CN101435262B - Overhead floor structure - Google Patents

Overhead floor structure Download PDF

Info

Publication number
CN101435262B
CN101435262B CN2008101866769A CN200810186676A CN101435262B CN 101435262 B CN101435262 B CN 101435262B CN 2008101866769 A CN2008101866769 A CN 2008101866769A CN 200810186676 A CN200810186676 A CN 200810186676A CN 101435262 B CN101435262 B CN 101435262B
Authority
CN
China
Prior art keywords
unit
floor structure
elevated floor
flat layer
support unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008101866769A
Other languages
Chinese (zh)
Other versions
CN101435262A (en
Inventor
林光亮
戴维修
林志宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AU Optronics Corp
Original Assignee
AU Optronics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AU Optronics Corp filed Critical AU Optronics Corp
Priority to CN2008101866769A priority Critical patent/CN101435262B/en
Publication of CN101435262A publication Critical patent/CN101435262A/en
Application granted granted Critical
Publication of CN101435262B publication Critical patent/CN101435262B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

Disclosed is an elevated floor structure, which is applied by matching a support unit. The elevated floor structure comprises a base layer, a plate layer, a height adjusting unit, and a structure reinforcing unit, wherein, the support unit is fixed at the base layer; the plate layer is provided with at least on opening to allow the support unit to pass through the plate layer; the height adjusting unit is arranged between the base layer and the plate layer; and the structure reinforcing unit is used for linking the plate layer and the support unit.

Description

Elevated floor structure
Technical field
The present invention relates to a kind of elevated floor structure, the mode that relates in particular to a kind of structural strengthening makes the raised floor after the perforate cutting can receive the limit and fixes.
Background technology
Existing elevated floor structure kenel timely as shown in Figure 1, it is provided with flat layer 14 on basalis 12, and be provided with elevation adjustment unit 16 between flat layer 14 and the basalis 12, wherein these a little elevation adjustment units 16 are in order to adjusting the height between flat layer 14 and the basalis 12, and are arranged on the corner of flat layer 14.When desiring (for example: overhead conveyer belt to set up a device 2, over head conveyer, OHCV) when elevated floor structure 1, must on flat layer 14, offer most perforate O for passing, make device 2 can be fixed in the basalis 12 of elevated floor structure 1 by support unit 3 with device 2 support units that are connected 3.
But, because of flat layer 14 is offered perforate O part easy deformation or is subsided, offer the structural strength of the flat layer 14 of perforate O for reinforcement, must around perforate O, set up extra assembly, for example be arranged at and shore unit 18 between flat layer 14 and the basalis 12, yet so can increase the complicated degree of assembling of elevated floor structure 1.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of elevated floor structure, it is by linking a structure between flat layer and support unit, be provided with the structural strength of the flat layer of perforate so as to reinforcement, avoid elevated floor structure to subside, and save the expense that elevated floor structure is received the limit.
The object of the present invention is to provide a kind of elevated floor structure, it directly is linked to reinforced structure the periphery of perforate, so that the construction of elevated floor structure shortened man-hour, and saves the space of setting up of elevated floor structure.
For reaching above-mentioned purpose, the present invention discloses a kind of elevated floor structure, itself and a support unit fit applications, and the disclosed elevated floor structure of the present invention comprises a basalis, a flat layer, an elevation adjustment unit and a structural strengthening unit.Wherein, basalis connects support unit in order to the fixed support unit; Flat layer is parallel with basalis and have at least one perforate and pass flat layer for support unit; The elevation adjustment unit is arranged between basalis and the flat layer; The structural strengthening unit then is in order to link flat layer and support unit.
From the above, the disclosed elevated floor structure of the present invention can be by being provided with the mode of a structural strengthening unit between flat layer and support unit, the direct structural strength of reinforcement tapping, and use the complicated additional assemblies of assembling as the existing unit of shoring timely so as to avoiding.Compare with prior art, elevated floor structure of the present invention can firmly fix elevated floor structure and the problem avoiding subsiding, also can save simultaneously elevated floor structure and receive the expense on limit, in addition, because the volume that the structural strengthening unit is shared is also little, therefore can save the installing space of elevated floor structure, more because the installing flow process of elevated floor structure is quite simple and easy, be with, can reduce man-hour of installing.
Describe the present invention below in conjunction with the drawings and specific embodiments, but not as a limitation of the invention.
Description of drawings
Fig. 1 is a kind of schematic diagram of existing elevated floor structure;
Fig. 2 is the enforcement aspect of the disclosed a kind of elevated floor structure of the present invention;
Fig. 3 A is the last TV structure schematic diagram of the disclosed a kind of elevated floor structure of the present invention;
Fig. 3 B is the last TV structure schematic diagram of the disclosed another kind of elevated floor structure of the present invention;
Fig. 4 is the structural representation of the disclosed structural strengthening of the present invention unit;
Fig. 5 A is the structural representation of a kind of auxiliary reinforcement unit in the disclosed elevated floor structure of the present invention; And
Fig. 5 B is the structural representation of another kind of auxiliary reinforcement unit in the disclosed elevated floor structure of the present invention.
Wherein, Reference numeral:
1,4: elevated floor structure
12,42: basalis
14,44: flat layer
16,46: the elevation adjustment unit
18: shore the unit
2,5: device
3,6: support unit
7: fixed cell
8: the structural strengthening unit
81: trimming part
9: auxiliary reinforcement unit
O: perforate
The specific embodiment
Please refer to following correlative type, with the disclosed elevated floor structure of aid illustration the present invention.
Please refer to shown in Figure 2ly, it is for the enforcement aspect of the disclosed a kind of elevated floor structure of the present invention.This elevated floor structure 4 and a support unit 6 fit applications, and support unit 6 is the example explanation in the device shown in this 5 with overhead conveyer belt (OHCV), but is not limited thereto in order to support a device 5.Wherein, elevated floor structure 4 comprises a basalis 42, a flat layer 44, an elevation adjustment unit 46 and a structural strengthening unit 8.
In more detail, basalis 42 is positioned under the support unit 6 and with support unit 6 has one to be connected contact in order to fixed support unit 6, flat layer 44 is parallel to basalis 42 and has at least one perforate O and passes for support unit 6, and the position of offering perforate O is not restricted to the corner of flat layer 44, in other words, perforate O may be arranged on arbitrary position of flat layer 44, the just corner of flat layer 44 or middle section.
Elevation adjustment unit 46 is arranged between basalis 42 and the flat layer 44, can adjust spacing between flat layer 44 and the basalis 42 by elevation adjustment unit 46 so as to making between flat layer 44 and the basalis 42, and support plate layer 44 simultaneously.
8 of structural strengthening unit are in order to link flat layer 44 and support unit 6, in more detail, when support unit 6 passes perforate O on the flat layer 44, be not subjected to the influence of perforate O for the structural strength that makes flat layer 44, by Fig. 2 see as can be known, structural strengthening unit 8 is arranged on the periphery of perforate O on the flat layer 44, and, structural strengthening unit 8 more is arranged at flat layer 44 and support unit 6 formed corner parts, in other words, one side of structural strengthening unit 8 is linked to flat layer 44, and opposite side then is linked to support unit 6.
In addition, see it from the upward angle of visibility degree of elevated floor structure 3, it is shown in Fig. 3 A and Fig. 3 B, structure at the edge of flat layer 44 all utilizes elevation adjustment unit 46 so that flat layer 44 is supported on the basalis 42, and when no matter perforate O is opened in the wherein corner (as shown in Figure 3A) of flat layer 44 or middle section (shown in Fig. 3 B), structural strengthening unit 8 all is arranged at the periphery of perforate O, so that the flat layer 44 that links with it can be by structural strengthening unit 8 to strengthen integrally-built intensity, the situation of avoiding flat layer 44 to subside or break in the position that offers perforate O with support unit 6.
Wherein, the connection relationship between connection relationship between structural strengthening unit 8 and the flat layer 44 and structural strengthening unit 8 and the support unit 6 can be respectively by sealed, engage or bonding mode is achieved.
In addition, referring again to Fig. 4 and shown in Figure 2, wherein Fig. 4 is the structural representation of structural strengthening unit 8, and structural strengthening unit 8 has a trimming part 81 near a side of support unit 6, so as to the height between inching flat layer 44 and the basalis 42.
And above-mentioned structural strengthening unit 8 is the example explanation with the leg-of-mutton structure person of class, but in fact, the kenel of structural strengthening unit 8 also can be the structure of L font or the structure of other Any shape, and the present invention does not limit at the outward appearance kenel of structural strengthening unit 8.And, can select for use material to include metal, acryl or pottery with regard to the material of structural strengthening unit 8.
What deserves to be mentioned is that the disclosed elevated floor structure 4 of the present invention also comprises a fixed cell 7, it can be arranged between support unit 6 and the basalis 42, so as to support unit 6 is fixed in basalis 42; Simultaneously, the disclosed elevated floor structure 4 of the present invention also comprises an auxiliary reinforcement unit 9, wherein, this auxiliary reinforcement unit 9 can be linked between fixed cell 7 and the structural strengthening unit 8, its structure is shown in Fig. 5 A, also or can be linked between basalis 42 and the structural strengthening unit 8, its structure is shown in Fig. 5 B.
Be can be by the mode of a structural strengthening unit is set between flat layer and support unit with, the disclosed elevated floor structure of the present invention, the directly structural strength of reinforcement tapping, and additional assemblies so as to avoiding using assembling complicated.Compare with prior art, elevated floor structure of the present invention can firmly fix the problem of elevated floor structure to avoid subsiding, also can save simultaneously elevated floor structure and receive the expense on limit, in addition, because the shared volume in structural strengthening unit has now still less, therefore can save the installing space of elevated floor structure, more because the installing flow process of elevated floor structure is quite simple and easy, be with, can reduce man-hour of installing.
Certainly; the present invention also can have other various embodiments; under the situation that does not deviate from spirit of the present invention and essence thereof; those of ordinary skill in the art work as can make various corresponding changes and distortion according to the present invention, but these corresponding changes and distortion all should belong to the protection domain of the appended claim of the present invention.

Claims (7)

1. elevated floor structure with a support unit fit applications, is characterized in that this elevated floor structure comprises:
One basalis connects this support unit in order to fix this support unit;
One flat layer is parallel to this basalis, has at least one perforate and passes this flat layer for this support unit;
One elevation adjustment unit is arranged between this basalis and this flat layer;
One structural strengthening unit links this flat layer and this support unit;
One fixed cell is arranged between this support unit and this basalis, to fix this support unit; And
One auxiliary reinforcement unit links this fixed cell and this structural strengthening unit, perhaps, links this basalis and this structural strengthening unit.
2. elevated floor structure according to claim 1 is characterized in that, this structural strengthening unit is arranged at this flat layer and the formed corner part of this support unit.
3. elevated floor structure according to claim 1 is characterized in that, that this structural strengthening unit and the mode of connection of this flat layer comprise is sealed, engage or bonding.
4. elevated floor structure according to claim 1 is characterized in that, that this structural strengthening unit and the mode of connection of this support unit comprise is sealed, engage or bonding.
5. elevated floor structure according to claim 1 is characterized in that, the material of this structural strengthening unit is metal, acryl or pottery.
6. elevated floor structure according to claim 1 is characterized in that, the L-shaped or class triangle in this structural strengthening unit.
7. elevated floor structure according to claim 1 is characterized in that, this structural strengthening unit has a trimming part near a side of this support unit, to adjust the height between this flat layer and this basalis.
CN2008101866769A 2008-12-16 2008-12-16 Overhead floor structure Expired - Fee Related CN101435262B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101866769A CN101435262B (en) 2008-12-16 2008-12-16 Overhead floor structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101866769A CN101435262B (en) 2008-12-16 2008-12-16 Overhead floor structure

Publications (2)

Publication Number Publication Date
CN101435262A CN101435262A (en) 2009-05-20
CN101435262B true CN101435262B (en) 2010-08-25

Family

ID=40709882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101866769A Expired - Fee Related CN101435262B (en) 2008-12-16 2008-12-16 Overhead floor structure

Country Status (1)

Country Link
CN (1) CN101435262B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5477649A (en) * 1993-04-30 1995-12-26 Airtite Contractors Inc. Raised floor cable trough system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5477649A (en) * 1993-04-30 1995-12-26 Airtite Contractors Inc. Raised floor cable trough system

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
JP特开2000-145113A 2000.05.26
JP特开2003-221924A 2003.08.08
JP特开2008-25160A 2008.02.07
JP特开平11-247420A 1999.09.14
JP特开平9-13633A 1997.01.14

Also Published As

Publication number Publication date
CN101435262A (en) 2009-05-20

Similar Documents

Publication Publication Date Title
CN101190723B (en) Vessel for containing protection thin film components
CN101435262B (en) Overhead floor structure
CN104699298A (en) Touch control display device
CN104326344B (en) Point variable frequency door machine sedan-chair top mounting bracket device in one
CN102759079A (en) Back plate resisting external force as well as backlight module and liquid crystal display thereof
CN206352397U (en) A kind of auxiliary mould for being used to connect pillar and take over a business
CN102734759A (en) Backlight module, connecting component and mounting and dismounting method thereof
CN205387059U (en) Back door and vehicle
US10663784B2 (en) Liquid crystal display device and display
CN210978746U (en) A antidetonation gallows for tuber pipe is fixed
CN204507017U (en) A kind of vehicle side threshold strength beam after poppet
CN210002922U (en) section steel concrete column base protection device
CN208615696U (en) A kind of automobile and its tailgate outside plate
CN102865520B (en) A kind of liquid crystal indicator and backlight module thereof
KR20210061251A (en) Clamping device for euro form
CN204150889U (en) In point variable frequency door machine sedan-chair top mounting bracket device
CN205973538U (en) Elevating gear top support
CN206294230U (en) One kind is resistance to fall Sapphire mobile phone cover plate
CN206615892U (en) A kind of hollow cage guide mounting assembly
CN201568695U (en) Subbase connection support and television set
CN108086862A (en) A kind of window frame convenient for connection
CN109610741A (en) A kind of hyperboloid metal Roof and its building method
CN103936291A (en) Bearing Device Frame Structure
CN210363680U (en) Novel ESP installing support
CN217817387U (en) Air conditioner rear panel maintenance window and air conditioner rear panel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100825

Termination date: 20201216