produced and deposited on the catalyst. The coke is burned off the catalyst to recover heat and to reactivate the catalyst. The Cat Cracker has several main sections: Reactor, Regenerator, Main Fractionator, and Emission Control Equipment. Refiners desire to compare the performance of their Cat Crackers to the performance of Cat Crackers operated by their competition. This Cat Cracker example is for illustrative purposes and may not represent the actual results of applying this methodology to Cat Crackers, or any other industrial facility. Moreover, the Cat Cracker example is but one example of many potential applications of the used of this invention in the refining industry.
  • First, at step 102, the desired Target Variable will be “Cash Operating Costs” or “Cash OPEX” in a Cat Cracker facility. At step 104, the first principle characteristics that may affect Cash Operating Costs for a Cat Cracker might be:
    Feed Quality Feed Capacity Emission Control Equipment
    Regenerator Staff Training Main Fractionator Design
    Design
    Staff Experience Trade Union Maintenance Practices
    Location Reactor Temperature Regenerator Temperature
    Age of Unit Duplicate Equipment Degree of Feed Preheat
    Catalyst Type Reactor Design
  • To determine the primary characteristics, step 106, this example has determined the effect of the first characteristics. For this example, the embodiment for determining primary characteristics as shown in FIG. 2 will be used. Moving to FIG. 2, at step 202, each characteristic is given an variation percentage. At step 204, the characteristics from the Cat Cracker Example are rated and ranked. The following chart shows the relative influence and ranking for the example characteristics:
    Characteristics Category Comment
    Feed Quality
    3 Several aspects of feed quality are key
    Catalyst Type
    3 Little effect on costs, large impact on yields
    Reactor Design
    1 Several key design factors are key
    Regenerator Design
    3 Several design factors are key
    Staffing Levels
    2
    Feed Capacity 1 Probably single-most highest impact
    Emission Control Equipment 2 Wet versus dry is a key difference
    Staff Experience
    3 Little effect on costs
    Staff Training
    2 Little effect on costs
    Main Fractionator Design 3 Little effect on costs, large impact on yields
    Location
    3 Previous data analysis shows this
    characteristic has little effect on costs
    Trade Union
    3 Previous data analysis shows this
    characteristic has little effect on costs
    Maintenance Practices
    2 Effect on reliability and “lost
    opportunity cost”
    Age of Unit 2 Previous data analysis shows this
    characteristic has little effect on costs
    Reactor Temperature
    3 Little effect on costs
    Regenerator Temperature 3 Little effect on costs
    Duplicate Equipment 3 Little effect on costs
  • In this embodiment, the categories are as follows:
    Percent of Average Variation
    in the Target Variable
    Between Facilities
    Category 1 (Major Characteristics) >20%
    Category 2 (Midlevel Characteristics) 5-20%
    Category 3 (Minor Characteristics)  <5%
  • It is understood that other embodiments could have any number of categories and that the percentage values that delineate between the categories may be altered in any manner.
  • Based on the above example rankings, the characteristics are grouped according to category, step 206. At step 208, those characteristics in Category 3 are discarded as being minor. Characteristics in Category 2 must be analyzed further to determine the type of relationship they exhibit with other characteristics, step 210. Each is classified as exhibiting either co-variance, dependence or independence, step 212. As an example:
  • Classification of Category 2 Characteristics Based on Type of Relationship
    Category
    2 Type If Co-variant
    characteristics of Relationship or Dependent, Related Partner(s)
    Staffing Levels Independent
    Emission Equipment Co-variant Maintenance Practice
    Maintenance Practices Co-variant Staff Experience
    Age of Unit Dependent Staff Training
    Staff Training Co-variant Maintenance Practice
  • At step 214, the degree of the relationship of these characteristics is analyzed. Using this embodiment for the Cat Cracker example: Staffing levels, classified as having an Independent relationship, stays in the analysis process. Age of Unit is classified as having a dependent relationship with Staff Training. A dependent relationship means Age of Unit is a derivative of Staff Experience or vice versa. After further consideration, it is decided Age of Unit can be dropped from the analysis and the broader characteristic of Staff Training will remain in the analysis process. The three characteristics classified as having a co-variant relationship, Staff Training, Emission Equipment, Maintenance Practices, must be examined to determine the degree of co-variance.
  • It is determined that the change in Cash Operating Costs caused by the variation in Staff Training is modified by more than 30% by the variation in Maintenance Practices. Along the same lines, the change in Cash Operating Costs caused by the variation in Emission Equipment is modified by more than 30% by the variation in Maintenance Practices. Therefore, Maintenance Practices, Staff Training and Emission Equipment are retained in the analysis process.
  • It is also determined that the change in Cash Operating Costs caused by the variation in Maintenance Practice is not modified by more than the selected threshold of 30% by the variation in Staff Experience. Therefore, Staff Experience can be dropped from the analysis.
  • Continuing with the Cat Cracker example, and returning to FIG. 1, the remaining characteristics are categorized as continuous, ordinal or binary type measurement, step 108.
  • Classification of Remaining Characteristics Based on Measurement Type
    Remaining characteristics Measurement Type
    Staffing Levels Continuous
    Emission Equipment Binary
    Maintenance Practices Ordinal
    Staff Training Continuous

    In this Cat Cracker example: Maintenance Practices have an “economy of scale” relationship with Cash Operating Costs (which is the Target Variable). So the improvement in Target Variable improves at a decreasing rate as Maintenance Practices Improve. Based on historical data and experience, a complexity factor is assigned to reflect the economy of scale. In this particular example, a factor of 0.6 is selected.
  • As an example of coefficients, the complexity factor is often estimated to follow a power curve relationship. Using Cash Operating Costs as an example of a characteristic that typically exhibits an “economy of scale;” the effect of Maintenance Practices can be described with the following: Target Variable facility A = ( Capacity facilityA Capacity facilityB ) Complexity Factor * Target Variable facilityB
  • At step 110, a data collection classification system is developed. In this example, a questionnaire is developed to measure how many of ten key Maintenance Practices are in regular use at each facility. A system of definitions are used so that data is collected in a consistent manner. The data in terms of number of Maintenance Practices in regular use is converted to a Maintenance Practices Score using the 0.6 factor and “economy of scale” relationship as illustrated in the following table.
  • Maintenance Practices Score
  • Number Maintenance Maintenance
    Practices In Regular Use Practices Score
    1 1.00
    2 1.52
    3 1.93
    4 2.30
    5 2.63
    6 2.93
    7 3.21
    8 3.48
    9 3.74
    10 3.98
  • For illustrative purposes with respect to the Cat Cracker example, at step 112, data was collected and, at step 114, validated as follows:
  • Cat Cracker Data
  • Cash
    Reactor Staff Staffing Emission Feed Maintenance Operating
    Design Training Levels Equipment Capacity Practices Cost
    Unit of Measurement
    Man Number Yes = 1 Barrels Dollars
    Score Weeks People No = 0 per Day Score per Barrel
    Facility #
    1 1.50 30 50 1 45 3.74 3.20
    Facility #2 1.35 25 28 1 40 2.30 3.33
    Facility #3 1.10 60 8 0 30 1.93 2.75
    Facility #4 2.10 35 23 1 50 3.74 4.26
    Facility #5 1.00 25 5 0 25 2.63 2.32
  • Constraint ranges were developed for each characteristics by the expert team to control the model so that the results are within a reasonable range of solutions.
  • Cat Cracker Model Constraint Ranges
  • Reactor Staffing Emission Maintenance
    Design Staff Training Levels Equipment Practices Feed Capacity
    Minimum −3.00 −3.00 −1.0 −1.0 0.0 0.0
    Maximum 0.00 1.00 40 0.0 4.0 4.0
  • At step 116, the results of the model optimization runs are shown below.
  • Model Results
  • Characteristics Equivalency Factors
    Reactor Design −0.9245
    Staff Training −0.0021
    Staffing Levels −0.0313
    Emission Equipment 0.0000
    Maintenance Practices 0.0000
    Feed Capacity 0.1382
  • The model indicates Emission Equipment and Maintenance Practices are not significant drivers of variations in Cash Operating Costs between different Cat Crackers. This is indicated by the model finding zero values for equivalency factors for these two characteristics. Reactor Design, Staff Training, and Emission Equipment are found to be significant drivers.
  • In the case of both Emission Equipment and Maintenance Practices, the experts agree it is reasonable that these characteristics are not significant in driving variation in Cash Operating Cost. The experts feel there is a dependence effect not previously identified that fully compensates for the impact of Emission Equipment and Maintenance Practices.
  • A sample model configuration for the illustrative Cat Cracker example is shown in FIG. 5. The data 18, actual values 24, and the resulting equivalency factors 22 are shown. In this example, the error sum 30 is minimal, so developed characteristics are not necessary in this instance. In other examples, an error sum of differing values may be significant, and result in having to determine developed characteristics.
  • For additional illustrative purposes, a more specific example of the system and method for determining equivalency factors for use in comparative performance analysis as illustrated in FIGS. 1-3 is shown. The example will be shown with respect to pipelines and tank farms terminals. Pipelines and tank farms are assets used by industry to store and distribute liquid and gaseous feedstocks and products. The example is illustrative for development of equivalence factors for:
      • a. pipelines and pipeline systems alone
      • b. tank farm terminals alone
      • c. any combination of pipelines, pipeline systems and tank farm terminals.
        This example is for illustrative purposes and may not represent the actual results of applying this methodology to any particular pipeline and tank farm terminal, or any other industrial facility.
  • First, at step 102, the desired Target Variable will be “Cash Operating Costs” or “Cash OPEX” in a pipeline asset. At step 104, the first principle characteristics that may affect Cash Operating Costs might be:
    Pipeline Related Characteristics Tank Terminal Characteristics
    Type of Fluid Transported Fluid Class
    Average Fluid Density Number of Tanks
    Number of Input and Output Total Number of Valves in Terminal
    Stations
    Total Installed Capacity Total Nominal Tank Capacity
    Total main pump driver KW Annual Number of Tank Turnovers
    Length of pipeline Tank Terminal Replacement Value
    Altitude change in pipeline
    Total Utilized Capacity
    Pipeline Replacement Value
    Pump Station Replacement Value
  • To determine the primary first principle characteristics, step 106, this example has determined the effect of the first characteristics. For this example, the embodiment for determining primary characteristics as shown in FIG. 2 will be used. Moving to FIG. 2, at step 202, each characteristic is given an impact percentage. This analysis shows that the pipeline replacement value and tank terminal replacement value that are used widely in the industry are characteristics that are dependent on more fundamental characteristics. Accordingly, in this instance, those values are removed from consideration for primary first principle characteristics. At step 204, the characteristics from are rated and ranked. The following chart shows the relative impact and ranking for the example characteristics:
    Characteristics Category Comment
    Type of Fluid Transported 2 products and crude
    Average Fluid Density 3 affects power consumption
    Number of Input and 1 more stations means
    Output Stations more cost
    Total Installed Capacity 3 surprisingly minor affect
    Total Main Pump Driver KW 1 power consumption
    Length of pipeline 3 no affect
    Altitude change in pipeline 3 small affect by related to KW
    Total Utilized Capacity 3 no effect
    Pipeline Replacement
    3 industry standard has
    Value no effect
    Pump Station
    3 industry standard has
    Replacement Value little effect
    Fluid Class
    3 no effect
    Number of Tanks 2 important tank farm parameter
    Total Number of Valves 3 no effect
    in Terminal
    Total Nominal Tank Capacity 2 important tank farm parameter
    Annual Number of 3 no effect
    Tank Turnovers
    Tank Terminal
    3 industry standard has
    Replacement Value little effect
  • In this embodiment, the categories are as follows:
    Percent
    of Average
    Variation in the
    Target Variable
    Between Facilities
    Category 1 (Major Characteristics) >15%
    Category 2 (Midlevel Characteristics) 7-15%
    Category 3 (Minor Characteristics)  <7%

    It is understood that other embodiments could have any number of categories and that the percentage values that delineate between the categories may be altered in any manner.
  • Based on the above example rankings, the characteristics are grouped according to category, step 206. At step 208, those characteristics in Category 3 are discarded as being minor. Characteristics in Category 2 must be analyzed further to determine the type of relationship they exhibit with other characteristics, step 210. Each is classified as exhibiting either co-variance, dependence or independence as show below:
  • Classification of Category 2 Characteristics Based on Type of Relationship
  • If Co-variant or
    Category 2 Type of Dependent,
    characteristics Relationship Related Partner(s)
    Type of Fluid Transported Independent
    Number of Input and Output Stations Independent
    Total Main Pump Driver KW Independent
    Number of Tanks Independent
    Total Nominal Tank Capacity Independent
  • At step 212 the dependent characteristics are resolved. In this example, there are no dependent characteristics that need to be resolved. At step 214, the degree of the co-variance of the remaining characteristics are analyzed and no characteristics are dropped.
  • The remaining variables were deemed to be primary characteristics in step 218.
  • Continuing with the Pipeline and Tank Farm example, and returning to FIG. 1, the remaining characteristics are categorized as continuous, ordinal or binary type measurement, step 108.
  • Classification of Remaining characteristics Based on Measurement Type Remaining characteristics Measurement Type
  • Remaining characteristics Measurement Type
    Type of Fluid Transported Binary
    Number of Input and Output Stations Continuous
    Total Main Pump Driver KW Continuous
    Number of Tanks Continuous
    Total Nominal Tank Capacity Continuous
  • At step 110, a data collection classification system is developed. In this example a questionnaire is developed to collect information from participating facilities on the measurements above.
  • At step 112, data was collected and, at step 114, validated as follows:
  • Pipe Line and Tank Farm Data
  • Characteristic
    Number
    of Input
    Type and Output Total Main Number Total Nominal
    of Fluid Stations Pump Driver of Tanks Tank Capacity
    Measurement Units
    1 = Product
    2 = Crude Count KW Count KMT
    Facility
    1 1 8 74.0 34 1,158
    Facility 2 2 16 29.0 0 0
    Facility 3 1 2 5.8 7 300
    Facility 4 1 5 4.9 6 490
    Facility 5 1 2 5.4 8 320
    Facility 6 2 2 2.5 33 191
    Facility 7 1 3 8.2 0 0
    Facility 8 2 2 8.7 0 0
    Facility 9 1 3 15.0 10 180
    Facility 10 1 9 12.0 22 860
    Facility 11 1 4 20.0 5 206
    Facility 12 2 9 9.3 0 0
    Facility 13 2 12 6.2 0 0
    Facility 14 1 5 41.4 19 430
    Facility 15 2 8 8.2 0 0
    Facility 16 1 8 96.8 31 1,720
    Facility 17 1 2 15.0 8 294
  • In Step 116, constraints were also developed on the equivalency factors by the expert as given below.
  • Equivalency Factor Constraints
  • Number Total
    of Input Nominal
    Type and Output Total Main Number Tank
    of Fluid Stations Pump Driver of Tanks Capacity
    Minimum
    0 0 0 134 0
    Maximum 2000 700 500 500 100
  • At step 116, the results of the model optimization runs are shown below.
  • Model Results
  • Characteristics Equivalency Factors
    Type of Fluid Transported 1301.1
    Number of Input and Output Stations 435.4
    Total Main Pump Driver KW 170.8
    Number of Tanks 134.0
    Total Nominal Tank Capacity 6.11
  • In step 118 it was determined that there was no need for developed characteristics for this example. Thus the final equivalency factors are those determined in the analysis model step above.
  • FIG. 6 shows the analysis performed on the pipeline and tank farm example. This example shows but one of many potential applications of this invention to the pipeline and tank farm industry.
  • It is understood that this methodology could be applied to many different industries and facilities. For example, this methodology could be applied to the power generation industry (such as developing equivalency factors for predicting operating expense for single cycle and combined cycle generating stations that generate electrical power from any combination of boilers, steam turbine generators, combustion turbine generators and heat recovery steam generators). In another example, this methodology could be applied to develop equivalency factors for predicting the annual cost for ethylene manufacturers of compliance with environmental regulations associated with continuous emissions monitoring and reporting from ethylene furnaces. In one embodiment, the equivalency factors would apply to both environmental applications and chemical industry applications.
  • Once equivalency factors have been developed, the factors can be utilized to allow comparison of any one facility's data to another or to compare data across multiple facilities in an industry segment. Referring now to FIG. 7, an example embodiment 700 for using equivalency factors to establish a standard to be used for comparison between facilities is shown.
  • At step 702, the gap for all facilities are calculated. The gap is calculated by first determining the predicted value using the equivalency factors. This predicted value may be referred to as the “Equivalent Value” or “EV”. The different between the actual Target Value and the Equivalent value is the gap for a particular facility as calculated in accordance with the following equations: EV i = j = 1 α j F ij Gap i =TV i −EV i
  • At step 704, the ratio of target variable to equivalent is calculated and plotted. In one embodiment, a piano chart can be used for analysis of comparative performance. An example piano chart for the generation example is given in FIG. 8. The equations below are used to develop this information.
    PR i =TV i /EV i
      • PRi=Performance Ratio of facility i
      • TVi=Actual Target Value of facility i
      • EVi=Equivalent Value of facility i
        The set of performance ratios in the analysis are then rank ordered from low to high and plotted on the piano chart for discussion with individual participant's facilities.
  • It is recognized that the actual gap could be used in a similar manner and use of gap rather than ratio is included in this disclosure. Using a ratio permits the “hiding” of gap information while still providing to peers in the study a qualitative value for comparative performance.
  • At step 706, the rank ordered list of ratios is used to determine membership in performance subgroups. Subgroups can be established as any fraction of the total participants. Typical subgroups include:
      • a. Halves (top and bottom)
      • b. Quartiles (1st, 2nd, 3rd and 4th quartiles)
      • c. Deciles (1st through 10th deciles)
        Participants are advised of the rank membership, and their actual position on the piano chart is indicated.
  • At step 708, a customized set of one or more facilities can optionally be selected as the standard for a comparison of all records to be included in the analysis. At this point the facilities to be selected for the measurement standard group for this analysis are arbitrary. Typical value selections include:
      • the predicted equivalent value EV
      • the average of all values for each characteristic
      • the combined average for a set of one or more facilities demonstrating the maximum performance ratio
      • the combined average for a set of one or more facilities demonstrating a minimum performance ratio
      • the combined average for a set of one or more facilities contained in any of the performance subgroups
      • the combined average for a set of one or more facilities demonstrating the lowest performance ratio or most positive gap
      • the combined average of a set from a geographic or economic subset
      • a set of facilities that the customer considers to be their competitors
      • a set of facilities of equal size and complexity
      • any criteria selected to achieve the desired comparison
  • At step 710, the set of facilities selected as the benchmark are combined into one single benchmark point. In one embodiment, this can be accomplished by taking the average of the target value of the facilities selected as the benchmark and the average of each characteristic as the single benchmark facility.
  • At step 712, for each facility, the benchmark is adjusted to the actual characteristic values of each individual facility as shown below:
    Equiv 2-1 =TV 2 *EV 1 /EV 2
  • At step 714, the gap between the performance of each individual facility in the peer group is calculated from the performance of the adjusted benchmark, and the actual performance of the target facility as shown below:
    GAP i =Equiv 2-1 −TV(actual) i
  • For illustrative purposes, two facilities will be compared using the equivalency factors developed in the power generation industry. First, the equivalency factors must be developed. The following data will be used for determining the equivalency factors.
  • Initial Characteristics
    HRSG count of heat recovery steam generators
    CTG count of combustion turbine generators
    STG count of steam turbine generators
    BOIL count of combustion boilers
    NDC net dependable capacity
    SVC Factor fraction of hours in the year that the facility is operated
    NetMWH megawatts generated in a year
    PurGas yearly economic value of purge gas
    PurLiquid yearly economic value of purge liquid
    ACTStarts actual count of starts in a year
    NCF Net Capacity Factor
    NOF Net Operating Factor
  • The primary characteristics for use were determined to be the following:
  • Primary Characteristics
    C2 (a developed characteristic) HRSG + STG + BOIL
    NDC net dependable capacity
    SVC Factor fraction of hours in
    the year that the facility is
    operated
    C3 (a developed characteristic) NCF-NOF
  • The equivalency factors are developed using the collected data, which results in the following:
  • Equivalancy Factors
    C2 674.3
    NDC 10.4
    SVC Factor 440.7
    C3 −46.0
  • Below is the example data for two facilities to be compared.
    Target SVC
    Variable C2 NDC Factor C3
    Facility
    1 $6,690 7.0 470 1.00 0.0
    Facility 2 $2,082 1.0 97 0.979 −1.92
  • The first step is to pick one of the facilities as the standard. For this example, Facility 1 will be used.
  • Using the developed equivalency factors, Facility 2's values are modified to place it on the same basis as Facility 1. This is done by multiplying the Facility 2 data by the ratio of predicted target variable values.
    EV 1=(674.3)(7)+(10.4)(470)+(440.7)(1.000)+(−46.0)(0.00)=10,048.8
    EV 2=(674.3)(1)+(10.4)(97)+(440.7)(0.979)+(−46.0)(−1.92)=2,202.9
    Now converting Facility 2 Target Value to compare with Facility, the ratio of the Equivalent values as shown below is used.
    Equiv 2-1=$2,202*10,048.8/2,202.9=$9,497.5
  • Facility 1's target value can now be compared to that of Facility 2. The difference is $9,497.5−$6,690=$2,807.5. Facility 1 is operating at a lower OPEX than Facility 2. The difference may represent a gap closure opportunity for Facility 2, if the reasons for the lower OPEX in Facility 1 can be determined.
  • The gap of each facility to the analysis set average performance can also be determined from the equation below. For the current example the gap can be calculated as shown below:
    GAP 1=$10,048.8−$6,690=+$3,358.8
    GAP 2=$2,202.9−$2,082=+$120.9
  • This procedure can be expanded to the entire population of 2 or more facilities to be included in the study.
  • Referring to FIG. 9, an illustrative node 40 for implementing the method is depicted. Node 40 can be any form of computing device, including computers, workstations, hand helds, mainframes, embedded computing device, holographic computing device, biological computing device, nanotechnology computing device, virtual computing device and or distributed systems. Node 40 includes a microprocessor 42, an input device 44, a storage device 46, a video controller 48, a system memory 50, and a display 54, and a communication device 56 all interconnected by one or more buses or wires or other communications pathway 52. The storage device 46 could be a floppy drive, hard drive, CD-ROM, optical drive, bubble memory or any other form of storage device. In addition, the storage device 42 may be capable of receiving a floppy disk, CD-ROM, DVD-ROM, memory stick, or any other form of computer-readable medium that may contain computer-executable instructions or data. Further communication device 56 could be a modem, network card, or any other device to enable the node to communicate with humans or other nodes.
  • While the invention has been shown and described with reference to the preferred embodiment thereof, it will be understood by those skilled in the art that various changes in form and detail may be made therein without departing from the spirit and scope of the invention.

Claims (30)

1. A method for determining equivalency factors in an industrial facility, comprising:
determining a target variable;
determining a plurality of characteristics of the target variable;
classifying the plurality of characteristics;
collecting data with respect to the characteristics;
determining an equivalency factor for each of the plurality of characteristics using an optimization model.
2. The method of claim 1, wherein the optimization model is any non-linear optimization method.
3. The method of claim 1, wherein the optimization model is a linear optimization method.
4. The method of claim 1, further comprising:
determining a percentage variation value for each of the plurality of characteristics;
dividing the plurality of characteristics into at least two categories based on the percentage variation value; and
grouping characteristics in one of the at least two categories based on a relationship of the characteristics.
5. The method of claim 1, further comprising:
dividing the plurality of characteristics into a first category, a second category and a third category;
determining a relationship between the characteristics in the first category; and
grouping the characteristics in the first category that have a common relationship.
6. The method of claim 1, further comprising:
creating a developed characteristic by determining a mathematical relationship between a first one of the plurality of characteristics and a second one of the plurality of characteristics.
7. The method of claim 1, further comprising:
using the equivalency factor to compare a first facility and a second facility.
8. The method of claim 1, further comprising:
adjusting a target variable of a first facility using the equivalency factor;
adjusting a target variable of a second facility using the equivalency factor; and
comparing the adjusted target variable of the first facility against the adjusted target variable of the second facility.
9. The method of claim 1, further comprising:
selecting a benchmark facility.
10. The method of claim 9, further comprising:
calculating a performance gap value between a first facility and the benchmark facility.
11. The method of claim 1, further comprising:
calculating a performance gap value between a first facility and a second facility using the equivalency factor.
12. The method of claim 1, further comprising:
classifying a first facility into a performance subgroup in accordance with the ratio of the first facility's actual target variable to the first facility's actual target variable adjusted using the equivalency factor.
13. The method of claim 1, further comprising:
ranking a first facility and a second facility in accordance with the first facility's actual target variable adjusted using the equivalency factor and the second facility's actual target variable adjusted using the equivalency factor.
14. The method of claim 1, further comprising:
calculating performance gaps using subgroups derived through the use of the equivalency factor.
15. A method for determining equivalency factors, comprising:
determining a target variable;
determining a plurality of characteristics of the target variable;
determining a percentage variation value for each of the plurality of characteristics;
dividing the plurality of characteristics based on the percentage variation value into a first category, a second category and a third category;
determining a relationship between the characteristics in the first category;
grouping the characteristics in the first category that have a common relationship;
classifying the characteristics in the second category and the grouped characteristics;
combining the grouped characteristics and the characteristics in the second category;
collecting data with respect to the combined characteristics;
creating at least one developed characteristic by determining a mathematical relationship between a first one of the combined characteristics and a second one combined characteristics; and
using a non-linear optimization model to determine equivalency factors by reducing an error value between an actual value of the target variable and a predicted value of the target variable using collected data of the combined characteristics and the at least one developed characteristic.
16. A system for determining equivalency factors, comprising:
a target variable for an industrial facility;
a plurality of characteristics of the target variable;
data for each of the plurality of characteristics; and
a computer-readable medium comprising a plurality of instructions for execution by at least one computer processor, the instructions for:
determining a mathematical relationship between a first one of the combined characteristics and a second one combined characteristics; and
reducing an error value between an actual value of the target variable and a predicted value of the target variable using the data of the combined characteristics and the at least one developed characteristic.
17. The system of claim 16, wherein the target variable for an industrial facility is a target variable for a refining facility.
18. The system of claim 16, wherein the target variable for an industrial facility is a target variable for a petrochemical facility.
19. The system of claim 16, wherein the target variable for an industrial facility is a target variable for a pipeline facility.
20. The system of claim 16, wherein the target variable for an industrial facility is a target variable for a pipeline system.
21. The system of claim 16, wherein the target variable for an industrial facility is a target variable for a tank farm facility.
22. The system of claim 16, wherein the target variable for an industrial facility is a target variable for a combined pipeline and tank farm facility.
23. The system of claim 16, wherein the target variable for an industrial facility is a target variable for a power generating facility.
24. The system of claim 16, wherein the target variable for an industrial facility is a target variable for a power distribution facility.
25. The system of claim 16, wherein the target variable for an industrial facility is a target variable for a Olefins plant.
26. The system of claim 16, wherein the target variable for an industrial facility is a target variable for a chemical manufacturing facility.
27. The system of claim 16, wherein the target variable for an industrial facility is a target variable for an environmental aspect.
28. The system of claim 16, wherein the target variable is the total operating expense of an industrial facility.
29. The system of claim 16, wherein the target variable is the operating cost of an industrial facility.
30. The system of claim 16, wherein the target variable is a financial result of operation of an industrial facility.
US10/913,728 2003-08-07 2004-08-09 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities Abandoned US20050038667A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US10/913,728 US20050038667A1 (en) 2003-08-07 2004-08-09 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities
US11/075,626 US7693725B2 (en) 2003-08-07 2005-03-08 Method and system for greenhouse gas emissions performance assessment and allocation
US11/488,266 US7233910B2 (en) 2003-08-07 2006-07-18 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities
US11/732,037 US20080201181A1 (en) 2003-08-07 2007-04-02 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US49315003P 2003-08-07 2003-08-07
PCT/US2004/025532 WO2005015476A2 (en) 2003-08-07 2004-08-06 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities
WOPCT/US04/25532 2004-08-06
US10/913,728 US20050038667A1 (en) 2003-08-07 2004-08-09 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US11/075,626 Continuation-In-Part US7693725B2 (en) 2003-08-07 2005-03-08 Method and system for greenhouse gas emissions performance assessment and allocation
US11/488,266 Continuation US7233910B2 (en) 2003-08-07 2006-07-18 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities

Publications (1)

Publication Number Publication Date
US20050038667A1 true US20050038667A1 (en) 2005-02-17

Family

ID=34135205

Family Applications (3)

Application Number Title Priority Date Filing Date
US10/913,728 Abandoned US20050038667A1 (en) 2003-08-07 2004-08-09 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities
US11/488,266 Active US7233910B2 (en) 2003-08-07 2006-07-18 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities
US11/732,037 Abandoned US20080201181A1 (en) 2003-08-07 2007-04-02 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities

Family Applications After (2)

Application Number Title Priority Date Filing Date
US11/488,266 Active US7233910B2 (en) 2003-08-07 2006-07-18 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities
US11/732,037 Abandoned US20080201181A1 (en) 2003-08-07 2007-04-02 System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities

Country Status (2)

Country Link
US (3) US20050038667A1 (en)
WO (1) WO2005015476A2 (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060080171A1 (en) * 2004-10-08 2006-04-13 Jardins G T D Managing advertising inventory
US20070061156A1 (en) * 2005-09-09 2007-03-15 Qwest Communications International Inc. Compliance assurance systems and methods
US20070061157A1 (en) * 2005-09-09 2007-03-15 Qwest Communications International Inc. Obligation assignment systems and methods
US20070061158A1 (en) * 2005-09-09 2007-03-15 Qwest Communications International Inc. Compliance management using complexity factors
US20070143355A1 (en) * 2005-12-13 2007-06-21 Qwest Communications International Inc. Regulatory compliance advisory request system
US20080262898A1 (en) * 2004-12-09 2008-10-23 Tonchev Angel D Method For Measuring The Overall Operational Performance Of Hydrocarbon Facilities
US20090093998A1 (en) * 2006-05-09 2009-04-09 Hsb Solomon Associates Performance analysis system and method
US20090182771A1 (en) * 2008-01-15 2009-07-16 International Business Machines Corporation Method and apparatus for information boosting in related but disconnected databases
US20100299105A1 (en) * 2009-05-20 2010-11-25 Honeywell International Inc. Online condition-based monitoring for tank farms
US8103546B1 (en) 2004-08-16 2012-01-24 Lightningcast Llc Advertising content delivery
CN103140866A (en) * 2010-10-06 2013-06-05 纳尔科公司 Method and apparatus for chemical data repository
US20130253685A1 (en) * 2007-08-30 2013-09-26 John P. Havener Control asset comparative performance analysis system and methodology
US9069725B2 (en) 2011-08-19 2015-06-30 Hartford Steam Boiler Inspection & Insurance Company Dynamic outlier bias reduction system and method
US9111212B2 (en) 2011-08-19 2015-08-18 Hartford Steam Boiler Inspection And Insurance Company Dynamic outlier bias reduction system and method
CN105023061A (en) * 2015-07-17 2015-11-04 北京首钢自动化信息技术有限公司 Steel enterprise gas balancing scheduling system and method based on result of prediction model
US10409891B2 (en) 2014-04-11 2019-09-10 Hartford Steam Boiler Inspection And Insurance Company Future reliability prediction based on system operational and performance data modelling
US10557840B2 (en) 2011-08-19 2020-02-11 Hartford Steam Boiler Inspection And Insurance Company System and method for performing industrial processes across facilities
US11132705B1 (en) 2004-10-08 2021-09-28 Verizon Media Inc. Managing advertising inventory
US11288602B2 (en) 2019-09-18 2022-03-29 Hartford Steam Boiler Inspection And Insurance Company Computer-based systems, computing components and computing objects configured to implement dynamic outlier bias reduction in machine learning models
US11328177B2 (en) 2019-09-18 2022-05-10 Hartford Steam Boiler Inspection And Insurance Company Computer-based systems, computing components and computing objects configured to implement dynamic outlier bias reduction in machine learning models
US11615348B2 (en) 2019-09-18 2023-03-28 Hartford Steam Boiler Inspection And Insurance Company Computer-based systems, computing components and computing objects configured to implement dynamic outlier bias reduction in machine learning models
US11636292B2 (en) 2018-09-28 2023-04-25 Hartford Steam Boiler Inspection And Insurance Company Dynamic outlier bias reduction system and method

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040215697A1 (en) * 2003-04-11 2004-10-28 Vasileios Vergopoulos Systems and methods for managing unit operating data
US7958001B2 (en) * 2004-04-28 2011-06-07 Swiss Reinsurance Company Computer-based method for assessing competence of an organization
US8768664B2 (en) * 2005-03-18 2014-07-01 CMC Solutions, LLC. Predictive emissions monitoring using a statistical hybrid model
US7421348B2 (en) * 2005-03-18 2008-09-02 Swanson Brian G Predictive emissions monitoring method
US20080033786A1 (en) * 2006-08-04 2008-02-07 General Electric Company Power generation mix forecasting modeling method
US7941296B2 (en) * 2007-04-27 2011-05-10 Hsb Solomon Associates, Llc Benchmarking and gap analysis system and method
US20090089154A1 (en) * 2007-09-29 2009-04-02 Dion Kenneth W System, method and computer product for implementing a 360 degree critical evaluator
US20090160760A1 (en) * 2007-12-19 2009-06-25 Good Way Technology Co., Ltd. Multi-functional presenter
US8606623B1 (en) * 2008-03-31 2013-12-10 Knowledgepoint 360 Group, LLC Organization and peer set metric for generating and displaying benchmarking information
US20110066472A1 (en) * 2009-09-17 2011-03-17 Pedro Cabrera Scheider Internet-Based Benchmarking System and Method for Evaluating and Comparing Businesses Using Metrics
US20110295648A1 (en) * 2010-05-27 2011-12-01 Marty Nicholas Computer and Computer Program for Evaluating the Sales Force Effectiveness of a Selected Business
CN102646160A (en) * 2012-02-21 2012-08-22 北京工业大学 Regional water pollution comprehensive evaluation and optimization method based on entropy weight fuzzy matter element method
US10546252B2 (en) 2012-03-19 2020-01-28 International Business Machines Corporation Discovery and generation of organizational key performance indicators utilizing glossary repositories
US8855968B1 (en) 2012-12-10 2014-10-07 Timothy Lynn Gillis Analytical evaluation tool for continuous process plants
US9740363B2 (en) * 2013-10-02 2017-08-22 Velocity Technology Solutions, Inc. Methods and systems for managing community information
US10088507B2 (en) 2014-12-03 2018-10-02 Saudi Arabian Oil Company Energy performance metric in hydrocarbon-producing facilities
CN105514974B (en) * 2015-11-27 2018-07-20 广州供电局有限公司 The remodeling method and system of electric energy metering device in electric system
CN105825351A (en) * 2016-04-22 2016-08-03 国网浙江省电力公司经济技术研究院 Post evaluation method and risk management and control method of construction cost of power transmission project
CN106384004A (en) * 2016-09-22 2017-02-08 上海化工研究院 Method for evaluating power consumption of compound fertilizer production equipment
US20230060245A1 (en) * 2021-08-24 2023-03-02 Account Spark, Inc. System and method for automated account profile scoring on customer relationship management platforms

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5500795A (en) * 1992-07-30 1996-03-19 Teknekron Infoswitch Corporation Method and system for monitoring and controlling the performance of a call processing center
US20010032195A1 (en) * 2000-03-30 2001-10-18 Graichen Catherine Mary System and method for identifying productivity improvements in a business organization
US20020165750A1 (en) * 2001-05-04 2002-11-07 Christophe Fouquet Facility modelization for facility benchmarking
US20020194329A1 (en) * 2001-05-02 2002-12-19 Shipley Company, L.L.C. Method and system for facilitating multi-enterprise benchmarking activities and performance analysis
US6509730B1 (en) * 2000-02-25 2003-01-21 International Resources Group Ltd. Method of environmental performance measurement
US20030046137A1 (en) * 2001-08-28 2003-03-06 International Business Machines Corporation Method and system for generating a value proposition for a company in an industry
US20030149613A1 (en) * 2002-01-31 2003-08-07 Marc-David Cohen Computer-implemented system and method for performance assessment
US20030182181A1 (en) * 2002-03-12 2003-09-25 Kirkwood Kenneth Scott On-line benchmarking
US20040032420A1 (en) * 2002-08-13 2004-02-19 Allen Bradley J. Interactive benchmarking system
US6738744B2 (en) * 2000-12-08 2004-05-18 Microsoft Corporation Watermark detection via cardinality-scaled correlation
US20040243462A1 (en) * 2003-05-29 2004-12-02 Stier Randy S. Method for benchmarking and scoring processes and equipment related practices and procedures
US6877034B1 (en) * 2000-08-31 2005-04-05 Benchmark Portal, Inc. Performance evaluation through benchmarking using an on-line questionnaire based system and method
US20050091102A1 (en) * 2003-10-24 2005-04-28 Theodora Retsina A method and system for manufacturing facility performance indicator benchmarking

Family Cites Families (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5684964A (en) * 1992-07-30 1997-11-04 Teknekron Infoswitch Corporation Method and system for monitoring and controlling the performance of an organization
JP2002526852A (en) * 1998-10-06 2002-08-20 パヴィリオン・テクノロジーズ・インコーポレイテッド Method and system for monitoring and controlling a manufacturing system
US6473084B1 (en) * 1999-09-08 2002-10-29 C4Cast.Com, Inc. Prediction input
AU2001259992B2 (en) * 2000-05-17 2006-02-16 Tvc International Inc. Continuously updated data processing system and method for measuring and reporting on value creation performance
US6754673B2 (en) * 2000-06-14 2004-06-22 General Electric Company Method and system for assessing plant parameters and performance over a global network
US6988092B1 (en) * 2000-12-28 2006-01-17 Abb Research Ltd. Method for evaluation of energy utilities
US6836731B1 (en) * 2001-02-05 2004-12-28 Schlumberger Technology Corporation Method and system of determining well performance
US20020161624A1 (en) * 2001-02-16 2002-10-31 Bradlee Robert S. Decision support for automated power trading
AUPR319801A0 (en) * 2001-02-20 2001-03-15 CRC for Sustainable Tourism Pty Limited Sustainability expert system for travel and tourism
US8788452B2 (en) * 2001-03-08 2014-07-22 Deloitte Development Llc Computer assisted benchmarking system and method using induction based artificial intelligence
AU2002305084A1 (en) * 2001-03-23 2002-10-08 Tokyo Electron Limited Method and apparatus for endpoint detection using partial least squares
US6454729B1 (en) * 2001-05-11 2002-09-24 Abbott Laboratories Data processing method for interpretation of measurements of growth
US20050283428A1 (en) * 2001-06-05 2005-12-22 Carlton Bartels Systems and methods for electronic trading of carbon dioxide equivalent emission
US6826575B1 (en) * 2001-09-13 2004-11-30 Mci, Inc. Data miner
US20030097243A1 (en) * 2001-10-23 2003-05-22 Mays Thomas Gilmore Method and system for operating a hydrocarbon production facility
US6732055B2 (en) 2001-11-06 2004-05-04 General Electric Company Methods and systems for energy and emissions monitoring
US6904336B2 (en) 2001-12-28 2005-06-07 Fannie Mae System and method for residential emissions trading
US20040088179A1 (en) 2002-11-06 2004-05-06 Cogen Jack D. Emissions reduction portfolio
AU2003295825A1 (en) 2002-11-26 2004-06-18 Agcert International, Llc System and method of creating, aggregating, and transferring environmental emission reductions
KR100445427B1 (en) * 2002-12-07 2004-08-25 한국전자통신연구원 System and Method for generating micro-array data class model using radial basis functions
US20040143467A1 (en) 2003-01-22 2004-07-22 Mcallister Richard Eugene Method and system for optimization of environmental compliance
US20040215545A1 (en) * 2003-01-31 2004-10-28 Kabushiki Kaisha Toshiba Power trading risk management system
US7457758B2 (en) * 2003-02-10 2008-11-25 South Dakota School Of Mines And Technology Method and apparatus for generating standardized carbon emission reduction credits
US7850660B2 (en) * 2003-12-19 2010-12-14 Ethicon Endo-Surgery, Inc. Implantable medical device with simultaneous attachment mechanism and method

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5500795A (en) * 1992-07-30 1996-03-19 Teknekron Infoswitch Corporation Method and system for monitoring and controlling the performance of a call processing center
US6509730B1 (en) * 2000-02-25 2003-01-21 International Resources Group Ltd. Method of environmental performance measurement
US20010032195A1 (en) * 2000-03-30 2001-10-18 Graichen Catherine Mary System and method for identifying productivity improvements in a business organization
US6877034B1 (en) * 2000-08-31 2005-04-05 Benchmark Portal, Inc. Performance evaluation through benchmarking using an on-line questionnaire based system and method
US6738744B2 (en) * 2000-12-08 2004-05-18 Microsoft Corporation Watermark detection via cardinality-scaled correlation
US20020194329A1 (en) * 2001-05-02 2002-12-19 Shipley Company, L.L.C. Method and system for facilitating multi-enterprise benchmarking activities and performance analysis
US20020165750A1 (en) * 2001-05-04 2002-11-07 Christophe Fouquet Facility modelization for facility benchmarking
US20030046137A1 (en) * 2001-08-28 2003-03-06 International Business Machines Corporation Method and system for generating a value proposition for a company in an industry
US20030149613A1 (en) * 2002-01-31 2003-08-07 Marc-David Cohen Computer-implemented system and method for performance assessment
US20030182181A1 (en) * 2002-03-12 2003-09-25 Kirkwood Kenneth Scott On-line benchmarking
US20040032420A1 (en) * 2002-08-13 2004-02-19 Allen Bradley J. Interactive benchmarking system
US20040243462A1 (en) * 2003-05-29 2004-12-02 Stier Randy S. Method for benchmarking and scoring processes and equipment related practices and procedures
US20050091102A1 (en) * 2003-10-24 2005-04-28 Theodora Retsina A method and system for manufacturing facility performance indicator benchmarking

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8103546B1 (en) 2004-08-16 2012-01-24 Lightningcast Llc Advertising content delivery
US8401901B2 (en) 2004-08-16 2013-03-19 Facebook, Inc. Advertising content delivery
US11132705B1 (en) 2004-10-08 2021-09-28 Verizon Media Inc. Managing advertising inventory
US20060080171A1 (en) * 2004-10-08 2006-04-13 Jardins G T D Managing advertising inventory
US20080262898A1 (en) * 2004-12-09 2008-10-23 Tonchev Angel D Method For Measuring The Overall Operational Performance Of Hydrocarbon Facilities
US20070061156A1 (en) * 2005-09-09 2007-03-15 Qwest Communications International Inc. Compliance assurance systems and methods
US20070061157A1 (en) * 2005-09-09 2007-03-15 Qwest Communications International Inc. Obligation assignment systems and methods
US20070061158A1 (en) * 2005-09-09 2007-03-15 Qwest Communications International Inc. Compliance management using complexity factors
US20070143355A1 (en) * 2005-12-13 2007-06-21 Qwest Communications International Inc. Regulatory compliance advisory request system
US20090093997A1 (en) * 2006-05-09 2009-04-09 Hsb Solomon Associates Performance analysis system and method
US20090093996A1 (en) * 2006-05-09 2009-04-09 Hsb Solomon Associates Performance analysis system and method
US8050889B2 (en) * 2006-05-09 2011-11-01 Hsb Solomon Associates, Llc Performance analysis system and method
US8055472B2 (en) * 2006-05-09 2011-11-08 Hsb Solomon Associates, Llc Performance analysis system and method
US8060341B2 (en) * 2006-05-09 2011-11-15 Hsb Solomon Associates, Llc Performance analysis system and method
US20090093998A1 (en) * 2006-05-09 2009-04-09 Hsb Solomon Associates Performance analysis system and method
US20130253685A1 (en) * 2007-08-30 2013-09-26 John P. Havener Control asset comparative performance analysis system and methodology
US8126758B2 (en) * 2008-01-15 2012-02-28 International Business Machines Corporation Method and apparatus for information boosting in related but disconnected databases
US20090182771A1 (en) * 2008-01-15 2009-07-16 International Business Machines Corporation Method and apparatus for information boosting in related but disconnected databases
US8249829B2 (en) * 2009-05-20 2012-08-21 Honeywell International Inc. Online condition-based monitoring for tank farms
WO2010135227A3 (en) * 2009-05-20 2011-02-24 Honeywell International Inc. Online condition-based monitoring for tank farms
US20100299105A1 (en) * 2009-05-20 2010-11-25 Honeywell International Inc. Online condition-based monitoring for tank farms
CN103140866A (en) * 2010-10-06 2013-06-05 纳尔科公司 Method and apparatus for chemical data repository
US10557840B2 (en) 2011-08-19 2020-02-11 Hartford Steam Boiler Inspection And Insurance Company System and method for performing industrial processes across facilities
US9111212B2 (en) 2011-08-19 2015-08-18 Hartford Steam Boiler Inspection And Insurance Company Dynamic outlier bias reduction system and method
US9069725B2 (en) 2011-08-19 2015-06-30 Hartford Steam Boiler Inspection & Insurance Company Dynamic outlier bias reduction system and method
US11334645B2 (en) 2011-08-19 2022-05-17 Hartford Steam Boiler Inspection And Insurance Company Dynamic outlier bias reduction system and method
US11868425B2 (en) 2011-08-19 2024-01-09 Hartford Steam Boiler Inspection And Insurance Company Dynamic outlier bias reduction system and method
US10409891B2 (en) 2014-04-11 2019-09-10 Hartford Steam Boiler Inspection And Insurance Company Future reliability prediction based on system operational and performance data modelling
US11550874B2 (en) 2014-04-11 2023-01-10 Hartford Steam Boiler Inspection And Insurance Company Future reliability prediction based on system operational and performance data modelling
CN105023061A (en) * 2015-07-17 2015-11-04 北京首钢自动化信息技术有限公司 Steel enterprise gas balancing scheduling system and method based on result of prediction model
US11636292B2 (en) 2018-09-28 2023-04-25 Hartford Steam Boiler Inspection And Insurance Company Dynamic outlier bias reduction system and method
US11803612B2 (en) 2018-09-28 2023-10-31 Hartford Steam Boiler Inspection And Insurance Company Systems and methods of dynamic outlier bias reduction in facility operating data
US11288602B2 (en) 2019-09-18 2022-03-29 Hartford Steam Boiler Inspection And Insurance Company Computer-based systems, computing components and computing objects configured to implement dynamic outlier bias reduction in machine learning models
US11328177B2 (en) 2019-09-18 2022-05-10 Hartford Steam Boiler Inspection And Insurance Company Computer-based systems, computing components and computing objects configured to implement dynamic outlier bias reduction in machine learning models
US11615348B2 (en) 2019-09-18 2023-03-28 Hartford Steam Boiler Inspection And Insurance Company Computer-based systems, computing components and computing objects configured to implement dynamic outlier bias reduction in machine learning models

Also Published As

Publication number Publication date
WO2005015476A3 (en) 2005-12-22
US20080201181A1 (en) 2008-08-21
WO2005015476A2 (en) 2005-02-17
US20060259352A1 (en) 2006-11-16
US7233910B2 (en) 2007-06-19

Similar Documents

Publication Publication Date Title
US7233910B2 (en) System and method for determining equivalency factors for use in comparative performance analysis of industrial facilities
US20230169146A1 (en) Future reliability prediction based on system operational and performance data modelling
US7693725B2 (en) Method and system for greenhouse gas emissions performance assessment and allocation
Baryannis et al. Supply chain risk management and artificial intelligence: state of the art and future research directions
Yazdi et al. A novel extension of DEMATEL approach for probabilistic safety analysis in process systems
Zhou et al. Analysis of risk priorities for renewable energy investment projects using a hybrid IT2 hesitant fuzzy decision-making approach with alpha cuts
Chen et al. Supplier selection using consistent fuzzy preference relations
EP2013844A1 (en) Emission trading product and method
Koenig et al. Improving measurement and prediction in personnel selection through the application of machine learning
Alnaqbi et al. Impact of horizontal mergers on supply chain performance: The case of the upstream oil and gas industry
Ristanović et al. Application of Multi-Criteria Assessment in Banking Risk Management
Jomthanachai et al. An application of machine learning to logistics performance prediction: an economics attribute-based of collective instance
Pandey et al. Higher moments and probability distribution of maintenance cost in the delay time model
Woldesenbet Highway infrastructure data and information integration & assessment framework: A data-driven decision-making approach
Barabady Production Assurance: Concept, implementation and improvement
Long Chen Logit models for early warning of distressed capital projects
Van Niekerk A Study of the data mining of meeting minutes of construction projects
Vinod et al. Supply Chain Management Efficiency Improvement in the Automobile Industry Using Lean Six Sigma and Artificial Neural Network
Farouk An Artificial Intelligence Tool for the Selection of Delay Analysis Technique in Construction
Muzorewa Reliability prediction of household electro-mechanical appliances using current technology
Di Lullo Developing a Framework for Improving the Accuracy of Process-based LCA for Energy Pathways
Cornalba et al. Bayesian networks for operational risk management, compliant with Basel II
Janssen Neural network based model for productivity in software development
van Brenk Reducing the impact of uncertain machine capacity on supply chain performance
Riyadi et al. INTERNATIONAL JOURNAL OF CREATIVE RESEARCH AND STUDIES

Legal Events

Date Code Title Description
AS Assignment

Owner name: HSB SOLOMON ASSOCATES, LLC, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HILEMAN, MICHAEL J.;BROADFOOT, ROBERT;JONES, RICHARD B.;REEL/FRAME:015671/0171

Effective date: 20040804

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION